← Back
Two family converted from one family
226 12 STREET
BROOKLYN · BIN 3023137
💬 Discuss this project
1901Year Built
2Stories
B3Building Class
R6BZoning
1,440 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family converted from one family · 1,667 sf lot · 0.86 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Roof2p · 1 filing · 14 docs
Floor 323p · 3 filings · 20 docs
Floor 223p · 2 filings · 20 docs
Floor 121p · 1 filing · 20 docs
Cellar25p · 2 filings · 20 docs
Basement22p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
STELLAR INDUSTRIES103/22/2026
226 12TH ST PARTNERS LLC203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/30/2024$3.0M—— → —$2,083/sf building
05/12/2021$1.4M—— → —$938/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
J.K.DESIGN603/16/2024
WAVIC ENGINEERING PLLC402/29/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NY DYNAMIC CONSTRUCTION CGeneral Contractor1503/21/2026
GOLDEN GATE BAPAZ CONSTRUGeneral Contractor1503/21/2026
TRI CITY MECHANICAL GROUP CORPPlumbing407/08/2026
STELLAR INDUSTRIES INCGeneral Contractor303/21/2026
MORELL BUILDERS INCGeneral Contractor303/21/2026
NYC PARKS & RECREATIONPlumbing303/22/2026
BT'S PLUMBING AND HEATINGPlumbing107/08/2026
WHITESTONE PLUMBING CORPFire Protection107/08/2026
TRI CITY MECHANICAL GROUPGeneral Contractor103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CL ENGINEERING P.C.6781503/16/2024
IP CONCRETE TESTING AND I6252303/16/2024
WAVIC ENGINEERING PLLC1733402/29/2024
Building Lifecycle
All (96)Filed (10)Permit Issued (16)Signed Off (3)Violation (5)Inspection (12)Objection (20)Special Inspection (30)
04/04/2024
Signed off — Alteration
Installation of new gas fired equipment and plumbing fixtures for the renovation of the existing two family dwelling. Filed in conjunction with ALT I application number B00552072..
B00582772-I1
04/01/2024
Signed off — Alteration
Install New sprinkler system as per plans.
B00564254-I1
04/01/2024
Signed off — Alteration
B00584341-I1
03/21/2024
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
INDARDEO PARBHUNATH
03/21/2024
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
03/21/2024
Special inspection requirement — HVAC-R and service water heating equipment
CHRISTIAN LOZADA
03/21/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
CHRISTIAN LOZADA
03/21/2024
Special inspection requirement — HVAC-R and service water heating system controls
CHRISTIAN LOZADA
03/21/2024
Special inspection requirement — Permanent certificate
CHRISTIAN LOZADA
03/21/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
CHRISTIAN LOZADA
03/21/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
03/20/2024
Objection resolved — Addressed
03/20/2024
Objection resolved — Addressed
03/19/2024
Objection raised — Scope
03/19/2024
Objection raised — Scope
03/16/2024
Filed — Alteration
Installation of new gas fired equipment and plumbing fixtures for the renovation of the existing two family dwelling. Filed in conjunction with ALT I application number B00552072..
B00582772-P2
03/15/2024
Special inspection requirement — HVAC-R and service water heating equipment
CHRISTIAN LOZADA
03/15/2024
Special inspection requirement — Permanent certificate
CHRISTIAN LOZADA
03/15/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
CHRISTIAN LOZADA
03/15/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
CHRISTIAN LOZADA
03/15/2024
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
INDARDEO PARBHUNATH
03/15/2024
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
03/15/2024
Special inspection requirement — HVAC-R and service water heating system controls
CHRISTIAN LOZADA
03/15/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
03/05/2024
Special inspection requirement — Sprinkler Systems
DARIUSZ LUCZAK
03/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
DARIUSZ LUCZAK
02/29/2024
Filed — Alteration
Install New sprinkler system as per plans.
B00564254-P3
02/28/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
DARIUSZ LUCZAK
02/28/2024
Special inspection requirement — Sprinkler Systems
DARIUSZ LUCZAK
02/20/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/20/2024
Inspection — Certified Sprinkler - SP - Roughing
Certified
View inspection ↗
02/08/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
02/02/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/17/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/12/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/12/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
01/12/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/12/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/04/2024
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
01/04/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
01/04/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/03/2024
Permit issued — General Construction
B00552072-I1-MS
12/27/2023
Permit issued — Foundation
B00552072-I1-GC-CX
12/22/2023
Permit issued — Mechanical Systems
B00552072-I1-GC-CX
12/21/2023
Permit issued — General Construction
B00552072-I1-GC-CX
12/12/2023
Permit issued — Plumbing
B00582772-I1-PL
12/08/2023
Permit issued — Sprinklers
B00564254-I1-EW-SP
12/04/2023
Permit issued — Structural
B00552072-I1-GC-CX
11/06/2023
Objection resolved — Addressed
10/26/2023
Objection resolved — Addressed
10/26/2023
Special inspection requirement — Shutoff dampers
CHRISTIAN LOZADA
10/26/2023
Special inspection requirement — HVAC-R and service water heating equipment
CHRISTIAN LOZADA
10/26/2023
Special inspection requirement — Interior lighting power
CHRISTIAN LOZADA
10/26/2023
Special inspection requirement — Permanent certificate
CHRISTIAN LOZADA
10/26/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
CHRISTIAN LOZADA
10/26/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
INDARDEO PARBHUNATH
10/26/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
10/26/2023
Special inspection requirement — Concrete - Cast-In-Place
CHRISTIAN LOZADA
10/26/2023
Special inspection requirement — Subgrade Inspections
CHRISTIAN LOZADA
10/26/2023
Special inspection requirement — Mechanical Systems
CHRISTIAN LOZADA
Latest 60 of 96 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offNY DYNAMIC CONSTRUCTION C01/03/2024
DOB NOWFoundationPermit IssuedNY DYNAMIC CONSTRUCTION C12/27/2023
DOB NOWMechanical SystemsPermit IssuedNY DYNAMIC CONSTRUCTION C12/22/2023
DOB NOWGeneral ConstructionPermit IssuedNY DYNAMIC CONSTRUCTION C12/21/2023
DOB NOWPlumbingSigned-offFLAVIO MECHANICAL CORP12/12/2023
DOB NOWSprinklersSigned-offTEMPERINI MECHANICAL INC12/08/2023
DOB NOWStructuralPermit IssuedNY DYNAMIC CONSTRUCTION C12/04/2023
DOB NOWConstruction FenceSigned-offMORELL BUILDERS INC02/01/2023
DOB NOWStructuralPermit IssuedSTELLAR INDUSTRIES INC01/17/2023
DOB NOWPlumbingSigned-offFLAVIO MECHANICAL CORP06/27/2022
DOB NOWMechanical SystemsPermit IssuedGOLDEN GATE BAPAZ CONSTRU01/28/2022
DOB NOWStructuralPermit IssuedGOLDEN GATE BAPAZ CONSTRU01/26/2022
DOB NOWFoundationPermit IssuedGOLDEN GATE BAPAZ CONSTRU01/22/2022
DOB NOWConstruction FenceSigned-offGOLDEN GATE BAPAZ CONSTRU11/24/2021
DOB NOWFoundationPermit IssuedGOLDEN GATE BAPAZ CONSTRU11/03/2021
DOB NOWPlumbingSigned-offBT'S PLUMBING AND HEATING10/26/2021
1 project · most recent 06/28/2023
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
06/28/2023Signed-offNY DYNAMIC CONSTRUCTION CAir Conditioning Systems, Heating Systems
Cooling
Carrier CNPVP3617AL 48,000 BTU · Furnace ×8
Mitsubishi Electric SUZ-KA24NAHZ 48,000 BTU · Furnace ×2
Heating
Carrier CVPVP3617AL 48,000 BTU · Furnace ×8
Mitsubishi Electric SUZ-KA24NAHZ 48,000 BTU · Furnace ×2
4 projects · most recent 02/21/2024
General Wiring
FiledStatusContractorScope
02/21/2024CompleteACCURATE ELEC'L CORP.General Wiring
01/15/2024CompleteACCURATE ELEC'L CORP.3 meters, 3 new_meters
09/26/2022CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
10/18/2021CompleteACCURATE ELEC'L CORP.General Wiring
1 project · most recent 06/28/2023
Concrete Masonry Wood
FiledStatusContractorScope
06/28/2023Signed-offNY DYNAMIC CONSTRUCTION CConcrete, Masonry, Wood
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
02/20/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/20/2024Certified Sprinkler - SP - RoughingCertifiedView ↗
02/08/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/02/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/17/2024Pass-Final CND-Occupancy InspectionPassView ↗
01/12/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/12/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
01/12/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/12/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
01/04/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
01/04/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
01/04/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 45
DateRequirementInspectorRole
03/21/2024Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesINDARDEO PARBHUNATHspecial
03/21/2024Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
03/21/2024HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
03/21/2024HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
03/21/2024HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
03/21/2024Permanent certificateCHRISTIAN LOZADAenergy_progress
03/21/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationCHRISTIAN LOZADAspecial
03/21/2024Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
03/15/2024HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
03/15/2024Permanent certificateCHRISTIAN LOZADAenergy_progress
03/15/2024HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
03/15/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationCHRISTIAN LOZADAspecial
03/15/2024Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesINDARDEO PARBHUNATHspecial
03/15/2024Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
03/15/2024HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
03/15/2024Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
03/05/2024Sprinkler SystemsDARIUSZ LUCZAKspecial
03/05/2024Fire-Resistant Penetrations and JointsDARIUSZ LUCZAKspecial
02/28/2024Fire-Resistant Penetrations and JointsDARIUSZ LUCZAKspecial
02/28/2024Sprinkler SystemsDARIUSZ LUCZAKspecial
10/26/2023Shutoff dampersCHRISTIAN LOZADAenergy_progress
10/26/2023HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
10/26/2023Interior lighting powerCHRISTIAN LOZADAenergy_progress
10/26/2023Permanent certificateCHRISTIAN LOZADAenergy_progress
10/26/2023Structural Stability – Alterations of existing buildingsCHRISTIAN LOZADAspecial
Latest 25 of 45.
▾Documents — 71 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
09/01/2026B00564254-P3Request digital key ↗
09/01/2026B00564254-I1Request digital key ↗
09/01/2026B00564254-P1Request digital key ↗
Showing 3 of 10 on file for this type
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026B00552072-I1Open ↗
08/13/2026B00552072-P1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026B00552072-I1Open ↗
08/13/2026B00552072-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00552072-I1Open ↗
▸Seals & Professional Certifications32
▸DOB NOWSpecial Inspector Seal & Signature14
09/01/2026B00582772-P2Open ↗
09/01/2026B00582772-P2Open ↗
08/29/2026B00582772-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
09/01/2026B00564254-I1Open ↗
09/01/2026B00564254-P3Open ↗
09/01/2026B00564254-P1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/01/2026B00582772-P2Open ↗
09/01/2026B00582772-P2Open ↗
08/29/2026B00582772-I1Open ↗
Showing 3 of 8 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist2
08/27/2026B00552072-I1Open ↗
08/14/2026B00552072-P1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00552072-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
09/01/2026B00582772-I1Open ↗
08/27/2026B00552072-I1Open ↗
08/15/2026B00582772-P2Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026B00582772-I1Open ↗
08/13/2026B00552072-I1Open ↗
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT2
08/13/2026B00552072-P1Open ↗
08/13/2026B00552072-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026B00552072-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00552072-I1Open ↗
▸Cost, Insurance & Ownership2
▸DOB NOWCertificate of Insurance1
08/13/2026B00552072-I1Open ↗
▸DOB NOWCertification by Insurance Broker or Agency1
08/13/2026B00552072-I1Open ↗
▸Other Documents8
▸DOB NOWSite Survey: Initial2
08/13/2026B00552072-I1Open ↗
08/13/2026B00552072-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026B00552072-I1Open ↗
08/13/2026B00552072-P1Open ↗
▸DOB NOWPlot Diagram2
08/13/2026B00552072-P1Open ↗
08/13/2026B00552072-I1Open ↗
▸DOB NOWAdditional Insured Authorizations1
08/13/2026B00552072-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00552072-I1Open ↗