226-54 MENTONE AVENUE
QUEENS · Laurelton · BIN 4283748
💬 Discuss this project
1935Year Built
2.5Stories
A1Building Class
R3AZoning
2,128 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 4,318 sf lot · 0.49 FAR built · Flood zone X500
Locations of Work
Electrical
Permit Issued — active, not yet Signed-off
RoofUnder Construction3p · 1 filing · 8 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC104/16/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272104/16/2026
Building Lifecycle
All (7)Filed (1)Permit Issued (1)Special Inspection (5)
04/22/2026
Permit issued — Solar
Q01386157-I1-SL
04/16/2026
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q01386157-I1
04/16/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
04/16/2026
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
04/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
04/13/2026
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
04/13/2026
Special inspection requirement — Final
Walid Abdulla
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedSUNRUN INSTALLATION SVC04/22/2026
1 project · most recent 04/16/2026
FiledStatusContractorScope
04/16/2026CompleteSUNRUN SOLAR ELECTL CORP—
1 project · most recent 04/16/2026
FiledStatusContractorScope
04/16/2026Permit IssuedSUNRUN INSTALLATION SVC24 panels, 10.8 kw, 504.48 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
04/16/2026Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
04/16/2026Air barrier - visual inspectionWalid Abdullaenergy_progress
04/13/2026Fire-Resistant Penetrations and JointsWalid Abdullaspecial
04/13/2026Energy Code Compliance InspectionsWalid Abdullaprogress
04/13/2026FinalWalid Abdullaprogress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/17/2026Q01386157-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/26/2026Q01386157-I1Open ↗
08/26/2026Q01386157-I1Open ↗
08/26/2026Q01386157-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/26/2026Q01386157-I1Open ↗
08/26/2026Q01386157-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/17/2026Q01386157-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/17/2026Q01386157-I1Open ↗