Condo, residential tower (mixed-use, multi-family elevator) [derived]
225 WEST 60 STREET
MANHATTAN · Upper West Side-Lincoln Square · BIN 1087266
💬 Discuss this project
2004Year Built
19Stories
RMBuilding Class
R8Zoning
133,892 sfGross Floor Area
80Units
LL97 CoveredRent Stabilized5 Open Violations ▸FISP: SAFEFDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · 12,553 sf lot · 10.67 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectrical
Roof15p · 2 filings · 20 docs
Bulkhead2p · 2 filings · 5 docs
Penthouse11p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ORSID NEW YORK307/08/2026
ORSID REALTY607/08/2026
TOWER BLDG SERVICES303/22/2026
WEST 60TH ST. REALTY103/22/2026
PLAZA CONSTRUCTION1203/22/2026
HGC/DBA BRIDGE CONTRACTIN303/22/2026
HGL DBA PORIDGE CONTRACTI103/22/2026
BRIDGE CONTRACTING203/21/2026
MAXWELL KATES403/21/2026
WEST 60TH ST REALTY PARTNERS2203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
STUDIO VURAL405/01/2025
P GEORGOPOULOS ARCHITECT PC108/01/2023
AZ PROFESSIONAL ENGINEERING PC102/28/2022
PRAINITO ARCHITECT P.C.110/08/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
92 DESIGN203/21/2026
BMB BUILDING CONSULTING803/21/2026
EMMANUEL RAY BASILE103/21/2026
MUNICIPAL BUILDING CONSULTANTS103/21/2026
SKYLINE ACCESS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ORION DEVELOPMENT INCGeneral Contractor403/21/2026
ASA BUILDING MAINT INCGeneral Contractor307/08/2026
RISING SUN CONSTRUCTION*General Contractor303/21/2026
CHRISTOPHER STABILEElectrical103/21/2026
ROBERT CHIMENTIElectrical103/21/2026
MILLENIUM CENT CONTR CORPGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
KALLASSY ENGINEERING PLLC5711105/01/2025
P GEORGOPOULOS ARCHITECT889108/01/2023
Building Lifecycle
All (134)Filed (9)Permit Issued (8)Signed Off (3)Facade (FISP) (9)Violation (60)Inspection (2)Objection (29)Special Inspection (14)
07/06/2025
Violation issued (HPD, closed)
A
07/06/2025
Violation issued (HPD, closed)
A
07/06/2025
Violation issued (HPD, closed)
A
07/06/2025
Violation issued (HPD, closed)
C
07/06/2025
Violation issued (HPD, closed)
A
07/06/2025
Violation issued (HPD, closed)
A
07/06/2025
Violation issued (HPD, closed)
A
06/12/2025
Violation issued (HPD, closed)
B
06/12/2025
Violation issued (HPD, closed)
B
05/15/2025
Objection raised — Scope
05/01/2025
Filed — Alteration
PROPOSE THE STRUCTURAL WORK IN CONJUNCTION WITH THE GENERAL CONSTRUCTION WORK AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00482473-S1
04/24/2025
Filed — Alteration
PROPOSE THE STRUCTURAL WORK IN CONJUNCTION WITH THE GENERAL CONSTRUCTION WORK AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00482473-P2
04/04/2025
Special inspection requirement — Energy Code Compliance Inspections
SELIM VURAL
04/04/2025
Special inspection requirement — Final
SELIM VURAL
04/04/2025
Special inspection requirement — Fenestration air leakage
SELIM VURAL
04/04/2025
Special inspection requirement — Insulation placement and R values
SELIM VURAL
04/04/2025
Special inspection requirement — Fenestration areas
SELIM VURAL
04/04/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
SELIM VURAL
04/04/2025
Special inspection requirement — Air barrier - visual inspection
SELIM VURAL
12/16/2024
Cycle 9 facade report signed — SAFE
11/13/2024
Cycle 9 facade report submitted
11/04/2024
Signed off — Alteration
Installation of outriggers for facade repair and inspection
M01079563-I1
10/28/2024
Cycle 9 facade inspection completed
07/17/2024
Permit issued — Suspended Scaffold
M01079563-I1-SC
07/11/2024
Filed — Alteration
Installation of outriggers for facade repair and inspection
M01079563-I1
05/30/2024
Permit issued — Suspended Scaffold
M01035544-I1-SC
05/16/2024
Filed — Alteration
M01035544-I1
04/03/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/08/2024
Inspection — Pass-Final Construction Permit Withdrawal
Pass
View inspection ↗
02/22/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/14/2023
Signed off — Alteration
M00912403-I1
11/13/2023
Signed off — Alteration
INTERIOR RENOVATE TO EXISTING APARTMENT 7-A AT 7th FLOOR; REPLACEING PLUMBING FIXTURES WITH NEW ON SAME LOCATION AND CHANGE BATHROOM TUB IN TO A SHOWER. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
M00678357-I1
11/09/2023
Permit issued — General Construction
M00482473-I1-GC
10/20/2023
Permit issued — General Construction
M00482473-I1-GC
09/28/2023
Special inspection requirement — Final
SELIM VURAL
09/28/2023
Special inspection requirement — Energy Code Compliance Inspections
SELIM VURAL
09/28/2023
Special inspection requirement — Insulation placement and R values
SELIM VURAL
09/28/2023
Special inspection requirement — Air barrier - visual inspection
SELIM VURAL
09/28/2023
Special inspection requirement — Fenestration air leakage
SELIM VURAL
09/28/2023
Special inspection requirement — Fenestration areas
SELIM VURAL
09/28/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
SELIM VURAL
09/27/2023
Filed — Alteration
PROPOSE THE STRUCTURAL WORK IN CONJUNCTION WITH THE GENERAL CONSTRUCTION WORK AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00482473-P1
08/11/2023
Permit issued — General Construction
M00912403-I1-GC
08/01/2023
Filed — Alteration
M00912403-I1
04/06/2022
Permit issued — General Construction
M00678357-I1-GC
03/04/2022
Objection raised — Scope
03/04/2022
Objection resolved — Addressed
03/04/2022
Objection raised — Scope
03/04/2022
Objection resolved — Addressed
03/04/2022
Objection raised — Scope
03/04/2022
Objection resolved — Addressed
03/04/2022
Objection raised — Energy
03/04/2022
Objection resolved — Addressed
03/04/2022
Objection raised — Scope
03/04/2022
Objection resolved — Addressed
02/28/2022
Filed — Alteration
INTERIOR RENOVATE TO EXISTING APARTMENT 7-A AT 7th FLOOR; REPLACEING PLUMBING FIXTURES WITH NEW ON SAME LOCATION AND CHANGE BATHROOM TUB IN TO A SHOWER. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
M00678357-I1
11/18/2021
Permit issued — General Construction
M00570412-I1-GC
10/25/2021
Permit issued — General Construction
M00570412-I1-GC
10/08/2021
Filed — Alteration
M00570412-I1
09/14/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
Latest 60 of 134 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedSKYLINE WINDOWS, LLC07/17/2024
DOB NOWSuspended ScaffoldPermit IssuedSKYLINE RESTORATION INC05/30/2024
DOB NOWGeneral ConstructionPermit IssuedORION DEVELOPMENT INC11/09/2023
DOB NOWGeneral ConstructionPermit IssuedORION DEVELOPMENT INC10/20/2023
DOB NOWGeneral ConstructionSigned-offMILLENIUM CENT CONTR CORP08/11/2023
DOB NOWGeneral ConstructionSigned-offRISING SUN CONSTRUCTION*04/06/2022
DOB NOWGeneral ConstructionPermit IssuedASA BUILDING MAINT11/18/2021
DOB NOWGeneral ConstructionPermit IssuedASA BUILDING MAINT10/25/2021
BISPLISSUEDE.A.S. PLUMBING, INC10/20/2015
BISOTISSUEDTOWER BLDG SERVICES,INC01/15/2015
BISOTISSUEDN/A12/26/2014
BISPLISSUEDE.A.S. PLUMBING, INC09/05/2014
BISOTISSUEDTOWER BLDG SERVICES,INC06/23/2014
BISEQISSUEDEMPIRE SCAFFOLDING SYSTEM04/25/2014
BISEQISSUEDEMPIRE SCAFFOLDING SYSTEM04/25/2014
BISPLISSUEDPACE PLUMBING CORP10/28/2010
BISPLISSUEDPACE PLUMBING CORP05/19/2009
BISMHISSUEDE.W. HOWELL CO, LLC10/12/2006
BISSPISSUEDPAR FIRE PROTECTION LLC06/02/2006
BISBLISSUEDPARAMOUNT PLBG SVCS & ALTERATION05/03/2006
BISEQISSUEDPLAZA CONSTRUCTION CORP05/02/2006
BIS—ISSUEDPLAZA CONSTR. CORP05/02/2006
BISEQISSUEDREGIONAL SCAFFOLD & HOISTING CO.05/01/2006
BISEQISSUEDREGIONAL SCAFF. HOIST. CO05/01/2006
BISEQISSUEDREGIONAL SCAFFOLD & HOISTING CO.05/01/2006
BISEQISSUEDREGIONAL SCAFF. HOIST. CO04/21/2006
BISPLISSUEDPAR PLUMBING CO., INC03/03/2006
BISMHISSUEDE.W. HOWELL CO, LLC03/02/2006
BISOTISSUEDE.W. HOWELL CO, LLC03/02/2006
BISEQISSUEDPLAZA CONSTRUCTION CORP01/30/2006
BISEQISSUEDREGIONAL SCAFF. HOIST. CO01/04/2006
BISEQRE-ISSUEDREGIONAL SCAFFOLD & HOISTING CO.01/03/2006
BISSPISSUEDPREMIER FIRE SP. CO., INC.08/31/2005
BIS—ISSUEDPLAZA CONSTR. CORP06/10/2005
BISEQISSUEDPLAZA CONSTRUCTION CORP05/04/2005
BISSDISSUEDPREMIER FIRE SUPPRESSION SYSTEMS04/26/2005
BISEQISSUEDREGIONAL SCAFFOLD & HOISTING CO.04/26/2005
BISEQISSUEDREGIONAL SCAFF. HOIST. CO04/20/2005
BISEQISSUEDREGIONAL SCAFFOLD & HOISTING CO.04/18/2005
BISOTISSUEDPLAZA MADISON AVENUE04/01/2005
+ 14 more permits on file
3 projects · most recent 08/16/2023
General Wiring Lighting
FiledStatusContractorScope
08/16/2023CompleteSTABILITY ELEC ENTERP INCGeneral Wiring
03/23/2023Permit IssuedROBERT CHIMENTI3 meters, 1 new_meters
06/26/2019CancelledECO ELECTRICAL SERVCS LLCGeneral Wiring, Lighting
1 project · most recent 05/01/2025
FiledStatusContractorScope
05/01/2025Permit IssuedORION DEVELOPMENT INC1 scope_items
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
04/03/2024Pass-Final CND-Occupancy InspectionPassView ↗
03/08/2024Pass-Final Construction Permit WithdrawalPassView ↗
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
04/04/2025Energy Code Compliance InspectionsSELIM VURALprogress
04/04/2025FinalSELIM VURALprogress
04/04/2025Fenestration air leakageSELIM VURALenergy_progress
04/04/2025Insulation placement and R valuesSELIM VURALenergy_progress
04/04/2025Fenestration areasSELIM VURALenergy_progress
04/04/2025Fenestration and door U-factor and product ratingsSELIM VURALenergy_progress
04/04/2025Air barrier - visual inspectionSELIM VURALenergy_progress
09/28/2023FinalSELIM VURALprogress
09/28/2023Energy Code Compliance InspectionsSELIM VURALprogress
09/28/2023Insulation placement and R valuesSELIM VURALenergy_progress
09/28/2023Air barrier - visual inspectionSELIM VURALenergy_progress
09/28/2023Fenestration air leakageSELIM VURALenergy_progress
09/28/2023Fenestration areasSELIM VURALenergy_progress
09/28/2023Fenestration and door U-factor and product ratingsSELIM VURALenergy_progress
▾Documents — 119 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
09/03/2026M00570412-I1Request digital key ↗
08/29/2026M00912403-I1Request digital key ↗
08/29/2026M00482473-S1Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits15
▸BISPLAN / WORK APPROVAL APPLICATION9
06/11/2019103927958Open ↗
05/08/2019103927958Open ↗
03/29/2019103927958Open ↗
Showing 3 of 9 on file for this type
▸BISWORK PERMIT APPLICATION6
01/29/2015121939796Open ↗
01/07/2015122043216Open ↗
09/10/2014103829948Open ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications30
▸DOB NOWProgress Inspector Seal & Signature14
08/26/2026M00482473-P2Open ↗
08/26/2026M00482473-P2Open ↗
08/26/2026M00482473-P2Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
09/03/2026M00570412-I1Open ↗
09/02/2026M00678357-I1Open ↗
08/29/2026M00912403-I1Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
04/25/2016140190512Open ↗
04/25/2016140190683Open ↗
03/07/2014121939796Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
04/25/2014140190683Open ↗
04/24/2014140190512Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
04/25/2014140190683Open ↗
04/24/2014140190512Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
04/25/2014140190683Open ↗
04/24/2014140190512Open ↗
▸Trade Schedules & Equipment1
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
04/30/2019103829948Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
03/07/2014121939796Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/15/2026M00678357-I1Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
03/07/2014121939796Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
04/24/2014140190512Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY2
04/25/2014140190683Open ↗
04/24/2014140190512Open ↗
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
12/04/2019103927958Open ↗
▸Approvals, Objections & Sign-offs25
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST18
05/12/2020103829948Open ↗
05/04/2020103829948Open ↗
03/02/2020103829948Open ↗
Showing 3 of 18 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
01/29/2015121939796Open ↗
07/23/2014121939796Open ↗
07/23/2014121939796Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE2
09/26/2017103829948Open ↗
09/26/2017103829948Open ↗
▸BISCONSTRUCTION CODE DETERMINATION1
07/23/2014121939796Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
03/03/2015122043216Open ↗
01/22/2015122043216Open ↗
07/02/2014122043216Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms23
▸BISBOROUGH INTAKE FORM16
05/04/2020103829948Open ↗
03/02/2020103829948Open ↗
12/04/2019103829948Open ↗
Showing 3 of 16 on file for this type
▸BISADDITIONAL INFORMATION3
05/14/2019103829948Open ↗
04/30/2019103829948Open ↗
07/16/2014121939796Open ↗
▸BISEFILING COVER SHEET2
07/02/2014122043216Open ↗
03/07/2014121939796Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
04/25/2014140190683Open ↗
04/24/2014140190512Open ↗
▸Other Documents5
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
12/04/2019103927958Open ↗
12/04/2019103927958Open ↗
▸DOB NOWCalculations1
08/13/2026M01079563-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01079563-I1Open ↗
▸DOB NOWIRA Certification1
08/13/2026M01035544-I1Open ↗