← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
The Beekman East Condominium
225 RECTOR PLACE · BIN 1000053
💬 Discuss this project
1985Year Built
23Stories
RMBuilding Class
BPCZoning
251,430 sfGross Floor Area
290Units
LL97 CoveredRent Stabilized6 Open Violations 5 unresolved · 1 paperwork only ▸FISP: SAFEFDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: UNAVAILABLE OWNER · 34,776 sf lot · 7.23 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalPlumbingGeneral
Roof38p · 8 filings · 20 docs
Penthouse2p · 1 filing · 5 docs
Floor 2526p · 1 filing · 12 docs
Floor 2426p · 1 filing · 12 docs
Floor 2326p · 1 filing · 12 docs
Floor 2226p · 1 filing · 12 docs
Floor 2126p · 1 filing · 12 docs
Floor 2026p · 1 filing · 12 docs
Floor 1926p · 1 filing · 12 docs
Floor 1826p · 1 filing · 12 docs
Floor 1726p · 1 filing · 12 docs
Floor 1626p · 1 filing · 12 docs
Floor 1526p · 1 filing · 12 docs
Floor 1426p · 1 filing · 12 docs
Floor 1326p · 1 filing · 12 docs
Floor 1226p · 1 filing · 12 docs
Floor 1126p · 1 filing · 12 docs
Floor 1026p · 1 filing · 12 docs
Floor 926p · 1 filing · 12 docs
Floor 826p · 1 filing · 12 docs
Floor 726p · 1 filing · 12 docs
Floor 626p · 1 filing · 12 docs
Floor 526p · 1 filing · 12 docs
Floor 426p · 1 filing · 12 docs
Floor 327p · 2 filings · 20 docs
Floor 228p · 2 filings · 20 docs
Floor 128p · 2 filings · 20 docs
Cellar3p · 1 filing · 13 docs
1 job · most recent 10/14/2020
Gas Water/Sanitary
FiledStatusContractorScope
10/14/2020Permit IssuedTESTERMAN PLBG & HTG INCGas, Water/Sanitary
10 jobs · most recent 09/04/2024
General Wiring HVAC Wiring
FiledStatusContractorScope
09/04/2024CompleteROBERT CHIMENTI—
10/31/2023CompleteHIGH QUALITY ELECTRIC OF—
10/24/2023CompleteDAVEN ELECTRIC CORPGeneral Wiring
10/11/2023CompleteJ.A. LEE ELEC SVCS LLC286 meters, 1 new_meters
09/05/2023CompleteFALCO ELEC'L SERVICES INC—
06/13/2023Permit IssuedOMD ELECTRICAL CORP1 meters, 1 new_meters
11/04/2020CompleteLENS ELECTRIC, INCGeneral Wiring
09/03/2020CompleteBALANCE ELEC CONT'G CORP.HVAC Wiring
07/08/2020CompleteA & R ELEC'L CONTR'G INC.—
01/22/2018Permit IssuedV ELECTRIC NY INCGeneral Wiring
Building Lifecycle
All (262)Filed (40)Permit Issued (39)Signed Off (25)Facade (FISP) (16)Violation (60)Inspection (16)Objection (36)Special Inspection (30)
02/10/2026
Signed off — Alteration
PROPOSED GARAGE REPAIRS AS INDICATED ON PLANS SUBMITTED HEREWITH. THERE IS NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00865659-I1
01/21/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Anthony Stasio
01/21/2026
Special inspection requirement — Concrete - Cast-In-Place
Anthony Stasio
01/21/2026
Special inspection requirement — Tenant Protection Plan Compliance
ROBERT MASONE
01/21/2026
Special inspection requirement — Final
Anthony Stasio
01/16/2026
Filed — Alteration
PROPOSED GARAGE REPAIRS AS INDICATED ON PLANS SUBMITTED HEREWITH. THERE IS NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00865659-P1
01/14/2026
Special inspection requirement — Final
Anthony Stasio
01/14/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Anthony Stasio
01/14/2026
Special inspection requirement — Concrete - Cast-In-Place
Anthony Stasio
01/14/2026
Special inspection requirement — Tenant Protection Plan Compliance
07/30/2025
Permit issued — General Construction
M00865659-I1-GC
06/05/2025
Permit issued — Structural
M00865659-I1-ST
03/26/2025
Signed off — Alteration
Interior renovation at existing apartment 5KL to install partitions for additional bedroom. No change in use, occupancy and egress.
M01183322-I1
03/26/2025
Permit issued — Suspended Scaffold
M01191940-I1-SC
03/25/2025
Violation issued (ECB, closed)
Construction
03/21/2025
Filed — Alteration
M01191940-I1
03/19/2025
Permit issued — General Construction
M01183322-I1-GC
03/03/2025
Filed — Alteration
Interior renovation at existing apartment 5KL to install partitions for additional bedroom. No change in use, occupancy and egress.
M01183322-I1
02/19/2025
Special inspection requirement — Final
DMYTRO CHORNOBRYVETS
10/08/2024
Signed off — Alteration
Converting a portion of the existing living room into a bedroom
M01100560-I1
09/30/2024
Signed off — Alteration
M00950258-I1
09/04/2024
Permit issued — General Construction
M01100560-I1-GC
08/23/2024
Filed — Alteration
Converting a portion of the existing living room into a bedroom
M01100560-I1
08/22/2024
Special inspection requirement — Tenant Protection Plan Compliance
Max Lee
08/22/2024
Special inspection requirement — Final
Matthew Cronin
08/01/2024
Permit issued — Structural
M00865659-I1-GC
06/11/2024
Permit issued — Structural
M00865659-I1-ST
05/17/2024
Filed — Alteration
Dish - Installation of new telecommunication antenna sectors, GPS antenna, and equipment cabinet on the roof. Installation of conduits and service connection room as per plans. All work is in compliance with 5/98. No change in use, egress, and occupancy.
M00905888-P1
05/17/2024
Signed off — Alteration
INSTALLATION NON BEARING PARTITIONS REPLACEMENT KITCHEN CABINETS, INTERIOR DOORS, RE-TILING BATHROOM FLOOR, WALLS,
M00952807-I1
05/15/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
05/08/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
05/01/2024
Permit issued — General Construction
M00952807-I1-GC
04/30/2024
Special inspection requirement — Energy Code Compliance Inspections
OLEG RUDITSER
04/30/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
OLEG RUDITSER
04/19/2024
Filed — Alteration
INSTALLATION NON BEARING PARTITIONS REPLACEMENT KITCHEN CABINETS, INTERIOR DOORS, RE-TILING BATHROOM FLOOR, WALLS,
M00952807-P1
11/28/2023
Objection resolved — Addressed
11/28/2023
Objection resolved — Addressed
11/21/2023
Permit issued — General Construction
M07995781-I1-GC
11/20/2023
Special inspection requirement — Post-installed Anchors
GEORGE GHEBRYAL
11/20/2023
Special inspection requirement — Tenant Protection Plan Compliance
GEORGE GHEBRYAL
11/20/2023
Special inspection requirement — Concrete - Cast-In-Place
GEORGE GHEBRYAL
11/20/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
11/20/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
David May
11/20/2023
Special inspection requirement — Insulation placement and R values
David May
11/20/2023
Special inspection requirement — Fenestration air leakage
David May
11/20/2023
Special inspection requirement — Final
David May
11/20/2023
Special inspection requirement — Masonry
GEORGE GHEBRYAL
11/17/2023
Filed — Alteration
Work includes per the filed plans replacement of roof membrane and flashing, guardrails, penthouse storefront entrance, and roof drains.
M07995781-P1
11/03/2023
Objection raised — Scope
11/03/2023
Objection raised — Scope
10/25/2023
Filed — Alteration
INSTALLATION NON BEARING PARTITIONS REPLACEMENT KITCHEN CABINETS, INTERIOR DOORS, RE-TILING BATHROOM FLOOR, WALLS,
M00952807-I1
10/24/2023
Permit issued — Sidewalk Shed
M00950258-I1-SH
10/24/2023
Permit issued — Sidewalk Shed
M00950258-I1-SF
10/21/2023
Filed — Alteration
M00950258-I1
09/28/2023
Permit issued — Antenna
M00905888-I1-AN
08/24/2023
Signed off — Alteration
MODIFICATION TO AT&T SITE. REPLACE (4) ANTENNAS,REPLACE (1)CABINET AND INSTALL (2) RRH UNITS. ALL IN CONFORMANCE WITH TPPN 5/98. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00360080-I1
08/15/2023
Objection resolved — Addressed
08/15/2023
Objection resolved — Addressed
08/15/2023
Objection resolved — Addressed
08/09/2023
Permit issued — Structural
M00865659-I1-GC
Latest 60 of 262 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
KUKREJA INVESTORS5407/08/2026
FIRSTSERVICE RESIDENTIAL1907/08/2026
ROMO CONSTRUCTION1607/08/2026
KINGS GROUP NY607/08/2026
CENTERPARK704/09/2026
TWO TWENTY FIVE RECTOR PL CONDO903/22/2026
AEROK103/22/2026
225 RECTOR PLACE703/22/2026
PARC PLACE ASSOC/RELAT103/22/2026
RECTOR SQUARE CONDOMINIUM103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ROBERT S SCHNITZER3403/21/2026
SUPERSTRUCTURES ENG + ARCH203/21/2026
SYNERGY BUILDING CONSULTANTS203/21/2026
VERTICAL RIGGING203/21/2026
EA DESIGN GROUP203/21/2026
LMS-ACE SERVICES203/21/2026
CCM CONSULTING GROUP, INC.303/21/2026
ELENPAUMERE203/21/2026
SANDEEP KAUR103/21/2026
S M EXPEDITING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AEROK INCGeneral Contractor1007/08/2026
PLUMBING & HTG DOCTOR INCPlumbing807/08/2026
JACOBS TELECOMMUN. INCGeneral Contractor807/08/2026
ROMO CONSTRUCTION CORPGeneral Contractor807/08/2026
THOMAS MAINTENANCE INCGeneral Contractor504/09/2026
KINGS GROUP NY CORPGeneral Contractor407/08/2026
BALANCE ELEC CONT'G CORP.Electrical303/22/2026
AGL DEVELOPMENT LLCGeneral Contractor303/21/2026
GROUP S LLCGeneral Contractor303/21/2026
LINK RENOVATIONGeneral Contractor303/21/2026
ALMA DESIGN INCGeneral Contractor203/21/2026
C PLUS DESIGN GROUP INCGeneral Contractor203/21/2026
D.B.J. CONTRACTING CORPGeneral Contractor203/21/2026
MAXWELL PLUMB MECH CORPGeneral Contractor107/08/2026
MP WALLS INCGeneral Contractor107/08/2026
CLARKE, DEVONElectrical103/21/2026
RONG MAINTENANCE INCGeneral Contractor107/08/2026
KENNY, JOHNElectrical103/21/2026
TRIBUTE RESTORATION INCGeneral Contractor107/08/2026
OMD ELECTRICAL CORPElectrical103/22/2026
R. MURTAGHElectrical103/21/2026
TESTERMAN PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EDG2578201/16/2026
PROJECT TACTICAL SOLUTION5859108/23/2024
GRANT ENGINEERING CONSULT3512205/17/2024
R MARSAC CONSULTING LLC329205/17/2024
ENGINEERING PROFESSIONAL6393204/19/2024
TECTONIC ENGINEERING CONS106211/17/2023
GREEN RIVER ENVIRONMENTAL7841105/02/2023
DAVI ARCHITECTURE, PC51681701/19/2023
CATALPA SPECIAL INSPECTIO2004110/14/2020
GROUP-S LLC5216206/09/2020
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offTHOMAS MAINTENANCE INC07/30/2025
DOB NOWStructuralSigned-offTHOMAS MAINTENANCE INC06/05/2025
DOB NOWSuspended ScaffoldPermit IssuedVERTICAL RIGGING INC03/26/2025
DOB NOWGeneral ConstructionSigned-offLINK RENOVATION03/19/2025
DOB NOWGeneral ConstructionSigned-offMP WALLS INC09/04/2024
DOB NOWStructuralSigned-offTHOMAS MAINTENANCE INC08/01/2024
DOB NOWStructuralSigned-offTHOMAS MAINTENANCE INC06/11/2024
DOB NOWGeneral ConstructionSigned-offALMA DESIGN05/01/2024
DOB NOWGeneral ConstructionPermit IssuedTRIBUTE RESTORATION INC11/21/2023
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP10/24/2023
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP10/24/2023
DOB NOWAntennaSigned-offAGL DEVELOPMENT LLC09/28/2023
DOB NOWStructuralSigned-offTHOMAS MAINTENANCE INC08/09/2023
DOB NOWGeneral ConstructionSigned-offRONG MAINTENANCE INC12/06/2022
DOB NOWPlumbingSigned-offMATHEW WEISS09/13/2022
DOB NOWGeneral ConstructionSigned-offAEROK INC08/30/2022
DOB NOWGeneral ConstructionSigned-offC PLUS DESIGN GROUP INC07/25/2022
DOB NOWAntennaPermit IssuedARMENTUM DIGITAL INFRASTR02/16/2022
DOB NOWPlumbingSigned-offMATHEW WEISS08/19/2021
DOB NOWGeneral ConstructionSigned-offAEROK INC08/02/2021
DOB NOWPlumbingSigned-offMATHEW WEISS06/23/2021
DOB NOWGeneral ConstructionSigned-offAEROK INC06/03/2021
DOB NOWGeneral ConstructionSigned-offDBJ CONTRACTING05/25/2021
DOB NOWGeneral ConstructionSigned-offAEROK INC05/06/2021
DOB NOWPlumbingSigned-offMATHEW WEISS05/05/2021
DOB NOWSupported ScaffoldSigned-offROMO CONSTRUCTION CORP03/25/2021
DOB NOWSupported ScaffoldSigned-offROMO CONSTRUCTION CORP01/15/2021
DOB NOWPlumbingPermit IssuedTESTERMAN PLBG & HTG INC01/14/2021
DOB NOWAntennaSigned-offARMENTUM DIGITAL INFRASTR11/06/2020
DOB NOWPlumbingSigned-offMATHEW WEISS09/16/2020
DOB NOWPlumbingSigned-offMATHEW WEISS08/19/2020
DOB NOWPlumbingSigned-offMATHEW WEISS08/05/2020
DOB NOWPlumbingSigned-offMATHEW WEISS07/27/2020
DOB NOWMechanical SystemsSigned-offMAXWELL PLUMB MECH CORP06/30/2020
DOB NOWAntennaPermit IssuedARMENTUM DIGITAL INFRASTR04/15/2020
DOB NOWMechanical SystemsSigned-offGROUP S LLC03/09/2020
DOB NOWSupported ScaffoldSigned-offROMO CONSTRUCTION CORP04/12/2019
DOB NOWSupported ScaffoldSigned-offROMO CONSTRUCTION CORP11/16/2018
DOB NOWAntennaSigned-offARMENTUM DIGITAL INFRASTR07/26/2018
BISPLISSUEDPUMPING SOL PLBG & MECH I03/20/2025
+ 49 more permits on file
▾Field Inspections (DOB CAP) — 16
DateTypeResultReport
05/15/2024Pass-Final General Construction Non-Directive 14PassView ↗
05/08/2024Fail-Final General Construction Non-Directive 14FailView ↗
01/06/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/15/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/23/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/29/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/19/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/18/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/21/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/01/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/31/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/30/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/30/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/20/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/14/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/09/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 70
DateRequirementInspectorRole
01/21/2026Tenant Protection Plan ComplianceROBERT MASONEspecial
01/21/2026FinalAnthony Stasioprogress
01/21/2026Structural Stability – Alterations of existing buildingsAnthony Stasiospecial
01/21/2026Concrete - Cast-In-PlaceAnthony Stasiospecial
01/14/2026Concrete - Cast-In-PlaceAnthony Stasiospecial
01/14/2026Structural Stability – Alterations of existing buildingsAnthony Stasiospecial
01/14/2026Tenant Protection Plan Compliance—special
01/14/2026FinalAnthony Stasioprogress
02/19/2025FinalDMYTRO CHORNOBRYVETSprogress
08/22/2024FinalMatthew Croninprogress
08/22/2024Tenant Protection Plan ComplianceMax Leespecial
04/30/2024Energy Code Compliance InspectionsOLEG RUDITSERprogress
04/30/2024Fire-Resistant Penetrations and JointsOLEG RUDITSERspecial
11/20/2023Fenestration air leakageDavid Mayenergy_progress
11/20/2023Concrete - Cast-In-PlaceGEORGE GHEBRYALspecial
11/20/2023Tenant Protection Plan ComplianceGEORGE GHEBRYALspecial
11/20/2023Post-installed AnchorsGEORGE GHEBRYALspecial
11/20/2023MasonryGEORGE GHEBRYALspecial
11/20/2023Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
11/20/2023FinalDavid Mayprogress
11/20/2023Insulation placement and R valuesDavid Mayenergy_progress
11/20/2023Fenestration and door U-factor and product ratingsDavid Mayenergy_progress
05/01/2023Concrete - Cast-In-PlaceGEORGE GHEBRYALspecial
05/01/2023Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
05/01/2023MasonryGEORGE GHEBRYALspecial
Latest 25 of 70.
▾Documents — 746 on file (BIS + DOB NOW)
▸Plans & Drawings41
▸DOB NOWPlans/Sketch28
09/06/2026M00002578-I1Request digital key ↗
09/06/2026M00089217-I1Request digital key ↗
09/03/2026M00491818-I1Request digital key ↗
Showing 3 of 28 on file for this type
▸DOB NOWPlans/Sketch - Plumbing7
09/05/2026M00299946-I1Request digital key ↗
09/04/2026M00373414-I1Request digital key ↗
09/04/2026M00369855-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold3
09/06/2026M00089217-I1Request digital key ↗
09/04/2026M00454124-I1Request digital key ↗
08/15/2026M00089217-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/05/2026M00314841-I1Request digital key ↗
09/04/2026M00344104-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Antenna1
08/15/2026M00360080-I1Request digital key ↗
▸Applications & Permits113
▸BISPLAN / WORK APPROVAL APPLICATION64
02/26/2026102240424Open ↗
12/02/2025104648115Open ↗
05/13/2025110110022Open ↗
Showing 3 of 64 on file for this type
▸BISWORK PERMIT APPLICATION48
03/21/2025104648115Open ↗
10/05/2021140753619Open ↗
12/01/2020140955161Open ↗
Showing 3 of 48 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records3
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWFlood Zone Compliance1
08/13/2026M00002578-I1Open ↗
▸DOB NOWFlood Zone Design Certification1
08/13/2026M00002578-I1Open ↗
▸Seals & Professional Certifications164
▸DOB NOWDPL-1: Design Professional Seal & Signature39
09/06/2026M00089217-I1Open ↗
09/06/2026M00089217-P1Open ↗
09/04/2026M00344104-I1Open ↗
Showing 3 of 39 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION37
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 37 on file for this type
▸DOB NOWProgress Inspector Seal & Signature29
09/23/2026M01100560-I1Open ↗
09/18/2026M00865659-I1Open ↗
09/01/2026M07995781-I1Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature25
09/23/2026M01100560-I1Open ↗
09/18/2026M00865659-I1Open ↗
09/18/2026M00865659-I1Open ↗
Showing 3 of 25 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISAPPLICANT OWNER SIGNATURE5
09/24/2020140955161Open ↗
08/12/2020140934345Open ↗
07/21/2020140924757Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
08/12/2020140934345Open ↗
07/21/2020140924757Open ↗
Showing 2 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment17
▸BISSELF-CERT PLUMBING NOTICE8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISSCHEDULE B - PLUMBING6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA2
08/07/2023104702449Open ↗
Showing 1 of 2 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection25
▸BISTenant Protection Plan and Notes14
10/30/2020140955161Open ↗
08/12/2020140934345Open ↗
07/21/2020140924757Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWTenant Protection Plan10
09/04/2026M00344104-I1Open ↗
08/15/2026M00360080-I1Open ↗
08/13/2026M00369855-P1Open ↗
Showing 3 of 10 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos60
▸DOB NOWDEP ACP-5: Asbestos Assessment Report32
09/04/2026M00344104-I1Open ↗
09/04/2026M00369855-P1Open ↗
09/04/2026M00369855-I1Open ↗
Showing 3 of 32 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)20
09/24/2020140955161Open ↗
08/12/2020140934345Open ↗
07/21/2020140924757Open ↗
Showing 3 of 20 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026M07995781-I1Open ↗
▸Energy Compliance81
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS24
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 24 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY20
09/10/2024122798124Open ↗
09/10/2024122798124Open ↗
05/26/2022121750783Open ↗
Showing 3 of 20 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS14
09/10/2024122798124Open ↗
05/26/2022121750783Open ↗
01/05/2022140753619Open ↗
Showing 3 of 14 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)5
08/01/2024121750783Open ↗
02/24/2022140955161Open ↗
03/29/2021140884103Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS5
08/12/2020140934345Open ↗
07/21/2020140924757Open ↗
Showing 2 of 5 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.4
08/13/2026M00518090-I1Open ↗
08/13/2026M00552451-I1Open ↗
08/13/2026M00491813-I1Open ↗
Showing 3 of 4 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS3
08/01/2024121750783Open ↗
03/29/2021140924757Open ↗
07/09/2020140884103Open ↗
▸BISNYCECC ANALYSIS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISLIGHTING IN DWELLING UNITS2
07/30/2020140924757Open ↗
07/09/2020140884103Open ↗
▸DOB NOWPreliminary Commissioning Report Certification2
09/04/2026M00344104-I1Open ↗
08/13/2026M00314841-I1Open ↗
▸Inspections & Test Reports48
▸BISTECHNICAL REPORT: RESPONSIBILITY36
09/10/2024122798124Open ↗
09/10/2024122798124Open ↗
07/05/2024104562812Open ↗
Showing 3 of 36 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)3
08/01/2024121750783Open ↗
03/29/2021140924757Open ↗
07/09/2020140884103Open ↗
▸BIS* FINAL INSPECTION DIRECTIVE 14 OF 19752
11/19/2025104691905Open ↗
07/05/2024104562812Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION2
03/29/2021140924757Open ↗
07/09/2020140884103Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)2
06/17/2024101896628Open ↗
07/09/2020140884103Open ↗
▸BIS* STRUCTURAL STABILITY 1 RCNY:16-011
11/19/2025104691905Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
09/18/2024121750783Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
09/18/2024121750783Open ↗
▸Approvals, Objections & Sign-offs70
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST37
10/11/2024121750783Open ↗
09/11/2024122798124Open ↗
07/08/2024101896628Open ↗
Showing 3 of 37 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION8
07/17/2020140753619Open ↗
Showing 1 of 8 on file for this type
▸BISADMINISTRATIVE OBJECTIONS8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE5
07/16/2025110110022Open ↗
05/13/2025110110022Open ↗
Showing 2 of 5 on file for this type
▸BISFINAL4
08/01/2024121750783Open ↗
02/25/2022122972499Open ↗
03/29/2021140924757Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter3
08/13/2026M00905888-I1Open ↗
08/13/2026M00905888-P1Open ↗
08/13/2026M00454124-I1Open ↗
▸BISSUPERSEDING LETTER1
03/21/2025104648115Open ↗
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSHED LETTER1
11/13/2020122972499Open ↗
▸DOB NOWNYS DEC Tidal Wetlands Approval1
08/13/2026M00002578-I1Open ↗
▸DOB NOWDEP Variance (V5) letter1
08/13/2026M07995781-I1Open ↗
▸Cost, Insurance & Ownership54
▸BISCOST AFFIDAVIT46
09/10/2024122798124Open ↗
07/05/2024101896628Open ↗
07/05/2024104562812Open ↗
Showing 3 of 46 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW36
08/01/2024121750783Open ↗
07/05/2024104562812Open ↗
02/24/2022140955161Open ↗
Showing 3 of 6 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT2
11/27/2020140955161Open ↗
Showing 1 of 2 on file for this type
▸Filing & Intake Forms60
▸BISADDITIONAL INFORMATION30
07/16/2025110110022Open ↗
08/06/2024104702449Open ↗
11/17/2021140753619Open ↗
Showing 3 of 30 on file for this type
▸BISEFILING COVER SHEET14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET8
09/24/2020140955161Open ↗
08/12/2020140934345Open ↗
07/21/2020140924757Open ↗
Showing 3 of 8 on file for this type
▸BISBOROUGH INTAKE FORM8
03/21/2025104648115Open ↗
11/13/2020122972499Open ↗
07/17/2020140753619Open ↗
Showing 3 of 8 on file for this type
▸Other Documents9
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BIS* VENT. SYS.-ENGINEER/INSTALLER 27-136,7791
07/05/2024101896628Open ↗
▸DOB NOWIRA Certification1
08/13/2026M01191940-I1Open ↗
▸DOB NOWFEMA Elevation Certificate (086-0-33)/Flood Proofing Certificate (086-0-34)1
08/13/2026M00002578-I1Open ↗
▸DOB NOWNYS DEC Tidal Wetlands Map1
08/13/2026M00002578-I1Open ↗
▸DOB NOWFlood Hazard Area Substantial Improvement Calculation1
08/13/2026M00002578-I1Open ↗