BROOKLYN
226 PUTNAM AVENUE
BROOKLYN · BIN 3051847
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
39 Open Violations ▸FDNY Report ↗
Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Roof65p · 4 filings · 20 docs
Bulkhead3p · 2 filings · 20 docs
Penthouse59p · 1 filing · 20 docs
Floor 463p · 1 filing · 20 docs
Floor 363p · 4 filings · 20 docs
Floor 264p · 4 filings · 20 docs
Floor 164p · 3 filings · 20 docs
Cellar65p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
226 PUTNAM7207/08/2026
SAT CONSTRUCTION SERVICES103/22/2026
LOIS HOUSES LLC12303/22/2026
VIOLATION REMOVAL 18203/22/2026
LOIS HOUSE LLC1003/22/2026
C/O EDWARD SMOLKA ESQ 226103/22/2026
LOIS HOWES LLC103/22/2026
LIOS HOUSES LLC103/22/2026
LOUIS HOUSES LLC203/22/2026
LONS HOUSES LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/08/2020$1.2M—Private party → 226 PUTNAM LLC— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMB BUILDING CONSULTING3603/21/2026
ADVANCED BUILDERS SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SAT CONSTRUCTION SERVICESGeneral Contractor1907/08/2026
HP BUILDING MANAGEMENT INGeneral Contractor907/08/2026
VIOLATION REMOVAL 18 INCGeneral Contractor907/08/2026
BRENT PORTERElectrical103/21/2026
DYNAMIC PLBNG & SPRKR CORFire Protection107/08/2026
KISHAN PLUMBING INCPlumbing107/08/2026
DEEP FORMATION INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519906/27/2024
HRF SERVICES CORP56161005/14/2024
AR-TECH ENGINEERING, P.C.6659106/02/2022
Building Lifecycle
All (236)Filed (22)Permit Issued (23)Signed Off (10)Violation (60)Inspection (11)Objection (80)Special Inspection (30)
07/08/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/22/2024
Signed off — Alteration
Propose mechanical scope of work filed in conjunction with DOB NOW Alt CO # B00482243-I1.
B00502414-I1
07/18/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/01/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
07/01/2024
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
07/01/2024
Special inspection requirement — Mechanical Systems
FAHAD FATEH
07/01/2024
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
07/01/2024
Special inspection requirement — Heating Systems
FAHAD FATEH
07/01/2024
Special inspection requirement — Final
FAHAD FATEH
07/01/2024
Special inspection requirement — Maintenance information
FAHAD FATEH
07/01/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
07/01/2024
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
07/01/2024
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
07/01/2024
Special inspection requirement — Shutoff dampers
FAHAD FATEH
06/27/2024
Filed — Alteration
Propose mechanical scope of work filed in conjunction with DOB NOW Alt CO # B00482243-I1.
B00502414-P2
06/26/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
06/26/2024
Special inspection requirement — Maintenance information
Younes Abouyaala
06/26/2024
Special inspection requirement — Final
NAVEEN KUMAR
06/26/2024
Special inspection requirement — Shutoff dampers
Younes Abouyaala
06/26/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
06/26/2024
Special inspection requirement — Heating Systems
Younes Abouyaala
06/26/2024
Special inspection requirement — Mechanical Systems
Younes Abouyaala
06/26/2024
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
06/26/2024
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
06/26/2024
Special inspection requirement — Fire-Resistance Rated Construction
Younes Abouyaala
06/26/2024
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
06/14/2024
Signed off — Alteration CO
Subsequent Filing for Foundation work as part of GC filed in conjunction with DOB NOW Alt CO# B00482243-I1.
B00482243-S4
05/29/2024
Special inspection requirement — Exterior lighting power
FAHAD FATEH
05/29/2024
Special inspection requirement — Metering
FAHAD FATEH
05/29/2024
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
05/29/2024
Special inspection requirement — Air barrier — testing
FAHAD FATEH
05/29/2024
Special inspection requirement — Fenestration areas
FAHAD FATEH
05/29/2024
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
05/29/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
05/29/2024
Special inspection requirement — Lighting controls
FAHAD FATEH
05/28/2024
Objection raised — Other
05/28/2024
Objection resolved — Addressed
05/20/2024
Objection raised — Other
05/20/2024
Objection resolved — Addressed
05/14/2024
Filed — Alteration CO
Subsequent Filing for Foundation work as part of GC filed in conjunction with DOB NOW Alt CO# B00482243-I1.
B00482243-P8
05/13/2024
Signed off — Alteration CO
Subsequent Filing for Foundation work as part of GC filed in conjunction with DOB NOW Alt CO# B00482243-I1.
B00482243-S3
05/13/2024
Signed off — Alteration CO
Subsequent Filing for Foundation work as part of GC filed in conjunction with DOB NOW Alt CO# B00482243-I1.
B00482243-S1
05/08/2024
Signed off — Alteration
Propose Sprinkler scope of work filed in conjunction with DOB NOW Alt CO # B00482243-I1.
B00503109-I1
05/08/2024
Signed off — Alteration
PROVIDE NEW PLUMBING SYSTEM (DOMESTIC WATER SYSTEM, GAS SYSTEM, SANITARY WATER SYSTEM) FOR ENTIRE BUILDING FILED IN CONJUNCTION WITH DOB NOW ALT CO # B00482243-I1.
B00503042-I1
04/09/2024
Signed off — Alteration CO
Subsequent Filing for Foundation work as part of GC filed in conjunction with DOB NOW Alt CO# B00482243-I1.
B00482243-S2
04/09/2024
Permit issued — Foundation
B00482243-S1-FO
04/03/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/29/2024
Violation issued (ECB, closed)
Construction
02/02/2024
Objection resolved — Addressed
01/25/2024
Signed off — Alteration
B00478823-I1
01/22/2024
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
01/18/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/18/2023
Signed off — Alteration
B00870493-I1
12/18/2023
Signed off — Alteration
Filing for temporary supported scaffolding. No change in use, egress or occupancy.
B00884147-I1
12/08/2023
Objection raised — Other
12/04/2023
Filed — Alteration CO
Subsequent Filing for Foundation work as part of GC filed in conjunction with DOB NOW Alt CO# B00482243-I1.
B00482243-P7
11/28/2023
Permit issued — Mechanical Systems
B00502414-I1-MS
11/22/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/17/2023
Permit issued — General Construction
B00482243-I1-GC
11/02/2023
Objection resolved — Addressed
Latest 60 of 236 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFoundationSigned-offSAT CONSTRUCTION SERVICES04/09/2024
DOB NOWMechanical SystemsSigned-offSAT CONSTRUCTION SERVICES11/28/2023
DOB NOWGeneral ConstructionPermit IssuedSAT CONSTRUCTION SERVICES11/17/2023
DOB NOWSprinklersSigned-offCITYWIDE PLBG, HTG &SPRKL08/22/2023
DOB NOWSupported ScaffoldSigned-offSAT CONSTRUCTION SERVICES08/21/2023
DOB NOWPlumbingSigned-offN AND S PLUMBING INC08/08/2023
DOB NOWSidewalk ShedSigned-offDEEP FORMATION INC05/17/2023
DOB NOWGeneral ConstructionPermit IssuedSAT CONSTRUCTION SERVICES05/02/2023
DOB NOWStructuralSigned-offSAT CONSTRUCTION SERVICES03/29/2023
DOB NOWStructuralSigned-offSAT CONSTRUCTION SERVICES03/13/2023
DOB NOWConstruction FenceSigned-offSAT CONSTRUCTION SERVICES03/08/2023
DOB NOWFoundationSigned-offANGELINE PENA-LEVI02/02/2023
DOB NOWFoundationSigned-offANGELINE PENA-LEVI01/25/2023
DOB NOWGeneral ConstructionPermit IssuedANGELINE PENA-LEVI01/25/2023
DOB NOWSupport of ExcavationSigned-offANGELINE PENA-LEVI01/25/2023
DOB NOWGeneral ConstructionPermit IssuedVIOLATION REMOVAL 18 INC01/04/2023
DOB NOWGeneral ConstructionPermit IssuedVIOLATION REMOVAL 18 INC01/04/2023
DOB NOWGeneral ConstructionPermit IssuedANGELINE PENA-LEVI12/28/2022
DOB NOWMechanical SystemsSigned-offANGELINE PENA-LEVI12/22/2022
DOB NOWConstruction FenceSigned-offANGELINE PENA-LEVI12/22/2022
DOB NOWMechanical SystemsSigned-offVIOLATION REMOVAL 18 INC12/01/2022
DOB NOWGeneral ConstructionPermit IssuedVIOLATION REMOVAL 18 INC10/07/2022
DOB NOWConstruction FenceSigned-offVIOLATION REMOVAL 18 INC06/07/2022
4 projects · most recent 05/03/2024
General Wiring
FiledStatusContractorScope
05/03/2024CompleteK.A.B. ELECTRIC CORPGeneral Wiring
04/26/2024CompleteK.A.B. ELECTRIC CORP—
10/24/2022CompleteUL ELECTRICAL CORP.General Wiring
12/17/2021CompleteK.N.C ELECTRIC INC—
1 project · most recent 05/14/2024
Steel Concrete Masonry
FiledStatusContractorScope
05/14/2024Signed-offSAT CONSTRUCTION SERVICESSteel, Concrete, Masonry
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
07/08/2025Pass-Final CND-Occupancy InspectionPassView ↗
07/18/2024Pass-Final CND-Occupancy InspectionPassView ↗
04/03/2024Pass-Final CND-Occupancy InspectionPassView ↗
01/22/2024Pass-Final SP - Up to 3 Requested FloorsPassView ↗
01/18/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/22/2023Pass-Final CND-Occupancy InspectionPassView ↗
10/18/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
09/15/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
09/15/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/11/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/11/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 98
DateRequirementInspectorRole
07/01/2024HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
07/01/2024HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
07/01/2024Shutoff dampersFAHAD FATEHenergy_progress
07/01/2024Maintenance informationFAHAD FATEHenergy_progress
07/01/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
07/01/2024Mechanical SystemsFAHAD FATEHspecial
07/01/2024Heating SystemsFAHAD FATEHspecial
07/01/2024Energy Code Compliance InspectionsFAHAD FATEHprogress
07/01/2024Fire-Resistance Rated ConstructionFAHAD FATEHprogress
07/01/2024FinalFAHAD FATEHprogress
07/01/2024HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
06/26/2024HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
06/26/2024Energy Code Compliance InspectionsYounes Abouyaalaprogress
06/26/2024Mechanical SystemsYounes Abouyaalaspecial
06/26/2024Heating SystemsYounes Abouyaalaspecial
06/26/2024Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
06/26/2024HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
06/26/2024HVAC-R and service water heating system controlsYounes Abouyaalaenergy_progress
06/26/2024Shutoff dampersYounes Abouyaalaenergy_progress
06/26/2024Maintenance informationYounes Abouyaalaenergy_progress
06/26/2024Fire-Resistance Rated ConstructionYounes Abouyaalaprogress
06/26/2024FinalNAVEEN KUMARprogress
05/29/2024Maintenance informationFAHAD FATEHenergy_progress
05/29/2024Lighting controlsFAHAD FATEHenergy_progress
05/29/2024Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
Latest 25 of 98.
▾Documents — 167 on file (BIS + DOB NOW)
▸Plans & Drawings22
▸DOB NOWPlans/Sketch22
09/01/2026B00478823-I1Request digital key ↗
09/01/2026B00502414-P2Request digital key ↗
08/28/2026B00503109-P2Request digital key ↗
Showing 3 of 22 on file for this type
▸Applications & Permits8
▸BISPLAN / WORK APPROVAL APPLICATION7
10/16/2024322119426Open ↗
10/11/2024322119426Open ↗
01/23/2024340811526Open ↗
Showing 3 of 7 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
05/20/2021340811526Open ↗
▸Zoning, Tax Lot & Property Records9
▸DOB NOWZD1: DOB Zoning Diagram4
08/15/2026B00482243-I1Open ↗
08/15/2026B00482243-P7Open ↗
08/14/2026B00482243-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZoning Exhibit form (1-5)4
08/15/2026B00482243-I1Open ↗
08/15/2026B00482243-P7Open ↗
08/14/2026B00482243-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00482243-I1Open ↗
▸Seals & Professional Certifications61
▸DOB NOWDPL-1: Design Professional Seal & Signature22
09/01/2026B00478823-I1Open ↗
08/27/2026B00482243-P2Open ↗
08/27/2026B00482243-I1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature19
09/01/2026B00482243-S4Open ↗
08/31/2026B00502414-I1Open ↗
08/29/2026B00482243-I1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWProgress Inspector Seal & Signature18
09/01/2026B00482243-S4Open ↗
08/31/2026B00502414-I1Open ↗
08/31/2026B00502414-I1Open ↗
Showing 3 of 18 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
05/20/2021340811526Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
05/20/2021340811526Open ↗
▸Trade Schedules & Equipment5
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)5
08/15/2026B00482243-I1Open ↗
08/15/2026B00482243-P7Open ↗
08/14/2026B00482243-P1Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection11
▸DOB NOWStreet Tree Checklist4
08/15/2026B00482243-I1Open ↗
08/15/2026B00482243-P7Open ↗
08/14/2026B00482243-P1Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREES SITE PLAN1
07/13/2021340811526Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
06/03/2021340811526Open ↗
▸BISBPP: STREET TREES SITE PLAN1
07/09/2021340811526Open ↗
▸BISSTREET TREE CHECKLIST1
05/20/2021340811526Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00482243-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B00482243-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B00482243-I1Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form8
08/13/2026B00482243-S4Open ↗
08/13/2026B00482243-I1Open ↗
08/13/2026B00503109-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWACP5/20/21 or V51
08/13/2026B00503042-I1Open ↗
▸Energy Compliance3
▸DOB NOWEN2: As Built Energy Analysis.3
08/13/2026B00502414-I1Open ↗
08/13/2026B00482243-I1Open ↗
08/13/2026B00503042-I1Open ↗
▸Inspections & Test Reports5
▸DOB NOWSOIL REPORT3
08/27/2026B00482243-S1Open ↗
08/27/2026B00482243-P2Open ↗
08/13/2026B00482243-P5Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00482243-S1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026B00482243-S1Open ↗
▸Cost, Insurance & Ownership2
▸DOB NOWCertificate of Insurance1
08/13/2026B00482243-I1Open ↗
▸DOB NOWCertification by Insurance Broker or Agency1
08/13/2026B00482243-I1Open ↗
▸Filing & Intake Forms4
▸BISEFILING JOB APPLICATION COVER SHEET1
05/20/2021340811526Open ↗
▸BISADDITIONAL INFORMATION1
07/09/2021340811526Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
05/20/2021340811526Open ↗
▸BISEFILING COVER SHEET1
10/11/2024322119426Open ↗
▸Other Documents28
▸DOB NOWPlot Diagram10
08/27/2026B00482243-S1Open ↗
08/27/2026B00482243-S2Open ↗
08/27/2026B00482243-P2Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProperty Ownership Certification8
08/27/2026B00482243-S2Open ↗
08/27/2026B00482243-S1Open ↗
08/27/2026B00482243-P2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/15/2026B00482243-I1Open ↗
08/15/2026B00482243-P7Open ↗
08/14/2026B00482243-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSite Survey: Initial3
08/15/2026B00482243-I1Open ↗
08/15/2026B00482243-P7Open ↗
08/13/2026B00482243-P8Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00482243-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00482243-S2Open ↗
▸DOB NOWAdditional Insured Authorizations1
08/13/2026B00482243-I1Open ↗