← Back
Church, synagogue, chapel
225 LENOX AVENUE
MANHATTAN · BIN 1057685
💬 Discuss this project
1891Year Built
3Stories
M1Building Class
R7-2Zoning
5,918 sfGross Floor Area
1Units
1 Open Violation 0 unresolved · 1 paperwork only ▸
Church, synagogue, chapel · 4,000 sf lot · 1.48 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Cellar3p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
B&C BUILDER INC103/22/2026
THE OWNER OF103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RIKE TECH ASSOCIATES LLC1011/19/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RIKE TECH ASSOCIATES LLC803/21/2026
JULIAN ALBERTO GOMEZ603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ZONE PLUMBING & HEATING CPlumbing407/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RIKE TECH ASSOCIATES LLC2965711/19/2024
Building Lifecycle
All (38)Filed (10)Permit Issued (4)Violation (2)Inspection (4)Objection (2)Special Inspection (16)
11/28/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/26/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
11/22/2024
Special inspection requirement — Post-installed Anchors
SYED RIZVI
11/22/2024
Special inspection requirement — Heating Systems
SYED RIZVI
11/19/2024
Filed — Alteration
PROPOSED TO REMOVE EXISTING OIL TANK AND OIL BOILER, TO BE REPLECE WITH NEW GAS BOILER INCLUDE GAS PIPING WORK. NO CHANGE IN USE GROUP OR OCCUPANCY UNDER THIS APPLICATION.
M00689251-P4
11/18/2024
Special inspection requirement — Heating Systems
SYED RIZVI
11/18/2024
Special inspection requirement — Post-installed Anchors
SYED RIZVI
10/31/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/24/2024
Special inspection requirement — Energy Code Compliance Inspections
SYED RIZVI
10/24/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
SYED RIZVI
10/11/2024
Objection resolved — Addressed
10/10/2024
Objection raised — Scope
09/27/2024
Filed — Alteration
REVICE APPLICATION TO REFLEC SCOPE OF WORK: CONVERTION OIL TO GAS PIPING & HOT WATER HEATER AND BOILER AT CELLAR,
M00689263-P3
09/26/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
SYED RIZVI
09/26/2024
Special inspection requirement — Energy Code Compliance Inspections
SYED RIZVI
09/25/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/23/2024
Filed — Alteration
PROPOSED TO REMOVE EXISTING OIL TANK AND OIL BOILER, TO BE REPLECE WITH NEW GAS BOILER INCLUDE GAS PIPING WORK. NO CHANGE IN USE GROUP OR OCCUPANCY UNDER THIS APPLICATION.
M00689251-P3
09/23/2024
Permit issued — Boiler Equipment
M00689251-I1-BE
09/23/2024
Special inspection requirement — Heating Systems
SYED RIZVI
09/23/2024
Special inspection requirement — Post-installed Anchors
SYED RIZVI
09/19/2024
Permit issued — Plumbing
M00689263-I1-PL
09/10/2024
Filed — Alteration
REVICE APPLICATION TO REFLEC SCOPE OF WORK: CONVERTION OIL TO GAS PIPING & HOT WATER HEATER AND BOILER AT CELLAR,
M00689263-P2
09/10/2024
Filed — Alteration
PROPOSED TO REMOVE EXISTING OIL TANK AND OIL BOILER, TO BE REPLECE WITH NEW GAS BOILER INCLUDE GAS PIPING WORK. NO CHANGE IN USE GROUP OR OCCUPANCY UNDER THIS APPLICATION.
M00689251-P2
08/29/2024
Special inspection requirement — Heating Systems
SYED RIZVI
08/29/2024
Special inspection requirement — Post-installed Anchors
SYED RIZVI
05/07/2024
Filed — Alteration
REVICE APPLICATION TO REFLEC SCOPE OF WORK: CONVERTION OIL TO GAS PIPING & HOT WATER HEATER AND BOILER AT CELLAR,
M00689263-P1
05/07/2024
Filed — Alteration
PROPOSED TO REMOVE EXISTING OIL TANK AND OIL BOILER, TO BE REPLECE WITH NEW GAS BOILER INCLUDE GAS PIPING WORK. NO CHANGE IN USE GROUP OR OCCUPANCY UNDER THIS APPLICATION.
M00689251-P1
04/19/2024
Special inspection requirement — Energy Code Compliance Inspections
04/19/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
04/19/2024
Special inspection requirement — Heating Systems
SYED RIZVI
04/19/2024
Special inspection requirement — Post-installed Anchors
SYED RIZVI
05/30/2023
Permit issued — Boiler Equipment
M00689251-I1-BE
12/30/2022
Permit issued — Boiler Equipment
M00689251-I1-BE
04/19/2022
Filed — Alteration
M00689257-I1
04/19/2022
Filed — Alteration
REVICE APPLICATION TO REFLEC SCOPE OF WORK: CONVERTION OIL TO GAS PIPING & HOT WATER HEATER AND BOILER AT CELLAR,
M00689263-I1
04/19/2022
Filed — Alteration
PROPOSED TO REMOVE EXISTING OIL TANK AND OIL BOILER, TO BE REPLECE WITH NEW GAS BOILER INCLUDE GAS PIPING WORK. NO CHANGE IN USE GROUP OR OCCUPANCY UNDER THIS APPLICATION.
M00689251-I1
08/06/2002
Violation issued (ECB, closed)
Construction
05/09/1998
Violation issued (ECB, open)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offZONE PLUMBING & HEATING C09/23/2024
DOB NOWPlumbingSigned-offZONE PLUMBING & HEATING C09/19/2024
DOB NOWBoiler EquipmentSigned-offZONE PLUMBING & HEATING C05/30/2023
DOB NOWBoiler EquipmentSigned-offZONE PLUMBING & HEATING C12/30/2022
BISEQISSUEDB AND C BUILDER INC05/10/2002
1 project · most recent 09/27/2024
Gas
FiledStatusContractorScope
09/27/2024Signed-offZONE PLUMBING & HEATING CGas
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
11/28/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/26/2024Pass-Final Boiler Equipment InspectionPassView ↗
10/31/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/25/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
11/22/2024Post-installed AnchorsSYED RIZVIspecial
11/22/2024Heating SystemsSYED RIZVIspecial
11/18/2024Heating SystemsSYED RIZVIspecial
11/18/2024Post-installed AnchorsSYED RIZVIspecial
10/24/2024Energy Code Compliance InspectionsSYED RIZVIprogress
10/24/2024Fire-Resistant Penetrations and JointsSYED RIZVIspecial
09/26/2024Fire-Resistant Penetrations and JointsSYED RIZVIspecial
09/26/2024Energy Code Compliance InspectionsSYED RIZVIprogress
09/23/2024Heating SystemsSYED RIZVIspecial
09/23/2024Post-installed AnchorsSYED RIZVIspecial
08/29/2024Heating SystemsSYED RIZVIspecial
08/29/2024Post-installed AnchorsSYED RIZVIspecial
04/19/2024Energy Code Compliance Inspections—progress
04/19/2024Fire-Resistant Penetrations and Joints—special
04/19/2024Heating SystemsSYED RIZVIspecial
04/19/2024Post-installed AnchorsSYED RIZVIspecial
▾Documents — 59 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
09/02/2026M00689251-P3Request digital key ↗
09/02/2026M00689251-P2Request digital key ↗
09/02/2026M00689251-P1Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits10
▸DOB NOWLPC Approval/Permit10
08/13/2026M00689263-I1Open ↗
08/13/2026M00689263-P2Open ↗
08/13/2026M00689251-P1Open ↗
Showing 3 of 10 on file for this type
▸Seals & Professional Certifications19
▸DOB NOWDPL-1: Design Professional Seal & Signature10
09/02/2026M00689251-P2Open ↗
09/02/2026M00689251-P1Open ↗
09/02/2026M00689251-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/19/2026M00689251-P2Open ↗
09/01/2026M00689251-I1Open ↗
09/01/2026M00689251-P4Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/31/2026M00689263-P3Open ↗
08/28/2026M00689263-I1Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
09/02/2026M00689251-P2Open ↗
09/02/2026M00689251-P1Open ↗
09/02/2026M00689251-I1Open ↗
Showing 3 of 10 on file for this type
▸Approvals, Objections & Sign-offs10
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter10
09/02/2026M00689251-P2Open ↗
09/02/2026M00689251-P1Open ↗
09/02/2026M00689251-I1Open ↗
Showing 3 of 10 on file for this type