Over six families without stores
Williamsburg Houses
226 HUMBOLDT STREET · BIN 3344992
💬 Discuss this project
1938Year Built
4Stories
C1Building Class
R6Zoning
356,820 sfGross Floor Area
490Units
LL97 CoveredRent Stabilized1 Open Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
Over six families without stores · Owner of record: WILLIAMSBURG PACT LLC · 283,200 sf lot · 1.26 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingCivil
Roof7p · 2 filings · 20 docs
Bulkhead2p · 1 filing · 20 docs
Floor 13p · 2 filings · 20 docs
Cellar6p · 4 filings · 20 docs
Basement1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WILLIAMSBURG PACT LLC WAV203/22/2026
NYC HOUSING AUTHORITY1103/22/2026
MDG DESIGN CONTR203/22/2026
NYCHA203/21/2026
NYC HOUSING AUTHROTY303/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CHARIS CONSULTING1203/21/2026
WILLIAM VITACCO ASSOCIATES603/21/2026
DVA Advisors403/21/2026
A1 EXPEDITING SERVICE203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ZONE PLUMBING & HEATING CPlumbing607/08/2026
MDG DESIGN & CONSTR LLCGeneral Contractor507/08/2026
YARKS NYC INCGeneral Contractor407/08/2026
KTB ELECTRIC INC 003305General Contractor203/22/2026
MIGUEL HAMILTONElectrical203/21/2026
A1 EXPEDITING SERVICE CORElectrical103/21/2026
SUTTON, ALEXElectrical103/21/2026
SNS ORGNIZATION LTDGeneral Contractor107/08/2026
KTB ELECTRIC INC.Electrical103/22/2026
TRADELINE PLUMBING INCPlumbing107/08/2026
COLE, VINCENTElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LORJAN AGALLIU ARCHITECT61041311/07/2024
DOMANI INSPECTION SERVICE843101/12/2023
Building Lifecycle
All (106)Filed (14)Permit Issued (12)Signed Off (8)Violation (32)Inspection (4)Objection (6)Special Inspection (30)
03/17/2026
Violation issued (FDNY_NOV, closed)
03/13/2026
Violation issued (ECB, open)
Construction
10/01/2025
Violation issued (ECB, closed)
Boilers
03/18/2025
Signed off — Alteration
Interior renovation to include demo & replacement of existing PL fixtures and kitchen appliances, millwork & windows. Partition removal & construction to meet UFAS requirements. New ADA accessible entrances being provided. Work limited to apt. 1A & 1B.
B08003435-I1
03/17/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
03/13/2025
Signed off — Alteration
Replacement of boilers & associated ducts/piping as shown on drawings. No change in use, egress, or occupancy.
B00479265-I1
01/06/2025
Signed off — Alteration
All plumbing work in tank room associated plumbing piping (Domestic Hot & Cold Valves) install (3) new Turbo Max, (2) HWCP (Hot Water Circulating Pumps), Mixing Valves ( TMV1 & TMV2) & Water submeter. No change in use, egress / occupancy.
B00727256-I1
12/24/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
12/20/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/19/2024
Signed off — Alteration
B00492782-I1
12/19/2024
Signed off — Alteration
B00493479-I1
12/13/2024
Signed off — Alteration
B00492039-I1
12/09/2024
Permit issued — General Construction
B08003435-I1-GC
11/07/2024
Filed — Alteration
B00493479-P2
10/30/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
lorjan agalliu
10/24/2024
Signed off — Alteration
HEAVY DUTY SIDEWALK SHED DURING BLDG ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B00941673-I1
10/17/2024
Permit issued — Boiler Equipment
B00479265-I1-BE
10/15/2024
Filed — Alteration
Interior renovation to include demo & replacement of existing PL fixtures and kitchen appliances, millwork & windows. Partition removal & construction to meet UFAS requirements. New ADA accessible entrances being provided. Work limited to apt. 1A & 1B.
B08003435-P1
09/27/2024
Signed off — Alteration
INSTALLATION OF ACCESSIBLE RAMPS ON EXTERIOR OF BUILDING. THE STRUCTURAL DESIGN WORK DOES NOT CONSTITUTE ADDITION TO THE EXISTING BUILDING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00764981-I1
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/18/2024
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
09/13/2024
Special inspection requirement — Heating Systems
lorjan agalliu
09/13/2024
Special inspection requirement — HVAC-R and service water heating equipment
lorjan agalliu
09/13/2024
Special inspection requirement — HVAC-R and service water heating system controls
lorjan agalliu
09/13/2024
Special inspection requirement — Maintenance information
lorjan agalliu
09/10/2024
Filed — Alteration
Replacement of boilers & associated ducts/piping as shown on drawings. No change in use, egress, or occupancy.
B00479265-P1
08/16/2024
Permit issued — Plumbing
B00493479-I1-PL
05/28/2024
Permit issued — Mechanical Systems
B00492782-I1-MS
05/15/2024
Permit issued — Boiler Equipment
B00479265-I1-BE
03/22/2024
Violation issued (HPD, closed)
C
03/07/2024
Violation issued (HPD, closed)
C
02/15/2024
Permit issued — General Construction
B00492039-I1-GC
02/14/2024
Permit issued — Sidewalk Shed
B00941673-I1-SH
01/22/2024
Permit issued — Plumbing
B00727256-I1-PL
11/24/2023
Special inspection requirement — Final
lorjan agalliu
11/24/2023
Special inspection requirement — Lighting in dwelling units
lorjan agalliu
11/24/2023
Special inspection requirement — Exterior lighting power
lorjan agalliu
11/24/2023
Special inspection requirement — Interior lighting power
lorjan agalliu
11/24/2023
Special inspection requirement — Lighting controls
lorjan agalliu
11/24/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
lorjan agalliu
11/24/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
lorjan agalliu
11/24/2023
Special inspection requirement — Masonry
lorjan agalliu
11/24/2023
Special inspection requirement — Fire-Resistance Rated Construction
lorjan agalliu
11/24/2023
Special inspection requirement — Energy Code Compliance Inspections
lorjan agalliu
11/22/2023
Filed — Alteration
Interior renovation to include demo & replacement of existing PL fixtures and kitchen appliances, millwork & windows. Partition removal & construction to meet UFAS requirements. New ADA accessible entrances being provided. Work limited to apt. 1A & 1B.
B08003435-I1
11/22/2023
Filed — Alteration
B00492039-P2
10/12/2023
Permit issued — Sidewalk Shed
B00941673-I1-SH
10/06/2023
Filed — Alteration
HEAVY DUTY SIDEWALK SHED DURING BLDG ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B00941673-I1
09/08/2023
Violation issued (ECB, closed)
Construction
09/08/2023
Violation issued (ECB, closed)
Construction
08/14/2023
Permit issued — Foundation
B00764981-I1-GC-CX
08/07/2023
Special inspection requirement — Lighting controls
lorjan agalliu
08/07/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
lorjan agalliu
08/07/2023
Special inspection requirement — Masonry
lorjan agalliu
08/07/2023
Special inspection requirement — Energy Code Compliance Inspections
lorjan agalliu
08/07/2023
Special inspection requirement — Final
lorjan agalliu
08/07/2023
Special inspection requirement — Fire-Resistance Rated Construction
lorjan agalliu
08/07/2023
Special inspection requirement — Interior lighting power
lorjan agalliu
Latest 60 of 106 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offMDG DESIGN & CONSTR LLC12/09/2024
DOB NOWBoiler EquipmentSigned-offSTUART N SCHWARTZ10/17/2024
DOB NOWPlumbingSigned-offZONE PLUMBING & HEATING C08/16/2024
DOB NOWMechanical SystemsSigned-offSNS ORGNIZATION LTD05/28/2024
DOB NOWBoiler EquipmentSigned-offSTUART N SCHWARTZ05/15/2024
DOB NOWGeneral ConstructionSigned-offMDG DESIGN & CONSTR LLC02/15/2024
DOB NOWSidewalk ShedSigned-offYARKS NYC INC02/14/2024
DOB NOWPlumbingSigned-offTRADELINE PLUMBING INC01/22/2024
DOB NOWSidewalk ShedSigned-offYARKS NYC INC10/12/2023
DOB NOWFoundationSigned-offMDG DESIGN & CONSTR LLC08/14/2023
DOB NOWBoiler EquipmentSigned-offSTUART N SCHWARTZ05/10/2023
DOB NOWBoiler EquipmentSigned-offSTUART N SCHWARTZ07/06/2022
BISEQISSUEDUTB-UNITED TECHNOLOGY INC12/21/2006
BISEQISSUEDUTB-UNITED TECHNOLOGY INC09/27/2006
BISOTISSUEDUTB-UNITED TECHNOLOGY INC06/13/2006
BISPLISSUEDRAYTONE PLBG SPEC INC03/21/2006
BISFSISSUEDJACK PICCINI, INC03/09/2006
BISFBISSUEDDOUGLAS SIMMONS03/09/2005
BISPLISSUEDNY PLUMBING & SPRINKLER CORP02/15/2005
BISBLISSUEDDOUGLAS SIMMONS02/15/2005
BISFBISSUEDMARIC PLBG & HTG INC05/03/2002
BISFBISSUEDDOUGLAS SIMMONS05/04/1999
BISPLISSUEDNY PLUMBING & SPRINKLER CORP04/30/1999
BISPLISSUEDB.G. NATIONAL PLUMBING & HEATING02/09/1995
BISFBISSUEDB.G. NATIONAL PLUMBING & HEATING02/09/1995
6 projects · most recent 10/29/2025
General Wiring
FiledStatusContractorScope
10/29/2025Permit IssuedKTB ELECTRIC INC.General Wiring
10/29/2025CompleteKTB ELECTRIC INC.General Wiring
10/29/2025CompleteKTB ELECTRIC INC.General Wiring
09/06/2024CompleteDELCO ELECTRICAL CORP.General Wiring
09/06/2024CompleteDELCO ELECTRICAL CORP.General Wiring
10/09/2020CompleteJEMCO ELECT. CONTRS INC—
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
03/17/2025Pass-Final General Construction Non-Directive 14PassView ↗
12/24/2024Pass-Final Boiler Equipment InspectionPassView ↗
12/20/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/18/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 45
DateRequirementInspectorRole
10/30/2024Fire-Resistant Penetrations and Jointslorjan agalliuspecial
09/13/2024Heating Systemslorjan agalliuspecial
09/13/2024HVAC-R and service water heating equipmentlorjan agalliuenergy_progress
09/13/2024HVAC-R and service water heating system controlslorjan agalliuenergy_progress
09/13/2024Maintenance informationlorjan agalliuenergy_progress
11/24/2023Finallorjan agalliuprogress
11/24/2023Lighting in dwelling unitslorjan agalliuenergy_progress
11/24/2023Exterior lighting powerlorjan agalliuenergy_progress
11/24/2023Interior lighting powerlorjan agalliuenergy_progress
11/24/2023Lighting controlslorjan agalliuenergy_progress
11/24/2023Fenestration and door U-factor and product ratingslorjan agalliuenergy_progress
11/24/2023Fire-Resistant Penetrations and Jointslorjan agalliuspecial
11/24/2023Masonrylorjan agalliuspecial
11/24/2023Fire-Resistance Rated Constructionlorjan agalliuprogress
11/24/2023Energy Code Compliance Inspectionslorjan agalliuprogress
08/07/2023Lighting controlslorjan agalliuenergy_progress
08/07/2023Fire-Resistant Penetrations and Jointslorjan agalliuspecial
08/07/2023Masonrylorjan agalliuspecial
08/07/2023Energy Code Compliance Inspectionslorjan agalliuprogress
08/07/2023Finallorjan agalliuprogress
08/07/2023Fire-Resistance Rated Constructionlorjan agalliuprogress
08/07/2023Interior lighting powerlorjan agalliuenergy_progress
08/07/2023Fenestration and door U-factor and product ratingslorjan agalliuenergy_progress
08/07/2023Lighting in dwelling unitslorjan agalliuenergy_progress
08/07/2023Exterior lighting powerlorjan agalliuenergy_progress
Latest 25 of 45.
▾Documents — 100 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch14
08/31/2026B00492782-I1Request digital key ↗
08/31/2026B00493479-I1Request digital key ↗
08/31/2026B00493479-P1Request digital key ↗
Showing 3 of 14 on file for this type
▸Applications & Permits11
▸DOB NOWLPC Approval/Permit11
08/13/2026B00492782-I1Open ↗
08/13/2026B00493479-P2Open ↗
08/13/2026B00493479-P1Open ↗
Showing 3 of 11 on file for this type
▸Seals & Professional Certifications41
▸DOB NOWProgress Inspector Seal & Signature16
08/28/2026B00764981-I1Open ↗
08/28/2026B00479265-I1Open ↗
08/28/2026B00479265-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature14
08/31/2026B00492782-I1Open ↗
08/31/2026B00493479-I1Open ↗
08/31/2026B00493479-P1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
08/28/2026B00764981-I1Open ↗
08/28/2026B00764981-I1Open ↗
08/28/2026B00764981-I1Open ↗
Showing 3 of 11 on file for this type
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/31/2026B00492782-I1Open ↗
08/31/2026B00493479-I1Open ↗
08/31/2026B00492039-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/31/2026B00479265-I1Open ↗
08/31/2026B00479265-P1Open ↗
08/27/2026B00727256-I1Open ↗
▸Energy Compliance3
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026B00492039-I1Open ↗
08/13/2026B00479265-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026B00479265-I1Open ↗
▸Inspections & Test Reports2
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00764981-I1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026B00764981-I1Open ↗
▸Approvals, Objections & Sign-offs19
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter14
08/31/2026B00492782-I1Open ↗
08/31/2026B00493479-I1Open ↗
08/31/2026B00493479-P1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDEP Variance (V5) letter4
08/31/2026B00492782-I1Open ↗
08/31/2026B00493479-I1Open ↗
08/31/2026B00492039-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)1
08/13/2026B00727256-I1Open ↗
▸Other Documents3
▸DOB NOWProof of Historic Building3
08/13/2026B00764981-I1Open ↗
08/13/2026B08003435-P1Open ↗
08/13/2026B08003435-I1Open ↗