Elevator apt, semi-fireproof without stores
225 NORTH 9 STREET
BROOKLYN · BIN 3398182
💬 Discuss this project
2011Year Built
7Stories
D1Building Class
M1-2/R6AZoning
31,500 sfGross Floor Area
34Units
LL97 CoveredRent Stabilized1 Open Violation ▸FISP: SAFEFDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: STOCKBRIDGE 60G DRIGGS 225 OWNER, LLC · 7,500 sf lot · 4.2 FAR built · Flood zone X500
Locations of Work
ArchitectureMechanical
Permit Issued — active, not yet Signed-off
RoofUnder Construction11p · 3 filings · 16 docs
Floor 8Under Construction1p · 1 filing · 8 docs
Floor 7
Floor 6Under Construction8p · 1 filing · 8 docs
Floor 5Under Construction8p · 1 filing · 8 docs
Floor 4Under Construction8p · 1 filing · 8 docs
Floor 3Under Construction8p · 1 filing · 8 docs
Floor 2Under Construction8p · 1 filing · 8 docs
Floor 1Under Construction8p · 1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
60G 542 BROADWAY OWNER508/30/2026
STOCKBRIDGE 60G DRIGGS 225 OWNER203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/22/2022$20.6M—225 N9 LLC → STOCKBRIDGE 60G DRIGGS 225 OWNER, LLC$654/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BROMLEY CALDARI ARCHITECTS108/07/2026
PCS ENGINEERING106/03/2026
NEW YORK ENGINEERS LLC107/01/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SHANNON CONTRACTING LLCGeneral Contractor108/30/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CODEGREEN510108/07/2026
PCS ENGINEERING3745106/03/2026
Building Lifecycle
All (27)Filed (3)Permit Issued (2)Facade (FISP) (3)Violation (7)Special Inspection (12)
08/27/2026
Permit issued — General Construction
B01437574-I1-GC
08/07/2026
Filed — Alteration
FILED HEREWITH TO RENOVATE EXISTING COMMON AREAS AS PER PLANS
B01437574-I1
07/30/2026
Special inspection requirement — Exterior lighting power
James Sullivan Jr
07/29/2026
Special inspection requirement — Interior lighting power
James Sullivan Jr
07/29/2026
Special inspection requirement — Lighting controls
James Sullivan Jr
07/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
James Sullivan Jr
07/28/2026
Special inspection requirement — Final
Jerry Caldari
07/28/2026
Special inspection requirement — Tenant Protection Plan Compliance
James Sullivan Jr
06/03/2026
Filed — Alteration
Facade Inspection via Industrial Rope Access
B01408688-I1
06/03/2026
Permit issued — Suspended Scaffold
B01408688-I1-SC
05/28/2026
Special inspection requirement — Post-installed Anchors
Michael Walsh
05/28/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Michael Walsh
07/01/2025
Filed — Alteration
B01210767-I1
05/15/2025
Special inspection requirement — Post-installed Anchors
05/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
04/15/2025
Special inspection requirement — Mechanical Systems
04/15/2025
Special inspection requirement — Final
04/17/2024
Violation issued (HPD, closed)
A
11/20/2023
Violation issued (HPD, closed)
I
09/19/2023
Violation issued (HPD, closed)
C
09/19/2023
Violation issued (HPD, closed)
C
09/19/2023
Violation issued (HPD, open)
B
07/14/2022
Cycle 9 facade report signed — SAFE
05/15/2022
Cycle 9 facade inspection completed
03/21/2022
Cycle 9 facade report submitted
02/22/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/20/2015
Violation issued (HPD, closed)
I
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedSHANNON CONTRACTING LLC08/27/2026
DOB NOWSuspended ScaffoldPermit IssuedM & L SIGNS, INC06/03/2026
1 project · most recent 01/13/2025
General Wiring
FiledStatusContractorScope
01/13/2025Permit IssuedTITANIUM ELECTRICAL CORPGeneral Wiring
1 project · most recent 06/03/2026
FiledStatusContractorScope
06/03/2026Permit IssuedM & L SIGNS, INC—
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
07/30/2026Exterior lighting powerJames Sullivan Jrenergy_progress
07/29/2026Interior lighting powerJames Sullivan Jrenergy_progress
07/29/2026Lighting controlsJames Sullivan Jrenergy_progress
07/29/2026Fire-Resistant Penetrations and JointsJames Sullivan Jrspecial
07/28/2026FinalJerry Caldariprogress
07/28/2026Tenant Protection Plan ComplianceJames Sullivan Jrspecial
05/28/2026Post-installed AnchorsMichael Walshspecial
05/28/2026Alternative Materials - OTCR Buildings Bulletin NumberMichael Walshspecial
05/15/2025Post-installed Anchors—special
05/15/2025Fire-Resistant Penetrations and Joints—special
04/15/2025Mechanical Systems—special
04/15/2025Final—progress
▾Documents — 16 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/21/2026B01210767-I1Request digital key ↗
08/16/2026B01408688-I1Request digital key ↗
▸Seals & Professional Certifications11
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026B01437574-I1Open ↗
09/01/2026B01437574-I1Open ↗
09/01/2026B01437574-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026B01408688-I1Open ↗
09/01/2026B01408688-I1Open ↗
09/01/2026B01437574-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/16/2026B01408688-I1Open ↗
08/16/2026B01437574-I1Open ↗
08/13/2026B01210767-I1Open ↗
▸Safety & Tenant Protection2
▸DOB NOWHPD-1: Anti-Harassment Area Checklist2
08/16/2026B01437574-I1Open ↗
08/13/2026B01210767-I1Open ↗
▸Other Documents1
▸DOB NOWIRA Certification1
08/16/2026B01408688-I1Open ↗