Elevator apt, miscellaneous
Yorkville Gardens
225 EAST 93 STREET · Upper East Side-Yorkville · BIN 1048917
💬 Discuss this project
1985Year Built
13Stories
D9Building Class
C4-6Zoning
109,913 sfGross Floor Area
133Units
LL97 CoveredRent Stabilized2 Open Violations ▸FISP: SWARMPFDNY Report ↗
Elevator apt, miscellaneous · 13,793 sf lot · 7.97 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction21p · 7 filings · 20 docs
Bulkhead2p · 2 filings · 6 docs
Floor 1Under Construction20p · 4 filings · 16 docs
Cellar18p · 1 filing · 20 docs
Site & exterior9p · 2 filings · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BILLY ENTERPRISES1907/08/2026
YORKVILLE GARDENS HDFC703/21/2026
N Y FOUNDATION FOR SR CITIZENS603/21/2026
NY FOUNDATION FOR SNR CIT103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LOMBARDO PROFESSIONAL ENGINEERING203/21/2026
PS ENGINEERS203/21/2026
SOMMA DESIGN CONSULTING603/21/2026
FLUID MECHANICS403/21/2026
SNR EXPEDITING DESIGN403/21/2026
AE DESIGN SOLUTION403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BILLY ENTERPRISES INCGeneral Contractor1707/08/2026
JLM AND S ENTERPRISES LLCGeneral Contractor707/08/2026
DUAL FUEL COMPANY LLCGeneral Contractor303/21/2026
SKYLINE RESTORATION INCGeneral Contractor203/21/2026
DUAL FUEL PLUBING & HTINGPlumbing207/08/2026
IDEAL FLOW MECHANICAL CO*General Contractor107/08/2026
POWERS BRIDGING & SCAFFOLDINGGeneral Contractor104/09/2026
FRANCISCO SOSA, INCGeneral Contractor107/08/2026
JOSE TEJADAElectrical103/21/2026
YEVGENY KOLTUNOVElectrical103/21/2026
DJA SAFETYGeneral Contractor107/10/2026
HENRY KHODOSHElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JD ENGINEERING PC9859105/13/2026
CROSSCHECK INSPECTION SER544103/12/2025
PROJECT TACTICAL SOLUTION5859304/18/2024
NEW AGE ENGINEERING PLLC7746504/15/2024
Building Lifecycle
All (186)Filed (24)Permit Issued (24)Signed Off (16)Facade (FISP) (19)Violation (60)Inspection (5)Objection (8)Special Inspection (30)
08/21/2026
Signed off — Alteration
Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy.
M01438316-I1
07/30/2026
Signed off — Alteration
Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy.
M01368126-I1
07/30/2026
Permit issued — Suspended Scaffold
M01438316-I1-SC
07/29/2026
Filed — Alteration
Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy.
M01438316-I1
07/29/2026
Special inspection requirement — Post-installed anchors in masonry
Michael Lombardo
07/09/2026
Permit issued — Mechanical Systems
M01380103-I1-MS
06/08/2026
Permit issued — Suspended Scaffold
M01368126-I1-SC
05/13/2026
Filed — Alteration
Installation of Kitchen Exhaust Fan, Kitchen Exhaust Hood and associated exhaust ductwork as required.
M01380103-I1
05/13/2026
Special inspection requirement — Post-installed Anchors
Zhao Deng
04/27/2026
Signed off — Alteration
application filed for roof repairs as per drawings filed herewith. no change to use, egress or occupancy.
M01191994-I1
04/10/2026
Signed off — Alteration
Installation of material hoist
M01260292-I1
04/06/2026
Signed off — Alteration
Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy.
M01358741-I1
04/04/2026
Special inspection requirement — Energy Code Compliance Inspections
Zhao Deng
03/30/2026
Special inspection requirement — Final
Zhao Deng
03/30/2026
Special inspection requirement — Tenant Protection Plan Compliance
Zhao Deng
03/30/2026
Special inspection requirement — Mechanical Systems
Zhao Deng
03/11/2026
Permit issued — Suspended Scaffold
M01368126-I1-SC
03/10/2026
Filed — Alteration
Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy.
M01368126-I1
03/05/2026
Permit issued — Suspended Scaffold
M01358741-I1-SC
03/05/2026
Special inspection requirement — Post-installed anchors in masonry
Michael Lombardo
02/25/2026
Objection raised — Scope
02/25/2026
Objection resolved — Addressed
02/13/2026
Filed — Alteration
Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy.
M01358741-I1
02/11/2026
Special inspection requirement — Post-installed anchors in masonry
Michael Lombardo
01/29/2026
Signed off — Alteration
M01302339-I1
10/17/2025
Permit issued — Sidewalk Shed
M01302339-I1-SH
10/16/2025
Filed — Alteration
M01302339-I1
10/16/2025
Permit issued — General Construction
M01191994-I1-GC
10/08/2025
Violation issued (HPD, closed)
B
10/08/2025
Violation issued (HPD, closed)
A
09/02/2025
Permit issued — Suspended Scaffold
M01260292-I1-SC
08/06/2025
Filed — Alteration
Installation of material hoist
M01260292-I1
06/26/2025
Cycle 10 facade report signed — SAFE
05/21/2025
Objection resolved — Addressed
05/21/2025
Objection resolved — Addressed
05/21/2025
Objection resolved — Addressed
03/27/2025
Objection raised — Structural
03/27/2025
Objection raised — Structural
03/27/2025
Objection raised — Structural
03/12/2025
Filed — Alteration
application filed for roof repairs as per drawings filed herewith. no change to use, egress or occupancy.
M01191994-I1
03/12/2025
Special inspection requirement — Insulation placement and R values
Michael Notaro
03/10/2025
Special inspection requirement — Tenant Protection Plan Compliance
EUGENE BIFULCO
03/07/2025
Special inspection requirement — Preliminary
Michael Notaro
03/07/2025
Special inspection requirement — Final
Michael Notaro
02/25/2025
Cycle 10 facade report submitted
02/24/2025
Cycle 10 facade inspection completed
12/02/2024
Violation issued (HPD, closed)
C
11/27/2024
Violation issued (HPD, closed)
C
10/22/2024
Signed off — Alteration
INSTALL (3) NEW GAS-FIRED BOILERS AS PER PLANS. DEMOLISH 16 GAS-FIRED BOILERS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M00924855-S2
10/17/2024
Signed off — Alteration
INSTALLATION OF NEW AIR CONDITIONING, HEATING AND VENTILATION SYSTEM TO PROVIDE AIR CONDITIONING AND VENTILATION FOR THE EXISTING MEDICAL OFFICE TENANT SPACE IN MIXED USE COMMERICAL/RESIDENTIAL BUILDING.
M00901149-I1
09/26/2024
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00269920-I1
09/26/2024
Signed off — Alteration
M01093050-I1
09/26/2024
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE.
M01087274-I1
09/10/2024
Signed off — Alteration
CD5 RENEWAL
M00979742-I1
08/22/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/16/2024
Filed — Alteration
INSTALL (3) NEW GAS-FIRED BOILERS AS PER PLANS. DEMOLISH 16 GAS-FIRED BOILERS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M00924855-P5
08/16/2024
Special inspection requirement — HVAC-R and service water heating system controls
Stephen Shishko
08/16/2024
Special inspection requirement — Maintenance information
Stephen Shishko
08/16/2024
Special inspection requirement — Energy Code Compliance Inspections
Stephen Shishko
08/16/2024
Special inspection requirement — Tenant Protection Plan Compliance
Stephen Shishko
Latest 60 of 186 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldSigned-offSKYTRAC ACCESS GROUP LLC07/30/2026
DOB NOWMechanical SystemsPermit IssuedDJA SAFETY LLC07/09/2026
DOB NOWSuspended ScaffoldSigned-offSKYTRAC ACCESS GROUP LLC06/08/2026
DOB NOWSuspended ScaffoldSigned-offSKYTRAC ACCESS GROUP LLC03/11/2026
DOB NOWSuspended ScaffoldSigned-offSKYTRAC ACCESS GROUP LLC03/05/2026
DOB NOWSidewalk ShedSigned-offPOWERS BRIDGING & SCAFFOL10/17/2025
DOB NOWGeneral ConstructionSigned-offSKYLINE RESTORATION INC10/16/2025
DOB NOWSuspended ScaffoldSigned-offSKYLINE RESTORATION INC09/02/2025
DOB NOWProtection and Mechanical MethodsSigned-offJLM AND S ENTERPRISES LLC08/08/2024
DOB NOWSidewalk ShedSigned-offJLM AND S ENTERPRISES LLC08/07/2024
DOB NOWMechanical SystemsSigned-offIDEAL FLOW MECHANICAL CO*08/07/2024
DOB NOWSidewalk ShedSigned-offJLM AND S ENTERPRISES LLC06/11/2024
DOB NOWSuspended ScaffoldSigned-offWKR CONSTRUCTION INC12/27/2023
DOB NOWGeneral ConstructionSigned-offFRANCISCO SOSA, INC10/12/2023
DOB NOWMechanical SystemsSigned-offDUAL FUEL COMPANY LLC09/29/2023
DOB NOWPlumbingSigned-offDUAL FUEL PLUBING & HTING09/29/2023
DOB NOWBoiler EquipmentSigned-offDUAL FUEL PLUBING & HTING09/29/2023
DOB NOWProtection and Mechanical MethodsSigned-offBILLY ENTERPRISES INC07/12/2023
DOB NOWSidewalk ShedSigned-offBILLY ENTERPRISES INC07/07/2023
DOB NOWSidewalk ShedSigned-offBILLY ENTERPRISES INC02/07/2023
DOB NOWProtection and Mechanical MethodsSigned-offBILLY ENTERPRISES INC12/01/2022
DOB NOWSidewalk ShedSigned-offBILLY ENTERPRISES INC01/03/2022
DOB NOWSidewalk ShedSigned-offBILLY ENTERPRISES INC01/06/2021
DOB NOWSidewalk ShedSigned-offBILLY ENTERPRISES INC12/09/2019
BISOTISSUEDWKR CONSTRUCTION, INC12/12/2023
BISOTISSUEDWKR CONSTRUCTION, INC01/09/2023
BISOTISSUEDWKR CONSTRUCTION, INC12/23/2021
BISOTISSUEDWKR CONSTRUCTION, INC01/12/2021
BISOTISSUEDWKR CONSTRUCTION, INC04/08/2020
BISOTISSUEDWKR CONSTRUCTION, INC01/06/2020
BISOTISSUEDBELLET CONSTRUCTION CO.IN07/07/2009
BISEQISSUEDROCKLEDGE SCAFFOLD CORP01/07/2009
BISOTISSUEDBELLET CONSTRUCTION CO.IN07/18/2008
BISOTISSUEDCASE CONSTRUCTION04/15/2008
BISEQISSUEDROCKLEDGE SCAFFOLD CORP01/07/2008
BISEQISSUEDROCKLEDGE SCAFFOLD CORP04/18/2007
BISBLISSUEDCALRAY SALES AND SERVICE01/10/1991
BISPLISSUEDCALRAY SALES AND SERVICE01/10/1991
1 project · most recent 05/13/2026
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/13/2026Permit IssuedDJA SAFETY LLCVentilation Systems
Ventilation
Captiveaire DU33HFA 400 CFM · Kitchen Exhaust ×1
7 projects · most recent 10/20/2025
General Wiring
FiledStatusContractorScope
10/20/2025Permit IssuedOPTIMAL ELECTRIC, INC—
07/14/2025CompleteJTE ELECTRICAL SERVICES—
09/25/2024CompleteFALCO ELEC'L SERVICES INCGeneral Wiring
09/12/2024CompleteFALCO ELEC'L SERVICES INCGeneral Wiring
11/22/2023CompleteABILENE ELECTRIC INC—
10/05/2023CompleteASSET ELECTRIC CORPGeneral Wiring
12/09/2019CompleteWCK ELECTRIC CORP.—
1 project · most recent 07/29/2026
Suspended Scaffold
FiledStatusContractorScope
07/29/2026Signed-offSKYTRAC ACCESS GROUP LLCSuspended Scaffold
2 projects · most recent 07/29/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
07/29/2026Signed-offSKYTRAC ACCESS GROUP LLCSuspended Scaffold (SC)
03/10/2026Signed-offSKYTRAC ACCESS GROUP LLCSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
08/22/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/12/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/03/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/22/2024Pass-Final Boiler Equipment InspectionPassView ↗
04/22/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 46
DateRequirementInspectorRole
07/29/2026Post-installed anchors in masonryMichael Lombardospecial
05/13/2026Post-installed AnchorsZhao Dengspecial
04/04/2026Energy Code Compliance InspectionsZhao Dengprogress
03/30/2026FinalZhao Dengprogress
03/30/2026Tenant Protection Plan ComplianceZhao Dengspecial
03/30/2026Mechanical SystemsZhao Dengspecial
03/05/2026Post-installed anchors in masonryMichael Lombardospecial
02/11/2026Post-installed anchors in masonryMichael Lombardospecial
03/12/2025Insulation placement and R valuesMichael Notaroenergy_progress
03/10/2025Tenant Protection Plan ComplianceEUGENE BIFULCOspecial
03/07/2025PreliminaryMichael Notaroprogress
03/07/2025FinalMichael Notaroprogress
08/16/2024HVAC-R and service water heating system controlsStephen Shishkoenergy_progress
08/16/2024Maintenance informationStephen Shishkoenergy_progress
08/16/2024Energy Code Compliance InspectionsStephen Shishkoprogress
08/16/2024Tenant Protection Plan ComplianceStephen Shishkospecial
08/16/2024HVAC-R and service water heating equipmentStephen Shishkoenergy_progress
08/13/2024Tenant Protection Plan Compliance—special
08/13/2024Energy Code Compliance InspectionsStephen Shishkoprogress
08/13/2024Maintenance informationStephen Shishkoenergy_progress
08/13/2024HVAC-R and service water heating system controlsStephen Shishkoenergy_progress
08/13/2024HVAC-R and service water heating equipmentStephen Shishkoenergy_progress
04/16/2024Maintenance informationStephen Shishkoenergy_progress
04/16/2024HVAC-R and service water heating system controlsStephen Shishkoenergy_progress
04/16/2024Tenant Protection Plan ComplianceStephen Shishkospecial
Latest 25 of 46.
▾Documents — 151 on file (BIS + DOB NOW)
▸Plans & Drawings20
▸DOB NOWPlans/Sketch19
09/01/2026M08047216-I1Request digital key ↗
08/28/2026M00924708-P1Request digital key ↗
08/28/2026M00924708-I1Request digital key ↗
Showing 3 of 19 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00269920-I1Request digital key ↗
▸Applications & Permits7
▸BISPLAN / WORK APPROVAL APPLICATION6
10/15/2024140867024Open ↗
09/25/2019140867024Open ↗
09/06/2019140867024Open ↗
Showing 3 of 6 on file for this type
▸BISWORK PERMIT APPLICATION1
01/06/2020140867024Open ↗
▸Seals & Professional Certifications59
▸DOB NOWProgress Inspector Seal & Signature24
09/01/2026M00924855-P2Open ↗
09/01/2026M01380103-I1Open ↗
09/01/2026M00924855-I1Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature21
09/01/2026M08047216-I1Open ↗
08/28/2026M00924708-P1Open ↗
08/28/2026M00924708-I1Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
10/02/2026M01438316-I1Open ↗
09/01/2026M00924855-P2Open ↗
09/01/2026M00924855-P2Open ↗
Showing 3 of 13 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
09/06/2019140867024Open ↗
▸Safety & Tenant Protection2
▸BISTenant Protection Plan and Notes1
09/06/2019140867024Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026M00269920-I1Open ↗
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/26/2026M00924855-P4Open ↗
08/26/2026M00924855-P3Open ↗
08/26/2026M00924855-P2Open ↗
Showing 3 of 9 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
01/06/2020140867024Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026M01191994-I1Open ↗
▸Energy Compliance7
▸DOB NOWPreliminary Commissioning Report Certification3
08/13/2026M00924855-S2Open ↗
08/13/2026M00924855-I1Open ↗
08/13/2026M00901149-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
11/01/2024140867024Open ↗
10/31/2019140867024Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
11/01/2024140867024Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
11/01/2024140867024Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY2
10/31/2019140867024Open ↗
10/31/2019140867024Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
11/05/2024140867024Open ↗
▸BISMASONRY1
11/05/2024140867024Open ↗
▸BISPOST-INSTALLED ANCHORS1
11/05/2024140867024Open ↗
▸Approvals, Objections & Sign-offs17
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter15
08/26/2026M00924855-P4Open ↗
08/26/2026M00924855-P3Open ↗
08/26/2026M00924855-P2Open ↗
Showing 3 of 15 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
11/06/2024140867024Open ↗
▸BISFINAL1
11/01/2024140867024Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT3
10/22/2024140867024Open ↗
09/06/2019140867024Open ↗
06/22/2018123576969Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
11/01/2024140867024Open ↗
▸Filing & Intake Forms4
▸BISADDITIONAL INFORMATION2
10/31/2024140867024Open ↗
10/31/2019140867024Open ↗
▸BISEFILING COVER SHEET1
06/22/2018123576969Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
09/06/2019140867024Open ↗
▸Other Documents15
▸DOB NOWManufacturer's Specifications5
08/16/2026M01438316-I1Open ↗
08/13/2026M01368126-I1Open ↗
08/13/2026M01358741-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWCalculations5
08/16/2026M01438316-I1Open ↗
08/13/2026M01368126-I1Open ↗
08/13/2026M00979742-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF Property Tax Assessment Roll3
08/13/2026M00901149-P1Open ↗
08/13/2026M00901149-I1Open ↗
08/13/2026M01260292-I1Open ↗
▸BISSupporting Document: Fee Exempt1
09/06/2019140867024Open ↗
▸BISPRELIMINARY1
11/01/2024140867024Open ↗