← Back
BuildNYC
Elevator apt, semi-fireproof without stores
Saint Nicholas (NYCHA)
225 WEST 129TH STREET · BIN 1081511
💬 Discuss this project
1951Year Built
14Stories
D1Building Class
R7-2Zoning
569,515 sfGross Floor Area
650Units
LL97 Covered16 Active Violations 8 unresolved · 8 paperwork only ▸FISP: No Report FiledFDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: NYC Housing Authority · 290,420 sf lot · 1.96 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalEquipmentGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsNYC Housing Authority4 filings
RoofNYC Housing Authority9p · 3 filings
BulkheadNYC Housing Authority4p · 2 filings · 20 docs
Floor 14NYC Housing Authority2p · 1 filing
Floor 13
Floor 12
Floor 11
Floor 101p · 1 filing
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1Unit 1D3p · 2 filings
Cellar2p · 1 filing
Site & exteriorFrederick Douglas Saint Nicholas HousesUnder Construction5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
New York City Housing Authority5308/28/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM Zoning1603/21/2026
Patuxent Engineering603/21/2026
Rand Engineering & Arch603/21/2026
Joel Phagoo P.E403/21/2026
Joel Phagoo P E403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Metropolitan ConstructionScaffold1107/08/2026
Advanced Scaffold ServicesScaffold807/08/2026
J.E. Levine BuildersGeneral Contractor506/28/2026
Talico ContractingScaffold303/21/2026
The Maintenance CoElectrical103/21/2026
S. J. ElectricElectrical103/21/2026
WDFGeneral Contractor107/08/2026
N.Y.C. Housing AuthorityElectrical103/21/2026
Polaris Electrical ConstructionElectrical103/21/2026
Fresh Meadow Electrical ContractingElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Socotec Engineering4983403/05/2026
Rand Engineering & Architects266307/03/2024
20/20 Inspections1471110/07/2021
Building Lifecycle
All (116)Filed (20)Permit Issued (15)Signed Off (6)Facade (FISP) (11)Violation (23)Objection (11)Special Inspection (30)
06/23/2026
Permit issued — General Construction
M01130209-I1-GC
05/06/2026
Objection resolved — Resolved
04/13/2026
Objection raised — Other
04/02/2026
Filed — Alteration
INTERIOR AND EXTERIOR RENOVATION OF EXISTING MULTIFAMILY BUILDING TO CREATE A VESTIBULE IN THE EXISTING LOBBY INCLUDING MINOR HORIZONTAL ENLARGEMENT ON THE FIRST FLOOR AT GRADE. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01303081-S4
03/30/2026
Special inspection requirement — Mechanical Systems
03/30/2026
Special inspection requirement — Energy Code Compliance Inspections
03/30/2026
Special inspection requirement — Final
03/30/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/30/2026
Special inspection requirement — HVAC-R and service water heating equipment
03/30/2026
Special inspection requirement — Maintenance information
03/30/2026
Special inspection requirement — HVAC-R and service water heating system controls
03/30/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
03/30/2026
Special inspection requirement — Tenant Protection Plan Compliance
03/27/2026
Filed — Alteration
INTERIOR AND EXTERIOR RENOVATION OF EXISTING MULTIFAMILY BUILDING TO CREATE A VESTIBULE IN THE EXISTING LOBBY INCLUDING MINOR HORIZONTAL ENLARGEMENT ON THE FIRST FLOOR AT GRADE. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01303081-S3
03/27/2026
Special inspection requirement — Maintenance information
03/23/2026
Objection resolved — Addressed
03/18/2026
Objection raised — Other
03/05/2026
Filed — Alteration
EXTERIOR UPGRADES TO EXISTING MULTIFAMILY BUILDING. EXTERIOR UPGRADES INCLUDE APPLICATION OVERCLADDING WITH EXTERIOR INSULATION FINISH SYSTEM (EIFS) ON FLOORS 2-13. NO CHANGE TO EGRESS, USE OR OCCUPANCY.
M01131695-S2
03/05/2026
Filed — Alteration
EXTERIOR UPGRADES TO EXISTING MULTIFAMILY BUILDING. EXTERIOR UPGRADES INCLUDE APPLICATION OVERCLADDING WITH EXTERIOR INSULATION FINISH SYSTEM (EIFS) ON FLOORS 2-13. NO CHANGE TO EGRESS, USE OR OCCUPANCY.
M01131695-I1
02/27/2026
Special inspection requirement — HVAC-R and service water heating system controls
02/27/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
02/27/2026
Special inspection requirement — HVAC-R and service water heating equipment
02/27/2026
Special inspection requirement — Tenant Protection Plan Compliance
02/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
02/27/2026
Special inspection requirement — Energy Code Compliance Inspections
11/12/2025
Permit issued — General Construction
M01130209-I1-GC
11/04/2025
Objection resolved — Addressed
11/04/2025
Objection resolved — Addressed
10/31/2025
Objection raised — Scope
10/31/2025
Objection raised — Structural
10/31/2025
Objection raised — Zoning
10/22/2025
Filed — Alteration
INTERIOR AND EXTERIOR RENOVATION OF EXISTING MULTIFAMILY BUILDING TO CREATE A VESTIBULE IN THE EXISTING LOBBY INCLUDING MINOR HORIZONTAL ENLARGEMENT ON THE FIRST FLOOR AT GRADE. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01303081-S1
10/21/2025
Filed — Alteration
INTERIOR AND EXTERIOR RENOVATION OF EXISTING MULTIFAMILY BUILDING TO CREATE A VESTIBULE IN THE EXISTING LOBBY INCLUDING MINOR HORIZONTAL ENLARGEMENT ON THE FIRST FLOOR AT GRADE. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01303081-I1
10/15/2025
Special inspection requirement — Tenant Protection Plan Compliance
Alexis Schlessingerman
10/15/2025
Special inspection requirement — Fire-Resistance Rated Construction
Alexis Schlessingerman
10/15/2025
Special inspection requirement — Vestibules
Alexis Schlessingerman
10/15/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
10/15/2025
Special inspection requirement — Insulation placement and R values
Alexis Schlessingerman
10/15/2025
Special inspection requirement — Energy Code Compliance Inspections
Alexis Schlessingerman
10/15/2025
Special inspection requirement — Exterior lighting power
10/15/2025
Special inspection requirement — Lighting controls
10/15/2025
Special inspection requirement — Lighting in dwelling units
10/15/2025
Special inspection requirement — Interior lighting power
10/15/2025
Special inspection requirement — Insulation placement and R values
10/15/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Alexis Schlessingerman
10/15/2025
Special inspection requirement — Fire-Resistance Rated Construction
10/15/2025
Special inspection requirement — Energy Code Compliance Inspections
06/04/2025
Objection resolved — Addressed
05/30/2025
Objection raised — Zoning
05/19/2025
Filed — Alteration
LOCALIZED THROUGH-WALL PENETRATIONS (FOR MECHANICAL SLEEVES), MECHANICAL SCOPE IS FILED UNDER A SEPARATE APPLICATION. NO CHANGE TO USE, EGRESS OR OCCUPANCY
M01127151-S3
05/13/2025
Violation issued (FDNY_NOV, closed)
04/08/2025
Violation issued (ECB, open)
Local Law
03/12/2025
Signed off — Alteration
LOCALIZED THROUGH-WALL PENETRATIONS (FOR MECHANICAL SLEEVES), MECHANICAL SCOPE IS FILED UNDER A SEPARATE APPLICATION. NO CHANGE TO USE, EGRESS OR OCCUPANCY
M01127151-I1
01/29/2025
Permit issued — General Construction
M01127151-I1-GC
01/27/2025
Filed — Alteration
LOCALIZED THROUGH-WALL PENETRATIONS (FOR MECHANICAL SLEEVES), MECHANICAL SCOPE IS FILED UNDER A SEPARATE APPLICATION. NO CHANGE TO USE, EGRESS OR OCCUPANCY
M01127151-P1
12/16/2024
Permit issued — General Construction
M01130209-I1-GC
11/13/2024
Filed — Alteration
M01130209-I1
10/30/2024
Signed off — Alteration
Limited repair along the main roof water tank bulkhead and 14th floor hallway. No change to use, egress or occupancy.
M00604376-I1
10/23/2024
Filed — Alteration
LOCALIZED THROUGH-WALL PENETRATIONS (FOR MECHANICAL SLEEVES), MECHANICAL SCOPE IS FILED UNDER A SEPARATE APPLICATION. NO CHANGE TO USE, EGRESS OR OCCUPANCY
M01127151-I1
07/03/2024
Filed — Alteration
Limited repair along the main roof water tank bulkhead and 14th floor hallway. No change to use, egress or occupancy.
M00604376-P2
Latest 60 of 116 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedJ.E. Levine Builders06/23/2026
DOB NOWGeneral ConstructionPermit IssuedJ.E. Levine Builder11/12/2025
DOB NOWGeneral ConstructionSigned-offJ.E. Levine Builder01/29/2025
DOB NOWGeneral ConstructionPermit IssuedJ.E. Levine Builder12/16/2024
DOB NOWSidewalk ShedPermit IssuedAdvanced Scaffold Services05/09/2023
DOB NOWSupported ScaffoldPermit IssuedAdvanced Scaffold Services01/10/2023
DOB NOWSupported ScaffoldPermit IssuedAdvanced Scaffold Services01/09/2023
DOB NOWSidewalk ShedPermit IssuedAdvanced Scaffold Services01/06/2023
DOB NOWGeneral ConstructionSigned-offWDF10/21/2022
DOB NOWConstruction FenceSigned-offMetropolitan Construction09/06/2018
DOB NOWSupported ScaffoldSigned-offMetropolitan Construction06/13/2018
DOB NOWSidewalk ShedSigned-offMetropolitan Construction06/04/2018
DOB NOWSidewalk ShedSigned-offMetropolitan Construction05/10/2018
DOB NOWSidewalk ShedSigned-offTalico Contracting03/28/2018
DOB NOWConstruction FenceSigned-offMetropolitan Construction03/27/2018
BISOTISSUEDMetropolitan Construction07/03/2020
BISOTISSUEDMetropolitan Construction05/11/2019
BISOTISSUEDMetropolitan Construction07/05/2018
BISEQISSUEDAkro General Contracting12/09/2014
BISOTISSUEDZoria Housing11/03/2014
BISOTISSUEDZoria Housing08/21/2014
BISEQISSUEDAkro General Contracting03/12/2014
BISEQISSUEDMetro. Bridge & Scaf09/24/2013
BISEQISSUEDMetropolitan Enterprises05/06/2013
BISEQRE-ISSUEDMetropolitan Enterprises10/12/2012
BISEQISSUEDMetro. Bridge & Scaf09/21/2012
BISPLISSUEDPhase 1 Group04/25/2012
BISOTISSUEDTishman Construction04/13/2012
BIS—ISSUEDNYCHA11/22/2011
BISEQISSUEDMetro. Bridge & Scaf09/15/2011
BISEQISSUEDMetro. Bridge & Scaf10/05/2010
BISEQISSUEDMetro. Bridge & Scaf07/21/2010
BISPLISSUEDDual Fuel Plumbing & Heating04/24/2007
BISEQISSUEDPhoenix Construction01/27/2000
BISPLISSUEDOlympia Mechanical10/26/1999
1 project · most recent 04/02/2026
Heating and Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
04/02/2026——Heating and Air Conditioning Systems, Heating Systems, Ventilation Systems
Heat / Cool
Ephoca AWP10N3H2 10,860 BTU · Heat Pump Outdoor ×548
AWP10R3H2 8,400 BTU · Heat Pump Outdoor ×5
Heating
Lg ARU456BTE5 484,000 BTU · Vrf Outdoor ×2
Ventilation
Greenheck ERV-20-15L 840 CFM · Erv ×1
1 project · most recent 04/02/2026
FiledStatusContractorScope
04/02/2026——7 heads
1 project · most recent 04/02/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
04/02/2026——Gas, Storm, Water/Sanitary
14 projects · most recent 04/28/2026
General Wiring
FiledStatusContractorScope
04/28/2026CompleteCaputek Electrical Services—
01/28/2026Permit IssuedGilston Electrical ContngGeneral Wiring
01/27/2026Permit IssuedPolaris Electrical ConstructionGeneral Wiring
09/12/2025Permit IssuedS. J. ElectricGeneral Wiring
02/19/2025Permit IssuedGilston Electrical Contng—
11/14/2024CancelledCapone Electrical ContractorsGeneral Wiring
10/17/2024Permit IssuedCapone Electrical Contractors—
06/15/2023CompleteTri-State Electrical & Mechanical IGeneral Wiring
07/29/2020Permit IssuedN.Y.C. Housing AuthorityGeneral Wiring
08/21/2019Permit IssuedEia ElectricGeneral Wiring
05/14/2018CompleteLintech Electric—
05/08/2018CompleteLintech Electric—
04/13/2018CompleteMac Fhionnghaile & SonsGeneral Wiring
03/21/2018CancelledQ.Y. Electric—
1 project · most recent 03/05/2026
Masonry
FiledStatusContractorScope
03/05/2026——Masonry
1 project · most recent 01/09/2023
Scaffold
FiledStatusContractorScope
01/09/2023Permit IssuedAdvanced Scaffold ServicesScaffold
▾Special Inspection Requirements (DOB NOW) — 71
DateRequirementInspectorRole
03/30/2026Final—progress
03/30/2026HVAC-R and service water heating system controls—energy_progress
03/30/2026Maintenance information—energy_progress
03/30/2026HVAC-R and service water piping design and insulation—energy_progress
03/30/2026Energy Code Compliance Inspections—progress
03/30/2026Mechanical Systems—special
03/30/2026Fire-Resistant Penetrations and Joints—special
03/30/2026Tenant Protection Plan Compliance—special
03/30/2026HVAC-R and service water heating equipment—energy_progress
03/27/2026Maintenance information—energy_progress
02/27/2026HVAC-R and service water piping design and insulation—energy_progress
02/27/2026HVAC-R and service water heating equipment—energy_progress
02/27/2026Fire-Resistant Penetrations and Joints—special
02/27/2026Tenant Protection Plan Compliance—special
02/27/2026HVAC-R and service water heating system controls—energy_progress
02/27/2026Energy Code Compliance Inspections—progress
10/15/2025Insulation placement and R values—energy_progress
10/15/2025Exterior lighting power—energy_progress
10/15/2025Fenestration and door U-factor and product ratings—energy_progress
10/15/2025Lighting controls—energy_progress
10/15/2025Lighting in dwelling units—energy_progress
10/15/2025Interior lighting power—energy_progress
10/15/2025Tenant Protection Plan Compliance—special
10/15/2025Tenant Protection Plan ComplianceAlexis Schlessingermanspecial
10/15/2025Fire-Resistant Penetrations and JointsAlexis Schlessingermanspecial
Latest 25 of 71.
▾Documents — 237 on file (BIS + DOB NOW)
▸Plans & Drawings21
▸DOB NOWPlans/Sketch21
09/06/2026M00030037-I1Request digital key ↗
09/06/2026M00030035-I1Request digital key ↗
09/06/2026M00042687-I1Request digital key ↗
Showing 3 of 21 on file for this type
▸Applications & Permits36
▸BISPLAN / WORK APPROVAL APPLICATION19
04/11/2023120902023Open ↗
03/17/2023102873375Open ↗
12/06/2022104241045Open ↗
Showing 3 of 19 on file for this type
▸BISWORK PERMIT APPLICATION13
07/05/2018140557582Open ↗
12/15/2014121946029Open ↗
08/21/2014140236616Open ↗
Showing 3 of 13 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications3
12/12/2016121946029Open ↗
06/21/2014120416567Open ↗
04/14/2014120793043Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
01/23/2012120902023Open ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026M01303081-S1Open ↗
08/13/2026M01127151-S3Open ↗
▸Seals & Professional Certifications60
▸DOB NOWDPL-1: Design Professional Seal & Signature21
09/06/2026M00042687-I1Open ↗
09/03/2026M00604376-I1Open ↗
09/01/2026M00808667-I1Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
10/03/2026M00604376-P2Open ↗
10/03/2026M00604376-P2Open ↗
09/02/2026M00030035-I1Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION10
07/01/2019123823880Open ↗
03/31/2016140236616Open ↗
02/22/2013120793043Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
10/03/2026M00604376-P2Open ↗
09/01/2026M01130209-I1Open ↗
08/26/2026M00604376-P1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
08/06/2014140236616Open ↗
03/19/2014121946029Open ↗
10/12/2012140032907Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
03/19/2014121946029Open ↗
07/22/2010120416567Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
08/06/2014140236616Open ↗
10/12/2012140032907Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
08/06/2014140236616Open ↗
10/12/2012140032907Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
10/04/2016140557582Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
07/22/2010120416567Open ↗
▸Trade Schedules & Equipment4
▸BISSELF-CERT PLUMBING NOTICE2
11/28/2012120793043Open ↗
06/25/2012120793043Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
07/01/2019123823880Open ↗
▸BISSCHEDULE B - PLUMBING1
01/12/2012120793043Open ↗
▸Safety & Tenant Protection2
▸BISTenant Protection Plan and Notes2
07/01/2019123823880Open ↗
10/03/2017140557582Open ↗
▸Environmental & Asbestos14
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
09/03/2026M00604376-P1Open ↗
09/03/2026M00604376-I1Open ↗
08/25/2026M01127151-I1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
03/19/2014121946029Open ↗
07/22/2010120416567Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)2
03/31/2016140236616Open ↗
08/06/2014140236616Open ↗
▸BISDEP ASBESTOS PROJECT CONDITIONAL COMPLETION FORM1
06/25/2018140557582Open ↗
▸BISAPPLICANT SHALL PROVIDE 1 ACP-21 FORMPRIOR TO SIGN OFF: TRU6216MN181
08/05/2020140557582Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
01/12/2012120793043Open ↗
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
10/07/2013120793043Open ↗
▸Energy Compliance10
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY6
08/05/2020140557582Open ↗
04/23/2020140557582Open ↗
09/06/2018140557582Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
08/06/2014140236616Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
08/05/2020140557582Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
08/02/2019123823880Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00604376-I1Open ↗
▸Inspections & Test Reports11
▸BISTECHNICAL REPORT: RESPONSIBILITY6
08/05/2020140557582Open ↗
04/19/2018140557582Open ↗
03/19/2018140557582Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
02/26/2014120793043Open ↗
04/18/2012120793043Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
02/26/2014120793043Open ↗
04/09/2012120793043Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026M01131695-I1Open ↗
▸Approvals, Objections & Sign-offs40
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter21
09/06/2026M00042687-I1Open ↗
09/03/2026M00604376-I1Open ↗
09/01/2026M00808724-I1Open ↗
Showing 3 of 21 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST7
05/15/2023102873375Open ↗
08/05/2020140557582Open ↗
12/12/2016121946029Open ↗
Showing 3 of 7 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
08/21/2014140236616Open ↗
03/17/2014121946029Open ↗
10/08/2013120416567Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
11/30/2011120902023Open ↗
07/22/2010120416567Open ↗
▸BISSHED LETTER2
12/15/2014121946029Open ↗
10/08/2013120416567Open ↗
▸BISSUPERSEDING LETTER1
12/15/2014121946029Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
11/25/2011120902023Open ↗
▸Cost, Insurance & Ownership8
▸BISCOST AFFIDAVIT7
08/05/2020140557582Open ↗
07/01/2019123823880Open ↗
10/04/2016140557582Open ↗
Showing 3 of 7 on file for this type
▸BISDEPT OF FINANCE VERIFICATION1
03/17/2023102873375Open ↗
▸Filing & Intake Forms17
▸BISEFILING COVER SHEET8
07/02/2019123776761Open ↗
07/02/2019123776761Open ↗
07/02/2019123776761Open ↗
Showing 3 of 8 on file for this type
▸BISADDITIONAL INFORMATION6
06/25/2018140557582Open ↗
06/25/2018140557582Open ↗
04/19/2018140557582Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
10/04/2016140557582Open ↗
08/06/2014140236616Open ↗
10/12/2012140032907Open ↗
▸Other Documents12
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
07/01/2019123823880Open ↗
10/12/2012140032907Open ↗
04/09/2012120793043Open ↗
Showing 3 of 4 on file for this type
▸BISPLOT DIAGRAM2
12/10/2015120902023Open ↗
11/25/2011120902023Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026M01303081-S1Open ↗
08/13/2026M01127151-S3Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026M01303081-S1Open ↗
08/13/2026M01127151-S3Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
08/05/2020140557582Open ↗
▸DOB NOWPlot Diagram1
08/13/2026M01127151-S3Open ↗