← Back
BuildNYC
Two stories - detached, small or mid-size
2253 QUIMBY AVENUE
BRONX · Castle Hill-Unionport · BIN 2023187
💬 Discuss this project
1925Year Built
2.5Stories
A1Building Class
R3-2Zoning
1,900 sfGross Floor Area
1Units
42 Active Violations 40 unresolved · 2 paperwork only ▸
Two stories - detached, small or mid-size · 3,300 sf lot · 0.58 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 1Window and partition renovation with bathroom1 filing · 3 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/21/2019$625K—JCBUD, LLC → Private party$329/sf building
01/24/2019$241K—Private party → JCBUD, LLC$127/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Irving M. Kusnitz PE Consulting Engineering103/11/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Obume Associates Consulting I203/21/2026
Building Lifecycle
03/11/2020
Filed — Alteration
X00306416-I1
03/11/2020
Special inspection requirement — HVAC and service water heating equipment
09/22/2017
Occupancy contrary to that allowed by d/o or department of buildings records.illegally created class"a" apartment at kitchen with full bathroom and…
ECB violation · open
08/07/2017
§ 27-2010, 2011, 2012 admin. Code: remove the accumulation of refuse and/or rubbish and maintain in a clean condition the rear court
HPD violation · open
08/07/2017
§ 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR THE CEILING & WALLS IN THE KITCHEN LOCATED AT…
HPD violation · open
48 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Nothing on file for this building.
1 project · most recent 03/31/2024
FiledStatusContractorScope
03/31/2024Permit IssuedBerger Quality Electrical Con—
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
03/11/2020HVAC and service water heating equipment —energy_progress
12 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account