← Back
Over six families without stores
Williamsburg Houses
226 HUMBOLDT STREET · East Williamsburg · BIN 3338402
💬 Discuss this project
1938Year Built
4Stories
C1Building Class
R6Zoning
356,820 sfGross Floor Area
490Units
LL97 CoveredRent Stabilized1 Open Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
Over six families without stores · Owner of record: WILLIAMSBURG PACT LLC · 283,200 sf lot · 1.26 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingCivil
Roof4p · 2 filings · 20 docs
Bulkhead2p · 1 filing · 20 docs
Floor 21p · 1 filing · 20 docs
Floor 14p · 4 filings · 20 docs
Cellar1p · 1 filing · 6 docs
Basement3p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
YARKS NYC INC703/22/2026
NYCHA103/21/2026
NYC HOUSING AUTH303/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CHARIS CONSULTING803/21/2026
DVA Advisors703/21/2026
WILLIAM VITACCO ASSOCIATES203/21/2026
A1 EXPEDITING SERVICE203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ZONE PLUMBING & HEATING CPlumbing1607/08/2026
MDG DESIGN & CONSTR LLCGeneral Contractor803/21/2026
YARKS NYC INCGeneral Contractor603/21/2026
MIGUEL HAMILTONElectrical203/21/2026
A1 EXPEDITING SERVICE CORElectrical103/21/2026
SNS ORGNIZATION LTDGeneral Contractor107/08/2026
KTB ELECTRIC INC.Electrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LORJAN AGALLIU ARCHITECT6104810/17/2024
DOMANI INSPECTION SERVICE843307/31/2024
Building Lifecycle
All (93)Filed (13)Permit Issued (8)Signed Off (7)Violation (14)Inspection (3)Objection (18)Special Inspection (30)
04/07/2025
Signed off — Alteration
Interior renovation to include demo & replacement of existing PL fixtures & kitchen appliances, millwork & windows. Partition removal & construction to meet UFAS requirements. New ADA accessible entrances being provided. Work limited to apt 1C, 1D, 1A, 1B
B08003443-I1
04/02/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
03/27/2025
Signed off — Alteration
Various landscaping/site work filed for block 4 building cluster. All work to take place within the property line. No change in use, egress or occupancy.
B00890263-I1
03/17/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
12/30/2024
Signed off — Alteration
B00492816-I1
12/16/2024
Signed off — Alteration
Additions & modifications to existing plumbing system and related piping. Filed in conjunction with GC #B00492049-I1 & MS #B00492816-I1. No change in use, egress or occupancy.
B00493487-I1
12/16/2024
Signed off — Alteration
B00492049-I1
12/05/2024
Permit issued — General Construction
B08003443-I1-GC
11/01/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
lorjan agalliu
10/28/2024
Objection resolved — Addressed
10/24/2024
Signed off — Alteration
HEAVY DUTY SIDEWALK SHED DURING BLDG ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B00941682-I1
10/21/2024
Special inspection requirement — Tenant Protection Plan Compliance
lorjan agalliu
10/21/2024
Special inspection requirement — Fire-Resistance Rated Construction
lorjan agalliu
10/17/2024
Filed — Alteration
Interior renovation to include demo & replacement of existing PL fixtures & kitchen appliances, millwork & windows. Partition removal & construction to meet UFAS requirements. New ADA accessible entrances being provided. Work limited to apt 1C, 1D, 1A, 1B
B08003443-P1
10/10/2024
Signed off — Alteration
INSTALLATION OF ACCESSIBLE RAMPS ON EXTERIOR OF BUILDING. THE STRUCTURAL DESIGN WORK DOES NOT CONSTITUTE ADDITION TO THE EXISTING BUILDING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00765018-I1
10/09/2024
Special inspection requirement — Tenant Protection Plan Compliance
lorjan agalliu
10/09/2024
Special inspection requirement — Fire-Resistance Rated Construction
lorjan agalliu
10/04/2024
Objection raised — Scope
09/26/2024
Filed — Alteration
Additions & modifications to existing plumbing system and related piping. Filed in conjunction with GC #B00492049-I1 & MS #B00492816-I1. No change in use, egress or occupancy.
B00493487-P2
09/26/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/22/2024
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
08/01/2024
Permit issued — Earth Work
B00890263-I1-GC-CX
07/31/2024
Filed — Alteration
INSTALLATION OF ACCESSIBLE RAMPS ON EXTERIOR OF BUILDING. THE STRUCTURAL DESIGN WORK DOES NOT CONSTITUTE ADDITION TO THE EXISTING BUILDING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00765018-P2
06/20/2024
Violation issued (HPD, closed)
B
06/20/2024
Violation issued (HPD, closed)
B
06/20/2024
Violation issued (HPD, closed)
B
06/20/2024
Violation issued (HPD, closed)
B
06/14/2024
Permit issued — Plumbing
B00493487-I1-PL
05/20/2024
Permit issued — Mechanical Systems
B00492816-I1-MS
04/02/2024
Violation issued (HPD, closed)
A
04/02/2024
Violation issued (HPD, closed)
A
04/02/2024
Violation issued (HPD, closed)
A
03/06/2024
Violation issued (HPD, closed)
C
02/22/2024
Permit issued — General Construction
B00492049-I1-GC
02/14/2024
Permit issued — Sidewalk Shed
B00941682-I1-SH
11/24/2023
Special inspection requirement — Interior lighting power
lorjan agalliu
11/24/2023
Special inspection requirement — Masonry
lorjan agalliu
11/24/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
lorjan agalliu
11/24/2023
Special inspection requirement — Fire-Resistance Rated Construction
lorjan agalliu
11/24/2023
Special inspection requirement — Final
lorjan agalliu
11/24/2023
Special inspection requirement — Energy Code Compliance Inspections
lorjan agalliu
11/24/2023
Special inspection requirement — Lighting controls
lorjan agalliu
11/24/2023
Special inspection requirement — Lighting in dwelling units
lorjan agalliu
11/24/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
lorjan agalliu
11/24/2023
Special inspection requirement — Exterior lighting power
lorjan agalliu
11/22/2023
Filed — Alteration
Interior renovation to include demo & replacement of existing PL fixtures & kitchen appliances, millwork & windows. Partition removal & construction to meet UFAS requirements. New ADA accessible entrances being provided. Work limited to apt 1C, 1D, 1A, 1B
B08003443-I1
11/22/2023
Filed — Alteration
B00492049-P2
10/12/2023
Permit issued — Sidewalk Shed
B00941682-I1-SH
10/12/2023
Permit issued — Foundation
B00765018-I1-GC-CX
10/06/2023
Filed — Alteration
HEAVY DUTY SIDEWALK SHED DURING BLDG ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B00941682-I1
09/12/2023
Objection resolved — Addressed
09/11/2023
Objection resolved — Addressed
09/09/2023
Objection raised — Other
09/09/2023
Objection raised — Other
09/01/2023
Filed — Alteration
INSTALLATION OF ACCESSIBLE RAMPS ON EXTERIOR OF BUILDING. THE STRUCTURAL DESIGN WORK DOES NOT CONSTITUTE ADDITION TO THE EXISTING BUILDING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00765018-P1
08/21/2023
Filed — Alteration
Various landscaping/site work filed for block 4 building cluster. All work to take place within the property line. No change in use, egress or occupancy.
B00890263-I1
08/07/2023
Special inspection requirement — Exterior lighting power
lorjan agalliu
08/07/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
lorjan agalliu
08/07/2023
Special inspection requirement — Masonry
lorjan agalliu
08/07/2023
Special inspection requirement — Energy Code Compliance Inspections
lorjan agalliu
Latest 60 of 93 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offMDG DESIGN & CONSTR LLC12/05/2024
DOB NOWEarth WorkSigned-offMDG DESIGN & CONSTR LLC08/01/2024
DOB NOWPlumbingSigned-offZONE PLUMBING & HEATING C06/14/2024
DOB NOWMechanical SystemsSigned-offSNS ORGNIZATION LTD05/20/2024
DOB NOWGeneral ConstructionSigned-offMDG DESIGN & CONSTR LLC02/22/2024
DOB NOWSidewalk ShedSigned-offYARKS NYC INC02/14/2024
DOB NOWSidewalk ShedSigned-offYARKS NYC INC10/12/2023
DOB NOWFoundationSigned-offMDG DESIGN & CONSTR LLC10/12/2023
BISSPISSUEDV. C. VITANZA SONS INC04/22/2003
7 projects · most recent 02/06/2026
General Wiring
FiledStatusContractorScope
02/06/2026CompleteKTB ELECTRIC INC.General Wiring
02/06/2026CompleteKTB ELECTRIC INC.General Wiring
09/06/2024CompleteDELCO ELECTRICAL CORP.General Wiring
09/06/2024CompleteDELCO ELECTRICAL CORP.General Wiring
09/06/2024CompleteDELCO ELECTRICAL CORP.General Wiring
09/04/2024Permit IssuedKTB ELECTRIC INC.General Wiring
10/09/2020CompleteJEMCO ELECT. CONTRS INC—
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
04/02/2025Pass-Final General Construction Non-Directive 14PassView ↗
03/17/2025Fail-Final General Construction Non-Directive 14FailView ↗
08/22/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 36
DateRequirementInspectorRole
11/01/2024Fire-Resistant Penetrations and Jointslorjan agalliuspecial
10/21/2024Tenant Protection Plan Compliancelorjan agalliuspecial
10/21/2024Fire-Resistance Rated Constructionlorjan agalliuprogress
10/09/2024Tenant Protection Plan Compliancelorjan agalliuspecial
10/09/2024Fire-Resistance Rated Constructionlorjan agalliuprogress
09/26/2024Fire-Resistant Penetrations and Joints—special
11/24/2023Interior lighting powerlorjan agalliuenergy_progress
11/24/2023Masonrylorjan agalliuspecial
11/24/2023Fire-Resistant Penetrations and Jointslorjan agalliuspecial
11/24/2023Fire-Resistance Rated Constructionlorjan agalliuprogress
11/24/2023Finallorjan agalliuprogress
11/24/2023Energy Code Compliance Inspectionslorjan agalliuprogress
11/24/2023Lighting controlslorjan agalliuenergy_progress
11/24/2023Lighting in dwelling unitslorjan agalliuenergy_progress
11/24/2023Fenestration and door U-factor and product ratingslorjan agalliuenergy_progress
11/24/2023Exterior lighting powerlorjan agalliuenergy_progress
08/07/2023Exterior lighting powerlorjan agalliuenergy_progress
08/07/2023Fire-Resistant Penetrations and Jointslorjan agalliuspecial
08/07/2023Masonrylorjan agalliuspecial
08/07/2023Energy Code Compliance Inspectionslorjan agalliuprogress
08/07/2023Finallorjan agalliuprogress
08/07/2023Fire-Resistance Rated Constructionlorjan agalliuprogress
08/07/2023Lighting in dwelling unitslorjan agalliuenergy_progress
08/07/2023Fenestration and door U-factor and product ratingslorjan agalliuenergy_progress
08/07/2023Interior lighting powerlorjan agalliuenergy_progress
Latest 25 of 36.
▾Documents — 89 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
08/31/2026B00492816-I1Request digital key ↗
08/31/2026B00493487-I1Request digital key ↗
08/31/2026B00492049-P2Request digital key ↗
Showing 3 of 13 on file for this type
▸Applications & Permits12
▸DOB NOWLPC Approval/Permit12
08/31/2026B00493487-I1Open ↗
08/14/2026B00493487-P2Open ↗
08/13/2026B00890263-I1Open ↗
Showing 3 of 12 on file for this type
▸Seals & Professional Certifications32
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/31/2026B00492816-I1Open ↗
08/31/2026B00493487-I1Open ↗
08/31/2026B00493487-P2Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
09/01/2026B00492049-P1Open ↗
09/01/2026B00492049-P1Open ↗
08/27/2026B08003443-P1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/01/2026B00492049-P1Open ↗
09/01/2026B00492049-P1Open ↗
08/27/2026B08003443-P1Open ↗
Showing 3 of 9 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/31/2026B00492816-I1Open ↗
08/31/2026B00493487-I1Open ↗
08/31/2026B00492049-I1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00492049-I1Open ↗
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT3
08/13/2026B00765018-P2Open ↗
08/13/2026B00765018-P1Open ↗
08/13/2026B00765018-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00765018-I1Open ↗
▸Approvals, Objections & Sign-offs18
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter13
08/31/2026B00492816-I1Open ↗
08/31/2026B00493487-I1Open ↗
08/31/2026B00492049-P2Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDEP Variance (V5) letter4
08/31/2026B00492816-I1Open ↗
08/31/2026B00493487-I1Open ↗
08/31/2026B00492049-I1Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
09/21/2020301494595Open ↗
▸Other Documents5
▸DOB NOWProof of Historic Building5
08/13/2026B00765018-I1Open ↗
08/13/2026B08003443-P1Open ↗
08/13/2026B08003443-I1Open ↗
Showing 3 of 5 on file for this type