Elevator cooperative
226 EAST 12 STREET
MANHATTAN · East Village · BIN 1006834
💬 Discuss this project
1928Year Built
11Stories
D4Building Class
R8BZoning
53,055 sfGross Floor Area
84Units
LL97 CoveredRent Stabilized39 Open Violations 38 unresolved · 1 paperwork only ▸FISP: SWARMPFDNY Report ↗
Elevator cooperative · Owner of record: 226-230 EAST 12TH ST. OWNERS CORP. · 7,029 sf lot · 7.55 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Roof6p · 3 filings · 13 docs
Floor 101p · 1 filing · 10 docs
Floor 91 filing · 10 docs
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 34p · 3 filings · 20 docs
Floor 2
Floor 12 filings · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ORSID REALTY3707/08/2026
226-230 EAST 12TH ST. OWNERS CORP.403/22/2026
ARGO REAL ESTATE703/21/2026
226 E 12TH STREET OWNERS CORP603/21/2026
ARGO203/21/2026
226-230 E 12 ST OWNERS1003/21/2026
ARGI203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ZDCI701/21/2025
MELONE ARCHITECTS109/19/2024
REFORM ARCHITECTURE PLLC111/22/2022
SYED ENGINEERING, P.C.310/26/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AC BUILDING CONSULTANTS203/21/2026
PS ENGINEERS403/21/2026
I L CONSULTING1403/21/2026
ADVANCED BUILDERS SERVICES303/21/2026
BOYD CONSULTING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HIGH QUALITY RENOVATION IGeneral Contractor1107/08/2026
TOPLINE GC INCGeneral Contractor507/08/2026
INNOVATIVE MECHANICAL CORGeneral Contractor207/08/2026
IMR ELECTRICAL CONTRACTINElectrical203/22/2026
TRIBUTE RESTORATION INCGeneral Contractor104/09/2026
BERMAN BRYANElectrical103/21/2026
PROCORE MECHANICAL CORPPlumbing107/08/2026
BRYAN BERMANElectrical103/21/2026
M & R ELECL CONTG AND REPElectrical103/22/2026
NICHOLAS BLASONEElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GEIGER ENGINEERING. PC689501/21/2025
MELONE ARCHITECTS2944109/19/2024
PONDOSA DESIGN INC.5126208/29/2024
C.M. TESTING LABORATORY,1352111/22/2022
Building Lifecycle
All (159)Filed (14)Permit Issued (15)Signed Off (7)Facade (FISP) (15)Violation (60)Inspection (6)Objection (12)Special Inspection (30)
06/10/2026
Signed off — Alteration
File-Supported PIPE SCAFFOLD AS SHOWN ON THE PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M01151254-I1
05/05/2026
Violation issued (HPD, open)
B
04/02/2026
Cycle 10 facade report submitted
03/31/2026
Cycle 10 facade report signed — SAFE
03/26/2026
Cycle 10 facade inspection completed
11/04/2025
Violation issued (HPD, closed)
B
11/04/2025
Violation issued (HPD, closed)
C
10/22/2025
Signed off — Alteration
M01108463-I1
10/02/2025
Permit issued — Suspended Scaffold
M01151254-I1-SC
07/22/2025
Violation issued (HPD, closed)
B
07/15/2025
Violation issued (HPD, closed)
A
07/15/2025
Violation issued (HPD, closed)
A
07/15/2025
Violation issued (HPD, closed)
A
07/15/2025
Violation issued (HPD, closed)
B
07/15/2025
Violation issued (HPD, closed)
A
07/15/2025
Violation issued (HPD, closed)
C
07/15/2025
Violation issued (HPD, closed)
C
07/15/2025
Violation issued (HPD, closed)
A
04/30/2025
Signed off — Alteration
APARTMENT COMBINATION 3A/E AS PER PLANS SUBMITTED HEREWITH. PARTITIONS AND FINISHES WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. (PLUMBING FILED UNDER APPLICATION NO M01040395, MECHANICAL FILED UNDER APPLICATION M01040408)
M01040386-I1
04/29/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
04/22/2025
Signed off — Alteration
INSTALL NON DUCTED AC SYSTEM IN APT 3A/E AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. (GENERAL CONSTRUCTION FILED UNDER APPLICATION M01040386)
M01040408-I1
04/21/2025
Signed off — Alteration
REMOVE AND INSTALL PLUMBING FIXTURES AS PER PLANS SUBMITTED HEREWITH. (GENERAL CONSTRUCTION FILED UNDER APPLICATION M01040386)
M01040395-I1
03/26/2025
Permit issued — Suspended Scaffold
M01151254-I1-SC
03/24/2025
Filed — Alteration
File-Supported PIPE SCAFFOLD AS SHOWN ON THE PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M01151254-P1
03/21/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
FRANCISCO PEREZ
03/04/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ELISHA GEIGER
01/23/2025
Permit issued — Mechanical Systems
M01040408-I1-MS
01/23/2025
Permit issued — General Construction
M01040386-I1-GC
01/21/2025
Filed — Alteration
REMOVE AND INSTALL PLUMBING FIXTURES AS PER PLANS SUBMITTED HEREWITH. (GENERAL CONSTRUCTION FILED UNDER APPLICATION M01040386)
M01040395-P2
01/12/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/09/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/18/2024
Permit issued — Suspended Scaffold
M01151254-I1-SC
12/11/2024
Filed — Alteration
APARTMENT COMBINATION 3A/E AS PER PLANS SUBMITTED HEREWITH. PARTITIONS AND FINISHES WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. (PLUMBING FILED UNDER APPLICATION NO M01040395, MECHANICAL FILED UNDER APPLICATION M01040408)
M01040386-P1
12/11/2024
Filed — Alteration
REMOVE AND INSTALL PLUMBING FIXTURES AS PER PLANS SUBMITTED HEREWITH. (GENERAL CONSTRUCTION FILED UNDER APPLICATION M01040386)
M01040395-P1
12/05/2024
Filed — Alteration
File-Supported PIPE SCAFFOLD AS SHOWN ON THE PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M01151254-I1
11/15/2024
Permit issued — General Construction
M01108463-I1-GC
10/09/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Nicholas Melone
09/20/2024
Permit issued — Mechanical Systems
M01040408-I1-MS
09/19/2024
Filed — Alteration
M01108463-I1
09/10/2024
Special inspection requirement — Mechanical Systems
MANG WONG
09/10/2024
Special inspection requirement — Shutoff dampers
Sasha Goldberg
09/10/2024
Special inspection requirement — Energy Code Compliance Inspections
Sasha Goldberg
09/10/2024
Special inspection requirement — Final
Sasha Goldberg
09/10/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Sasha Goldberg
09/10/2024
Special inspection requirement — HVAC-R and service water heating equipment
Sasha Goldberg
09/10/2024
Special inspection requirement — Maintenance information
Sasha Goldberg
09/10/2024
Special inspection requirement — HVAC-R and service water heating system controls
Sasha Goldberg
09/09/2024
Special inspection requirement — Final
Nicholas Melone
09/09/2024
Special inspection requirement — Masonry
Nicholas Melone
09/09/2024
Special inspection requirement — Tenant Protection Plan Compliance
Nicholas Melone
09/05/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/29/2024
Filed — Alteration
INSTALL NON DUCTED AC SYSTEM IN APT 3A/E AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. (GENERAL CONSTRUCTION FILED UNDER APPLICATION M01040386)
M01040408-P2
08/29/2024
Special inspection requirement — Maintenance information
Sasha Goldberg
08/29/2024
Special inspection requirement — Mechanical Systems
MANG WONG
08/29/2024
Special inspection requirement — Energy Code Compliance Inspections
Sasha Goldberg
08/29/2024
Special inspection requirement — Final
Sasha Goldberg
08/29/2024
Special inspection requirement — HVAC-R and service water heating system controls
Sasha Goldberg
08/29/2024
Special inspection requirement — Shutoff dampers
Sasha Goldberg
08/29/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Sasha Goldberg
Latest 60 of 159 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldSigned-offTRIBUTE RESTORATION INC10/02/2025
DOB NOWSuspended ScaffoldSigned-offTRIBUTE RESTORATION INC03/26/2025
DOB NOWMechanical SystemsSigned-offHIGH QUALITY RENOVATION I01/23/2025
DOB NOWGeneral ConstructionSigned-offHIGH QUALITY RENOVATION I01/23/2025
DOB NOWSuspended ScaffoldSigned-offTRIBUTE RESTORATION INC12/18/2024
DOB NOWGeneral ConstructionSigned-offTRIBUTE RESTORATION INC11/15/2024
DOB NOWMechanical SystemsSigned-offHIGH QUALITY RENOVATION I09/20/2024
DOB NOWGeneral ConstructionSigned-offHIGH QUALITY RENOVATION I08/23/2024
DOB NOWPlumbingSigned-offPROCORE MECHANICAL CORP06/12/2024
DOB NOWGeneral ConstructionSigned-offHIGH QUALITY RENOVATION I06/11/2024
DOB NOWMechanical SystemsSigned-offINNOVATIVE MECHANICAL COR03/24/2023
DOB NOWMechanical SystemsSigned-offINNOVATIVE MECHANICAL COR12/09/2022
DOB NOWSidewalk ShedPermit IssuedTOPLINE GC INC10/27/2021
DOB NOWSidewalk ShedSigned-offTOPLINE GC INC06/18/2021
DOB NOWSidewalk ShedSigned-offTOPLINE GC INC11/24/2020
BISPLISSUEDORBIT PLBG & HTG INC07/07/2023
BISOTISSUEDALL CON CONTRACTING CORP04/18/2022
BISOTISSUEDALL CON CONTRACTING CORP11/10/2021
BISOTISSUEDALL CON CONTRACTING CORP02/10/2021
BISOTISSUEDALL CON CONTRACTING CORP10/07/2020
BISPLISSUEDGANIC PLUMBING & HTG INC11/25/2019
BISOTISSUEDMIRACLEMAN HANDYMAN INC10/22/2019
BISOTISSUEDMIRACLEMAN HANDYMAN INC10/24/2018
BISOTISSUEDMIRACLEMAN HANDYMAN INC06/01/2018
BISOTISSUEDAGGRESSIVE HEATING INC11/22/2017
BISOTISSUEDJEPOL CONSTRUCTION INC01/29/2016
BISPLISSUEDSAFETY PLMBG & HTG LLC11/18/2015
BISOTISSUEDJEPOL CONSTRUCTION INC10/27/2015
BISEQISSUEDADVANCED CONSTRUCTION EQUIPMENT11/05/2012
BISPLISSUEDORBIT PLBG & HTG INC07/09/2012
BISOTISSUEDJEPOL CONSTRUCTION INC07/06/2012
BISOTISSUEDBERNINI CONSTRUCTION CORP05/31/2012
BISEQISSUEDADVANCED CONSTRUCTION EQUIPMENT05/23/2012
BISPLISSUEDG.BASSOLINO PLUMBING LTD08/16/2011
BISOTISSUEDG.BASSOLINO PLUMBING LTD08/08/2011
BISPLISSUEDG.BASSOLINO PLUMBING LTD11/15/2010
BISOTISSUEDMAREK SZMACINSKI10/22/2010
BISOTISSUEDG.BASSOLINO PLUMBING LTD08/12/2010
BISPLISSUEDG.BASSOLINO PLUMBING LTD08/12/2010
BISPLISSUEDAMM GEN'L CONTRACTING INC04/21/2010
+ 25 more permits on file
9 projects · most recent 09/01/2026
General Wiring
FiledStatusContractorScope
09/01/2026CompleteGLENDALE ELECTL CONTNG IN—
06/12/2024CompleteGLENDALE ELECTL CONTNG INGeneral Wiring
11/30/2023CompleteIMR ELECTRICAL CONTRACTINGeneral Wiring
04/17/2023CompleteIMR ELECTRICAL CONTRACTINGeneral Wiring
09/21/2021CompleteM & R ELECL CONTG AND REPGeneral Wiring
08/20/2021CompleteM & R ELECL CONTG AND REPGeneral Wiring
07/02/2019CompleteREDLINE ELECTRIC INC—
09/19/2018CompleteL.J.F. & SONS ELECL CONTSGeneral Wiring
03/12/2018CompleteJAVELIN ELECTRIC INC—
1 project · most recent 10/26/2021
Sidewalk Shed
FiledStatusContractorScope
10/26/2021Permit IssuedTOPLINE GC INCSidewalk Shed
1 project · most recent 03/24/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
03/24/2025Signed-offTRIBUTE RESTORATION INCSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
04/29/2025Pass-Final General Construction Non-Directive 14PassView ↗
03/04/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/12/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/09/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/05/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/31/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
03/21/2025Alternative Materials - OTCR Buildings Bulletin NumberFRANCISCO PEREZspecial
02/07/2025Fire-Resistant Penetrations and JointsELISHA GEIGERspecial
10/09/2024Structural Stability – Alterations of existing buildingsNicholas Melonespecial
09/10/2024Mechanical SystemsMANG WONGspecial
09/10/2024Shutoff dampersSasha Goldbergenergy_progress
09/10/2024Energy Code Compliance InspectionsSasha Goldbergprogress
09/10/2024FinalSasha Goldbergprogress
09/10/2024HVAC-R and service water piping design and insulationSasha Goldbergenergy_progress
09/10/2024HVAC-R and service water heating equipmentSasha Goldbergenergy_progress
09/10/2024Maintenance informationSasha Goldbergenergy_progress
09/10/2024HVAC-R and service water heating system controlsSasha Goldbergenergy_progress
09/09/2024FinalNicholas Meloneprogress
09/09/2024MasonryNicholas Melonespecial
09/09/2024Tenant Protection Plan ComplianceNicholas Melonespecial
08/29/2024Maintenance informationSasha Goldbergenergy_progress
08/29/2024Mechanical SystemsMANG WONGspecial
08/29/2024Energy Code Compliance InspectionsSasha Goldbergprogress
08/29/2024FinalSasha Goldbergprogress
08/29/2024HVAC-R and service water heating system controlsSasha Goldbergenergy_progress
08/29/2024Shutoff dampersSasha Goldbergenergy_progress
08/29/2024HVAC-R and service water piping design and insulationSasha Goldbergenergy_progress
08/29/2024HVAC-R and service water heating equipmentSasha Goldbergenergy_progress
11/22/2022HVAC-R and service water heating equipmentDionisio Cortes Ortegaenergy_progress
11/22/2022HVAC-R and service water piping design and insulationDionisio Cortes Ortegaenergy_progress
11/22/2022HVAC-R and service water heating system controlsDionisio Cortes Ortegaenergy_progress
Latest 25 of 30.
▾Documents — 351 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch12
09/03/2026M00617746-I1Request digital key ↗
09/01/2026M08040015-I1Request digital key ↗
08/27/2026M01040395-P1Request digital key ↗
Showing 3 of 12 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/04/2026M00408931-I1Request digital key ↗
08/15/2026M00408931-P1Request digital key ↗
▸Applications & Permits65
▸BISPLAN / WORK APPROVAL APPLICATION33
05/08/2023121084049Open ↗
11/10/2022121084049Open ↗
10/07/2021120239535Open ↗
Showing 3 of 33 on file for this type
▸BISWORK PERMIT APPLICATION31
07/07/2023121084049Open ↗
03/15/2023121084049Open ↗
02/10/2021140927004Open ↗
Showing 3 of 31 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications75
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION25
03/11/2019123654946Open ↗
03/11/2019123654946Open ↗
10/21/2016121075424Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWProgress Inspector Seal & Signature16
09/01/2026M00408931-I1Open ↗
08/29/2026M01040408-I1Open ↗
08/29/2026M01040408-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
09/04/2026M00408931-I1Open ↗
09/03/2026M00617746-I1Open ↗
08/27/2026M01040395-P2Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
08/29/2026M01040408-I1Open ↗
08/28/2026M01040408-P2Open ↗
08/26/2026M08040015-I1Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
05/24/2012121075424Open ↗
04/19/2012121048080Open ↗
Showing 2 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
05/24/2012121075424Open ↗
04/19/2012121048080Open ↗
Showing 2 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
07/29/2020140927004Open ↗
03/29/2018140748243Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
11/20/2017140718114Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
11/20/2017140718114Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
11/20/2017140718114Open ↗
▸Trade Schedules & Equipment27
▸BISSELF-CERT PLUMBING NOTICE13
11/02/2011120403367Open ↗
11/02/2011120425762Open ↗
Showing 2 of 13 on file for this type
▸BISSCHEDULE B - PLUMBING11
11/13/2019140748243Open ↗
09/19/2019140748243Open ↗
03/29/2018140748243Open ↗
Showing 3 of 11 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
03/11/2019123654946Open ↗
10/08/2015122512085Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
11/20/2017140718114Open ↗
▸Safety & Tenant Protection8
▸BISTENANT PROTECTION PLAN AND NOTES6
10/19/2021120239535Open ↗
08/12/2021110381122Open ↗
07/29/2020140927004Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWTenant Protection Plan2
09/04/2026M00408931-I1Open ↗
08/13/2026M00408931-P1Open ↗
▸Environmental & Asbestos23
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)9
07/29/2020140927004Open ↗
04/26/2019123654946Open ↗
03/29/2018140748243Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
08/27/2026M01040395-I1Open ↗
08/27/2026M01040386-I1Open ↗
08/13/2026M01040408-I1Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/26/2026M01108463-I1Open ↗
08/13/2026M08040015-I1Open ↗
▸Energy Compliance27
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY8
05/16/2022140927004Open ↗
09/21/2021123654946Open ↗
09/21/2021123654946Open ↗
Showing 3 of 8 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS7
05/16/2022140927004Open ↗
09/21/2021123654946Open ↗
09/21/2021123654946Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
03/11/2019123654946Open ↗
03/11/2019123654946Open ↗
05/31/2016122512085Open ↗
Showing 3 of 6 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
08/12/2020140927004Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
11/20/2017140718114Open ↗
▸BISTR8: Energy Code Progress Inspections1
04/19/2012121048080Open ↗
▸BISLIGHTING IN DWELLING UNITS1
11/06/2023121084049Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
11/06/2023121084049Open ↗
▸BISLIGHTING CONTROLS1
11/06/2023121084049Open ↗
▸Inspections & Test Reports19
▸BISTECHNICAL REPORT: RESPONSIBILITY14
05/20/2022140927004Open ↗
05/16/2022140927004Open ↗
10/19/2021120239535Open ↗
Showing 3 of 14 on file for this type
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS1
08/06/2020140927004Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
11/06/2023121084049Open ↗
▸BISMASONRY1
08/12/2020140927004Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
08/12/2020140927004Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
08/12/2021110381122Open ↗
▸Approvals, Objections & Sign-offs24
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST13
12/12/2023121084049Open ↗
05/23/2022140927004Open ↗
10/19/2021120239535Open ↗
Showing 3 of 13 on file for this type
▸BISADMINISTRATIVE OBJECTIONS9
05/29/2012121084049Open ↗
05/24/2012121075424Open ↗
04/19/2012121048080Open ↗
Showing 3 of 9 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
03/11/2019123654946Open ↗
01/09/2013121048080Open ↗
▸Cost, Insurance & Ownership27
▸BISCOST AFFIDAVIT25
05/16/2022140927004Open ↗
10/19/2021120239535Open ↗
09/21/2021123654946Open ↗
Showing 3 of 25 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
11/06/2023121084049Open ↗
▸BISHIC LICENSE OR AFFIDAVIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms34
▸BISADDITIONAL INFORMATION20
10/07/2021120239535Open ↗
07/08/2021123654946Open ↗
08/06/2020123654946Open ↗
Showing 3 of 20 on file for this type
▸BISEFILING COVER SHEET10
03/11/2019123654946Open ↗
03/11/2019123654946Open ↗
05/29/2012121084049Open ↗
Showing 3 of 10 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
07/29/2020140927004Open ↗
03/29/2018140748243Open ↗
11/20/2017140718114Open ↗
▸BISBOROUGH INTAKE FORM1
11/25/2019140748243Open ↗
▸Other Documents8
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
12/20/2012120425762Open ↗
11/08/2012121075424Open ↗
▸DOB NOWCalculations2
08/24/2026M01151254-I1Open ↗
08/13/2026M01151254-P1Open ↗
▸DOB NOWManufacturer's Specifications2
08/24/2026M01151254-I1Open ↗
08/13/2026M01151254-P1Open ↗
▸BISDepartment of Consumer Affairs (DCA) Form1
07/09/2012121084049Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
12/11/2023121084049Open ↗