← Back
Walk-up apt, over six families with stores
2253 1 AVENUE
MANHATTAN · BIN 1052914
💬 Discuss this project
1900Year Built
4Stories
C7Building Class
R7XZoning
8,000 sfGross Floor Area
9Units
Rent Stabilized6 Open Violations ▸
Walk-up apt, over six families with stores · Owner of record: GOOD NEWS, REALTY INC · 2,800 sf lot · 2.86 FAR built · Flood zone X500
Locations of Work
Architecture
Roof1p · 1 filing · 20 docs
Floor 47p · 1 filing · 20 docs
Floor 37p · 1 filing · 20 docs
Floor 27p · 1 filing · 20 docs
Floor 17p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TAORMINA HOLDING1304/09/2026
GOOD NEWS REALTY403/22/2026
TOTAL REALITY INC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ATELIER ARCHITECTURE 64, PLLC508/24/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ASKON ARCHITECTS803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PM MECHANICAL GROUP CORPGeneral Contractor204/09/2026
A & S MASTER ELEC'L CORPElectrical103/22/2026
TRI CITY MECHANICAL GROUP CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ATELIER ARCHITECTURE 64 P4634508/24/2026
Building Lifecycle
All (65)Filed (5)Permit Issued (3)Violation (27)Inspection (11)Objection (2)Special Inspection (17)
08/24/2026
Filed — Alteration CO
INTERIOR RENOVATION OF FLOOR 001 COMMERCIAL SPACE, DIVIDING INTO TWO UNITS. INTERIOR RENOVATION OF FLOOR 002.INTERIOR RENOVATION OF FLOOR 004, DIVIDING TWO UNITS INTO FOUR UNITS. NO CHANGE TO USE, BULK OR EGRESS
M00811374-P2
06/03/2026
Special inspection requirement — Lighting in dwelling units
PHILLIP ANZALONE
06/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
PHILLIP ANZALONE
06/03/2026
Special inspection requirement — Tenant Protection Plan Compliance
PHILLIP ANZALONE
06/03/2026
Special inspection requirement — Energy Code Compliance Inspections
PHILLIP ANZALONE
06/03/2026
Special inspection requirement — Interior lighting power
PHILLIP ANZALONE
04/17/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/23/2026
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
02/24/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/03/2026
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
01/14/2026
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
01/07/2026
Special inspection requirement — Tenant Protection Plan Compliance
PHILLIP ANZALONE
01/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
PHILLIP ANZALONE
01/07/2026
Special inspection requirement — Energy Code Compliance Inspections
PHILLIP ANZALONE
01/07/2026
Special inspection requirement — Interior lighting power
PHILLIP ANZALONE
01/07/2026
Special inspection requirement — Lighting in dwelling units
PHILLIP ANZALONE
12/16/2025
Objection resolved — Addressed
12/03/2025
Objection raised — Scope
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/04/2025
Filed — Alteration CO
INTERIOR RENOVATION OF FLOOR 001 COMMERCIAL SPACE, DIVIDING INTO TWO UNITS. INTERIOR RENOVATION OF FLOOR 002.INTERIOR RENOVATION OF FLOOR 004, DIVIDING TWO UNITS INTO FOUR UNITS. NO CHANGE TO USE, BULK OR EGRESS
M00811374-P1
11/04/2025
Special inspection requirement — Energy Code Compliance Inspections
PHILLIP ANZALONE
11/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
PHILLIP ANZALONE
11/04/2025
Special inspection requirement — Tenant Protection Plan Compliance
PHILLIP ANZALONE
11/04/2025
Special inspection requirement — Lighting in dwelling units
PHILLIP ANZALONE
11/04/2025
Special inspection requirement — Interior lighting power
PHILLIP ANZALONE
08/27/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/02/2025
Permit issued — General Construction
M00811374-I1-GC
03/24/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/19/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/15/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/01/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/01/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/21/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
PHILLIP ANZALONE
06/14/2024
Filed — Alteration
FILING TO INSTALL NEW AND REPLACE PLUMBING FIXTURES AS PER APPROVED PLANS IN CONJUNCTION WITH PROPOSED CONSTRUCTION FILED UNDER JOB# M00811374.
M00854755-P1
06/13/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
PHILLIP ANZALONE
06/06/2024
Permit issued — Plumbing
M00854755-I1-PL
05/22/2024
Filed — Alteration
FILING TO INSTALL NEW AND REPLACE PLUMBING FIXTURES AS PER APPROVED PLANS IN CONJUNCTION WITH PROPOSED CONSTRUCTION FILED UNDER JOB# M00811374.
M00854755-I1
11/01/2023
Permit issued — General Construction
M00811374-I1-GC
05/31/2023
Filed — Alteration CO
INTERIOR RENOVATION OF FLOOR 001 COMMERCIAL SPACE, DIVIDING INTO TWO UNITS. INTERIOR RENOVATION OF FLOOR 002.INTERIOR RENOVATION OF FLOOR 004, DIVIDING TWO UNITS INTO FOUR UNITS. NO CHANGE TO USE, BULK OR EGRESS
M00811374-I1
10/05/2018
Violation issued (HPD, closed)
I
05/21/2018
Violation issued (HPD, closed)
A
05/21/2018
Violation issued (HPD, closed)
B
05/21/2018
Violation issued (HPD, closed)
B
05/21/2018
Violation issued (HPD, closed)
B
03/19/2018
Violation issued (HPD, open)
B
03/19/2018
Violation issued (HPD, closed)
B
03/13/2018
Violation issued (HPD, closed)
A
03/13/2018
Violation issued (HPD, closed)
A
03/13/2018
Violation issued (HPD, closed)
A
03/13/2018
Violation issued (HPD, closed)
A
03/13/2018
Violation issued (HPD, closed)
A
03/13/2018
Violation issued (HPD, open)
C
04/26/2017
Violation issued (HPD, closed)
B
10/24/2016
Violation issued (HPD, closed)
I
01/16/2015
Violation issued (HPD, open)
C
07/27/2012
Violation issued (HPD, open)
B
12/07/2009
Violation issued (ECB, closed)
Boilers
05/04/1998
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/16/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/10/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 65 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedPM MECHANICAL GROUP CORP07/02/2025
DOB NOWPlumbingSigned-offFLAVIO MECHANICAL CORP06/06/2024
DOB NOWGeneral ConstructionPermit IssuedPM MECHANICAL GROUP CORP11/01/2023
BISPLISSUEDSAFETY PLMBG & HTG LLC07/26/2011
BIS—ISSUEDSUPER NEON LIGHTS CO INC07/28/1999
BISBLISSUEDPAT SEMENTA P & H CO INC11/26/1997
BISPLISSUEDPAT SEMENTA P & H CO INC11/26/1997
BIS—ISSUEDSANTARPIA WINE & LIQUOR STORE IN02/14/1991
BISPLISSUEDBRONZE PLUMBING & HEATING02/14/1991
BISEQISSUEDSANTARPIA WINE & LIQUOR STORE IN02/14/1991
1 project · most recent 06/14/2024
Gas Water/Sanitary
FiledStatusContractorScope
06/14/2024Signed-offTRI CITY MECHANICAL GROUPGas, Water/Sanitary
1 project · most recent 02/28/2024
General Wiring
FiledStatusContractorScope
02/28/2024Permit IssuedA & S MASTER ELEC'L CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
04/17/2026Pass-Final CND-Occupancy InspectionPassView ↗
03/23/2026Fail-Final CND-Occupancy InspectionFailView ↗
02/24/2026Pass-Final CND-Occupancy InspectionPassView ↗
02/03/2026Fail-Final CND-Occupancy InspectionFailView ↗
01/14/2026Fail-Final CND-Occupancy InspectionFailView ↗
08/27/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/24/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/19/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/15/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/01/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/01/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
06/03/2026Lighting in dwelling unitsPHILLIP ANZALONEenergy_progress
06/03/2026Fire-Resistant Penetrations and JointsPHILLIP ANZALONEspecial
06/03/2026Tenant Protection Plan CompliancePHILLIP ANZALONEspecial
06/03/2026Energy Code Compliance InspectionsPHILLIP ANZALONEprogress
06/03/2026Interior lighting powerPHILLIP ANZALONEenergy_progress
01/07/2026Tenant Protection Plan CompliancePHILLIP ANZALONEspecial
01/07/2026Fire-Resistant Penetrations and JointsPHILLIP ANZALONEspecial
01/07/2026Energy Code Compliance InspectionsPHILLIP ANZALONEprogress
01/07/2026Interior lighting powerPHILLIP ANZALONEenergy_progress
01/07/2026Lighting in dwelling unitsPHILLIP ANZALONEenergy_progress
11/04/2025Energy Code Compliance InspectionsPHILLIP ANZALONEprogress
11/04/2025Fire-Resistant Penetrations and JointsPHILLIP ANZALONEspecial
11/04/2025Tenant Protection Plan CompliancePHILLIP ANZALONEspecial
11/04/2025Lighting in dwelling unitsPHILLIP ANZALONEenergy_progress
11/04/2025Interior lighting powerPHILLIP ANZALONEenergy_progress
06/21/2024Fire-Resistant Penetrations and JointsPHILLIP ANZALONEspecial
06/13/2024Fire-Resistant Penetrations and JointsPHILLIP ANZALONEspecial
▾Documents — 55 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/31/2026M00811374-P2Request digital key ↗
08/31/2026M00811374-I1Request digital key ↗
08/27/2026M00854755-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
11/01/2011120874107Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026M00811374-I1Open ↗
▸Seals & Professional Certifications23
▸DOB NOWProgress Inspector Seal & Signature9
09/23/2026M00811374-P2Open ↗
09/23/2026M00811374-P2Open ↗
09/23/2026M00811374-P2Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/23/2026M00811374-P2Open ↗
09/23/2026M00811374-P2Open ↗
09/02/2026M00854755-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/27/2026M00854755-P1Open ↗
08/27/2026M00854755-I1Open ↗
08/21/2026M00811374-I1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
11/01/2011120874107Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING1
11/01/2011120874107Open ↗
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist5
08/31/2026M00811374-I1Open ↗
08/31/2026M00811374-P2Open ↗
08/21/2026M00811374-P2Open ↗
Showing 3 of 5 on file for this type
▸BISST-1 Street Tree Checklist1
01/06/2012120874107Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY1
11/01/2011120874107Open ↗
▸Approvals, Objections & Sign-offs3
▸BISSCHEDULE A - OCCUPANCY / USE2
11/01/2011120874107Open ↗
01/06/2012120874107Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
11/01/2011120874107Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
11/01/2011120874107Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
11/01/2011120874107Open ↗
▸Other Documents10
▸DOB NOWDHCR Document5
08/21/2026M00811374-P2Open ↗
08/13/2026M00854755-P1Open ↗
08/13/2026M00854755-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProperty Ownership Certification3
08/21/2026M00811374-I1Open ↗
08/21/2026M00811374-P1Open ↗
08/21/2026M00811374-P2Open ↗
▸BISPLOT DIAGRAM1
11/01/2011120874107Open ↗
▸DOB NOWFinal Survey1
08/13/2026M00811374-I1Open ↗