← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
The Charleston Condominium
225 EAST 34 STREET · Murray Hill-Kips Bay · BIN 1087675
💬 Discuss this project
2007Year Built
22Stories
RMBuilding Class
C1-9AZoning
206,121 sfGross Floor Area
191Units
LL97 CoveredRent Stabilized12 Open Violations ▸FISP: SAFE
Condo, residential tower (mixed-use, multi-family elevator) [derived] · 15,800 sf lot · 13.05 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalGeneral
Roof1p · 1 filing · 5 docs
Floor 204p · 1 filing · 3 docs
Floor 19
Floor 18
Floor 17
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DOUGLAS ELLIMAN PROPERTY MANAGEMENT304/09/2026
CHARLESTON CONDOMINIUM2003/22/2026
PLAZA CONSTRUCTION503/22/2026
225 E 34 STREET LLC SUITE103/22/2026
225 E 34 ST LLC SUITE 10103/22/2026
BENENSON MANAGEMENT203/22/2026
THE BENESON CAPITAL CO303/22/2026
NEURO REAL ESTATE1203/21/2026
225 EAST 34 ST1403/21/2026
225 EAST 34TH STREET1003/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RHL ENGINEERING110/12/2025
BR DESIGN ASSOCIATES LLC107/03/2024
PAUL PERDEK, PROF. ENG. PLLC102/19/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RIZZO GROUP103/21/2026
AE DESIGN SOLUTION203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
POWERS BRIDGING & SCAFFOLDINGGeneral Contractor507/08/2026
MARIO CASTROElectrical103/21/2026
POWER SURGE ELECTRIC, INCElectrical103/22/2026
YEVGENY KOLTUNOVElectrical103/21/2026
ICON INTERIORS INCGeneral Contractor107/08/2026
LTB MECHANICAL CORPGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
KZ ENGINEERING, P.C.4665108/12/2026
RHL ENGINEERING, LLC712110/12/2025
Building Lifecycle
All (95)Filed (4)Permit Issued (5)Signed Off (2)Facade (FISP) (12)Violation (60)Inspection (2)Special Inspection (10)
08/12/2026
Filed — Alteration
INSTALLATION OF A SUSPENDED SCAFFOLD FOR FACADE INSPECTION/ REPAIR AS PER PLAN SUBMITTED
M01443290-I1
08/12/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Karol Zdancewicz
08/12/2026
Special inspection requirement — Post-installed Anchors
Karol Zdancewicz
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/03/2025
Signed off — Alteration
INSTALLATION OF ONE (1) REPLACEMENT PACKAGED ROOFTOP ELECTRIC HEAT PUMP UNIT TO PROVIDE 100% OUTDOOR AIR FOR RESIDENTIAL HALLWAY VENTILATION. NO CHANGE IN EGRESS, USE OR OCCUPANCy
M01290822-I1
10/23/2025
Permit issued — Mechanical Systems
M01290822-I1-MS
10/12/2025
Filed — Alteration
INSTALLATION OF ONE (1) REPLACEMENT PACKAGED ROOFTOP ELECTRIC HEAT PUMP UNIT TO PROVIDE 100% OUTDOOR AIR FOR RESIDENTIAL HALLWAY VENTILATION. NO CHANGE IN EGRESS, USE OR OCCUPANCy
M01290822-I1
09/24/2025
Special inspection requirement — Energy Code Compliance Inspections
RICHARD LEMANSKY
09/24/2025
Special inspection requirement — HVAC-R and service water heating equipment
RICHARD LEMANSKY
09/24/2025
Special inspection requirement — Tenant Protection Plan Compliance
Vincent Gentile
09/24/2025
Special inspection requirement — HVAC-R and service water heating system controls
RICHARD LEMANSKY
09/24/2025
Special inspection requirement — Maintenance information
RICHARD LEMANSKY
09/21/2025
Special inspection requirement — Final
RICHARD LEMANSKY
09/21/2025
Special inspection requirement — Mechanical Systems
Vincent Gentile
10/17/2024
Signed off — Alteration
General Construction to take place on the 20th floor apartment 20B as per plans filed herewith. no change in use, egress, or occupancy.
M01072938-I1
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/10/2024
Permit issued — General Construction
M01072938-I1-GC
07/03/2024
Filed — Alteration
General Construction to take place on the 20th floor apartment 20B as per plans filed herewith. no change in use, egress, or occupancy.
M01072938-I1
06/26/2024
Special inspection requirement — Final
ANDREW WITLIN
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/01/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/07/2022
Cycle 9 facade report signed — SAFE
10/17/2022
Cycle 9 facade report submitted
09/27/2022
Cycle 9 facade inspection completed
08/04/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/02/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/27/2022
Cycle 9 facade report submitted
07/27/2022
Cycle 9 facade report signed — UNSAFE
07/15/2022
Cycle 9 facade inspection completed
04/27/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/18/2022
Violation issued (ECB, closed)
Construction
04/13/2022
Permit issued — Sidewalk Shed
M00446724-I1-SH
02/17/2022
Cycle 9 facade report submitted
02/17/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/17/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/15/2022
Cycle 9 facade report signed — UNSAFE
01/11/2022
Cycle 9 facade inspection completed
04/29/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/16/2021
Permit issued — Sidewalk Shed
M00446724-I1-SH
02/22/2021
Permit issued — Sidewalk Shed
M00446724-I1-SH
02/19/2021
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00446724-I1
05/20/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/20/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/12/2017
Violation issued (ECB, closed)
Local Law
11/14/2016
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2016
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2016
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/01/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/08/2015
Cycle 8 facade report submitted
06/08/2015
Cycle 8 facade report signed — SWARMP
05/29/2015
Cycle 8 facade inspection completed
01/29/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/29/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/29/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/29/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/01/2013
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/01/2013
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/10/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/10/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/10/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
Latest 60 of 95 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offLTB MECHANICAL10/23/2025
DOB NOWGeneral ConstructionSigned-offICON INTERIORS INC07/10/2024
DOB NOWSidewalk ShedPermit IssuedPOWERS BRIDGING & SCAFFOL04/13/2022
DOB NOWSidewalk ShedPermit IssuedPOWERS BRIDGING & SCAFFOL04/16/2021
DOB NOWSidewalk ShedPermit IssuedPOWERS BRIDGING & SCAFFOL02/22/2021
BISOTISSUEDSUMMIT DEVELOPMENT CORP03/30/2022
BISOTISSUEDSUMMIT DEVELOPMENT CORP04/22/2021
BISPLISSUEDAUTHENTIC PLBG CORP06/03/2016
BISSPISSUEDNONSTOP PLUMBERS CORP05/31/2016
BISMHISSUEDMINOS CONSTRUCTION CORP12/08/2015
BISOTISSUEDMINOS CONSTRUCTION CORP09/29/2015
BISSPISSUEDNONSTOP PLUMBERS CORP04/10/2015
BISPLISSUEDAUTHENTIC PLBG CORP04/10/2015
BISOTISSUEDMINOS CONSTRUCTION CORP04/09/2015
BISPLISSUEDDONATO INC11/13/2014
BISOTISSUEDRADIUS CONSTRUCTION INC10/28/2014
BISPLISSUEDGENERAL PLUMBING CORP06/13/2014
BISOTISSUEDN.Y.C ROCK INC10/05/2011
BISSDISSUEDFEDERATED CONTRACTING COR07/01/2010
BISPLISSUEDPARAMOUNT PLBG CO OF NY.I10/20/2009
BISPLISSUEDPARAMOUNT PLBG CO OF NY INC10/01/2008
BISSPISSUEDFULL CAPACITY FIRE CORP09/24/2008
BISOTISSUEDVANGUARD CONSTRUCTION AND07/15/2008
BIS—ISSUEDPLAZA CONSTRUCTION CORP.05/21/2008
BISOTISSUEDVANGUARD CONSTRUCTION AND05/01/2008
BISEQISSUEDVANGUARD CONSTRUCTION AND03/25/2008
BISPLISSUEDBOYD MECHANICAL LLC01/09/2008
BISMHISSUEDVANGUARD CONSTRUCTION AND12/18/2007
BISBLISSUEDPARAMOUNT PLUMBING CO OF NY INC08/01/2007
BISEQISSUEDPLAZA CONSTRUCTION CORP.04/30/2007
BISEQISSUEDATLANTIC HOISTING & SCAFFOLDING04/17/2007
BISEQISSUEDATLANTIC HEYDT CORP04/13/2007
BISBLISSUEDM FARBMAN & SONS INC04/03/2007
BISEQISSUEDPLAZA CONSTRUCTION CORP12/07/2006
BISEQISSUEDPLAZA CONSTRUCTION CORP.12/07/2006
BISPLISSUEDPARAMOUNT PLBG CO OF NY INC10/02/2006
BISSPISSUEDFEDERATED MECHANICAL CORO09/27/2006
BISSDISSUEDFEDERATED MECHANICAL CORO08/31/2006
BISEQISSUEDATLANTIC HEYDT CORP07/24/2006
BISOTISSUEDATLANTIC HEYDT CORP07/24/2006
+ 15 more permits on file
2 projects · most recent 10/13/2022
General Wiring
FiledStatusContractorScope
10/13/2022CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
01/12/2021CompleteOPTIMAL ELECTRIC, INC—
1 project · most recent 02/19/2021
Sidewalk Shed
FiledStatusContractorScope
02/19/2021Permit IssuedPOWERS BRIDGING & SCAFFOLSidewalk Shed
1 project · most recent 08/12/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
08/12/2026——Suspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
08/04/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/27/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
08/12/2026Alternative Materials - OTCR Buildings Bulletin NumberKarol Zdancewiczspecial
08/12/2026Post-installed AnchorsKarol Zdancewiczspecial
09/24/2025Energy Code Compliance InspectionsRICHARD LEMANSKYprogress
09/24/2025HVAC-R and service water heating equipmentRICHARD LEMANSKYenergy_progress
09/24/2025Tenant Protection Plan ComplianceVincent Gentilespecial
09/24/2025HVAC-R and service water heating system controlsRICHARD LEMANSKYenergy_progress
09/24/2025Maintenance informationRICHARD LEMANSKYenergy_progress
09/21/2025FinalRICHARD LEMANSKYprogress
09/21/2025Mechanical SystemsVincent Gentilespecial
06/26/2024FinalANDREW WITLINprogress
▾Documents — 209 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch3
08/27/2026M01072938-I1Request digital key ↗
08/21/2026M01290822-I1Request digital key ↗
08/16/2026M01443290-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/04/2026M00446724-I1Request digital key ↗
▸Applications & Permits44
▸BISPLAN / WORK APPROVAL APPLICATION23
08/22/2022123831755Open ↗
03/15/2021140999999Open ↗
03/03/2021123831755Open ↗
Showing 3 of 23 on file for this type
▸BISWORK PERMIT APPLICATION19
04/22/2021123831755Open ↗
01/06/2016122227009Open ↗
10/21/2015122227009Open ↗
Showing 3 of 19 on file for this type
▸BISSIDEWALK SHED APPLICATION & PERMIT1
04/22/2021123831755Open ↗
▸BISSCAFFOLD APPLICATION & PERMIT1
04/22/2021123831755Open ↗
▸Seals & Professional Certifications31
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION15
03/13/2020123831755Open ↗
03/23/2016122227009Open ↗
03/23/2016122227009Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/23/2026M01290822-I1Open ↗
09/23/2026M01290822-I1Open ↗
08/29/2026M01072938-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/13/2026M01290822-I1Open ↗
08/13/2026M01072938-I1Open ↗
08/13/2026M00446724-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
09/23/2026M01290822-I1Open ↗
08/28/2026M01443290-I1Open ↗
08/28/2026M01443290-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
03/15/2021140999999Open ↗
06/18/2014122035877Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
08/20/2008110315695Open ↗
03/19/2008110115214Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
08/20/2008110315695Open ↗
03/19/2008110115214Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
03/15/2021140999999Open ↗
▸Trade Schedules & Equipment29
▸BISSELF-CERT PLUMBING NOTICE10
02/27/2015122048122Open ↗
12/12/2014122048122Open ↗
12/12/2014122048122Open ↗
Showing 3 of 10 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE10
01/07/2016122227009Open ↗
12/16/2015122227009Open ↗
12/30/2014122227009Open ↗
Showing 3 of 10 on file for this type
▸BISSCHEDULE B - PLUMBING5
08/20/2008110315695Open ↗
07/31/2008110153690Open ↗
04/28/2008110153690Open ↗
Showing 3 of 5 on file for this type
▸BISSPRINKLER INSP REPORT : FP-852
11/17/2008110315695Open ↗
11/13/2008110315695Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
11/23/2010110065740Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
11/08/2008110040134Open ↗
▸Safety & Tenant Protection1
▸BISTPP1: TENANT PROTECTION PLAN1
04/22/2021123831755Open ↗
▸Environmental & Asbestos9
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER6
08/20/2008110315695Open ↗
04/28/2008110153690Open ↗
03/26/2008110122518Open ↗
Showing 3 of 6 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED3
03/15/2021140999999Open ↗
04/01/2020123831755Open ↗
07/29/2014122048122Open ↗
▸Energy Compliance13
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
03/13/2020123831755Open ↗
03/23/2016122227009Open ↗
02/24/2015122048122Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
09/28/2022123831755Open ↗
03/23/2016122227009Open ↗
03/23/2016122227009Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
09/28/2022123831755Open ↗
—123831755Open ↗
▸BISTECHNICAL REPORT: ENERGY1
09/26/2011120832233Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY5
09/28/2022123831755Open ↗
09/28/2022123831755Open ↗
03/15/2021140999999Open ↗
Showing 3 of 5 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
11/26/2021140999999Open ↗
▸Approvals, Objections & Sign-offs21
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST12
09/29/2022123831755Open ↗
08/31/2016122227009Open ↗
03/23/2016122227009Open ↗
Showing 3 of 12 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
09/26/2011120832233Open ↗
04/28/2008110153690Open ↗
03/14/2008110115214Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
04/01/2020123831755Open ↗
02/12/2016122227009Open ↗
04/21/2015122227009Open ↗
▸BISFINAL1
11/26/2021140999999Open ↗
▸Cost, Insurance & Ownership28
▸BISCOST AFFIDAVIT25
09/28/2022123831755Open ↗
08/22/2022123831755Open ↗
03/15/2021140999999Open ↗
Showing 3 of 25 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT3
04/21/2015122227009Open ↗
10/31/2014122048122Open ↗
10/31/2014122048122Open ↗
▸Filing & Intake Forms21
▸BISADDITIONAL INFORMATION12
09/13/2022123831755Open ↗
03/13/2020123831755Open ↗
03/13/2020123831755Open ↗
Showing 3 of 12 on file for this type
▸BISEFILING COVER SHEET7
03/13/2020123831755Open ↗
12/30/2014122227009Open ↗
12/30/2014122227009Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
03/15/2021140999999Open ↗
08/20/2008110315695Open ↗
▸Other Documents2
▸DOB NOWCalculations1
08/16/2026M01443290-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/16/2026M01443290-I1Open ↗