← Back
BuildNYC
Elevator apt, miscellaneous
Sumet I
226 SOUTH 1ST STREET · BIN 3063001
💬 Discuss this project
1912Year Built
6Stories
D9Building Class
R6Zoning
23,400 sfGross Floor Area
21Units
Rent Stabilized0 Active Violations 1 old, status unconfirmed ▸FISP: SWARMPFDNY Report ↗
Elevator apt, miscellaneous · Owner of record: Sumet I Associates · 5,000 sf lot · 4.68 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofMetropolitan Realty GroupUnder Construction2p · 2 filings · 20 docs
BulkheadSuspended scaffold for facade workUnder Construction1p · 1 filing · 3 docs
Floor 61p · 1 filing · 4 docs
Floor 51p · 1 filing · 4 docs
Floor 41p · 1 filing · 4 docs
Floor 31p · 1 filing · 4 docs
Floor 2Unit 2A, Unit 2B, Unit 2C +11p · 1 filing · 4 docs
Floor 1Unit 1A1p · 1 filing · 4 docs
Site & exteriorMetropolitan Realty GroupUnder Construction7p · 2 filings · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Sumet I Associates1003/22/2026
Metropolitan Realty Group707/08/2026
Penn Gardens Associates203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Always Fast Services108/14/2026
Pve Associates107/30/2026
Pacifico Engineering212/24/2025
EDG102/17/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LMS-Ace Services103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Absolute Electrical ContgElectrical103/21/2026
Best Energy Power 2015General Contractor104/09/2026
Lawrence Exterior Restorationspecialty_contractor108/06/2026
Real Deal DecorationGeneral Contractor107/08/2026
Andamio ScaffoldingScaffold108/16/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Partridge Venture Engineering7690107/30/2026
Pacifico Engineering3157212/24/2025
Building Lifecycle
All (97)Filed (6)Permit Issued (5)Signed Off (2)Facade (FISP) (9)Violation (60)Special Inspection (15)
08/14/2026
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B01442083-I1
08/14/2026
Permit issued — Sidewalk Shed
B01442083-I1-SH
08/05/2026
Permit issued — General Construction
B01421933-I1-GC
08/03/2026
Permit issued — Suspended Scaffold
B01436102-I1-SC
07/30/2026
Filed — Alteration
PROPOSED EXTERIOR FACADE RESTORATION AS PER PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01421933-I1
07/24/2026
Filed — Alteration
Installation of suspended scaffold for facade work or inspection.
B01436102-I1
07/15/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
ALAN DUDLEY
07/15/2026
Special inspection requirement — Masonry
ALAN DUDLEY
07/15/2026
Special inspection requirement — Post-installed Anchors
ALAN DUDLEY
06/24/2026
Special inspection requirement — Tenant Protection Plan Compliance
ALAN DUDLEY
06/24/2026
Special inspection requirement — Final
Marco Batista
06/24/2026
Special inspection requirement — Energy Code Compliance Inspections
Marco Batista
06/24/2026
Special inspection requirement — Air barrier - visual inspection
Marco Batista
01/12/2026
Signed off — Alteration
Installation of roof mounted solar panels. No change in use, egress, or occupancy
B01212489-I1
12/29/2025
Special inspection requirement — Air barrier - visual inspection
Ralph Pacifico
12/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ralph Pacifico
12/29/2025
Special inspection requirement — Final
Ralph Pacifico
12/29/2025
Special inspection requirement — Energy Code Compliance Inspections
Ralph Pacifico
12/24/2025
Filed — Alteration
Installation of roof mounted solar panels. No change in use, egress, or occupancy
B01212489-P1
12/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ralph Pacifico
12/23/2025
Special inspection requirement — Energy Code Compliance Inspections
Ralph Pacifico
12/23/2025
Special inspection requirement — Final
Ralph Pacifico
12/23/2025
Special inspection requirement — Air barrier - visual inspection
Ralph Pacifico
10/21/2025
Violation issued (HPD, closed)
B
10/21/2025
Violation issued (HPD, closed)
B
06/13/2025
Permit issued — Solar
B01212489-I1-SL
06/06/2025
Filed — Alteration
Installation of roof mounted solar panels. No change in use, egress, or occupancy
B01212489-I1
06/03/2024
Violation issued (FDNY_NOV, closed)
07/27/2023
Cycle 9 facade report signed — SWARMP
02/22/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/21/2023
Cycle 9 facade report submitted
02/13/2023
Cycle 9 facade inspection completed
10/04/2022
Signed off — Alteration
B00468294-I1
11/29/2021
Violation issued (HPD, closed)
A
11/29/2021
Violation issued (HPD, closed)
A
11/29/2021
Violation issued (HPD, closed)
A
11/29/2021
Violation issued (HPD, closed)
A
11/29/2021
Violation issued (HPD, closed)
A
11/29/2021
Violation issued (HPD, closed)
B
11/29/2021
Violation issued (HPD, closed)
B
11/29/2021
Violation issued (HPD, closed)
B
11/29/2021
Violation issued (HPD, closed)
A
11/29/2021
Violation issued (HPD, closed)
A
11/18/2021
Violation issued (HPD, closed)
C
11/18/2021
Violation issued (HPD, closed)
A
11/18/2021
Violation issued (HPD, closed)
A
11/18/2021
Violation issued (HPD, closed)
A
11/18/2021
Violation issued (HPD, closed)
A
11/18/2021
Violation issued (HPD, closed)
A
11/18/2021
Violation issued (HPD, closed)
A
11/18/2021
Violation issued (HPD, closed)
A
04/13/2021
Violation issued (HPD, closed)
A
03/15/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/05/2021
Permit issued — General Construction
B00468294-I1-GC
02/17/2021
Filed — Alteration
B00468294-I1
09/08/2020
Violation issued (ECB, closed)
Boilers
02/28/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/17/2019
Cycle 8 facade report submitted
10/14/2019
Cycle 8 facade report signed — SAFE
10/10/2019
Violation issued (ECB, closed)
Construction
Latest 60 of 97 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedAndamio Scaffolding08/14/2026
DOB NOWGeneral ConstructionPermit IssuedLawrence Exterior Restoration08/05/2026
DOB NOWSuspended ScaffoldPermit IssuedLawrence Exterior Rest Co08/03/2026
DOB NOWSolarSigned-offBest Energy Power 201506/13/2025
DOB NOWGeneral ConstructionSigned-offWise Construction Safety03/05/2021
BISOTISSUEDKings Bay Construction*03/06/2020
BISEQISSUEDRepublic Scaffold & Hoist10/25/2019
BISOTISSUEDLawrence Exterior Restoration02/26/2019
BISOTISSUEDLawrence Exterior Restoration01/14/2019
BISOTISSUEDLawrence Exterior Restoration07/19/2018
BISEQISSUEDRepublic Scaffold & Hoist06/11/2018
BISEQISSUEDRepublic Scaffold & Hoist06/16/2017
BISFSISSUEDEast Coast Petroleum04/29/2011
BISOTISSUEDTremco Contracting10/14/2010
BISEQISSUEDRock Scaffolding10/13/2010
BISFSISSUEDEast Coast Petroleum07/17/2009
BISPLISSUEDEast Coast Mechanical07/17/2009
BISPLISSUEDWasoff Plumbing & Utility Co11/02/2005
BISFBISSUEDA-C Combustion Service12/30/1996
3 projects · most recent 08/13/2026
General Wiring
FiledStatusContractorScope
08/13/2026Permit IssuedBorowide Elect'l Contractors—
08/14/2025CompleteBerger Quality Electrical Con—
06/18/2021Permit IssuedTop Tier ElectricGeneral Wiring
1 project · most recent 08/14/2026
Sidewalk Shed
FiledStatusContractorScope
08/14/2026Permit IssuedAndamio ScaffoldingSidewalk Shed
1 project · most recent 07/24/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
07/24/2026Permit IssuedLawrence Exterior Rest CoSuspended Scaffold (SC)
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
07/15/2026Structural Stability – Alterations of existing buildingsALAN DUDLEYspecial
07/15/2026MasonryALAN DUDLEYspecial
07/15/2026Post-installed AnchorsALAN DUDLEYspecial
06/24/2026Tenant Protection Plan ComplianceALAN DUDLEYspecial
06/24/2026FinalMarco Batistaprogress
06/24/2026Energy Code Compliance InspectionsMarco Batistaprogress
06/24/2026Air barrier - visual inspectionMarco Batistaenergy_progress
12/29/2025Air barrier - visual inspectionRalph Pacificoenergy_progress
12/29/2025Fire-Resistant Penetrations and JointsRalph Pacificospecial
12/29/2025FinalRalph Pacificoprogress
12/29/2025Energy Code Compliance InspectionsRalph Pacificoprogress
12/23/2025Fire-Resistant Penetrations and JointsRalph Pacificospecial
12/23/2025Energy Code Compliance InspectionsRalph Pacificoprogress
12/23/2025FinalRalph Pacificoprogress
12/23/2025Air barrier - visual inspectionRalph Pacificoenergy_progress
▾Documents — 140 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch5
08/21/2026B01212489-P1Request digital key ↗
08/21/2026B01212489-I1Request digital key ↗
08/16/2026B01436102-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - General Construction1
09/01/2026B00468294-I1Request digital key ↗
▸Applications & Permits28
▸BISPLAN / WORK APPROVAL APPLICATION14
08/30/2024320223922Open ↗
08/26/2024320223922Open ↗
08/23/2024302023272Open ↗
Showing 3 of 14 on file for this type
▸BISWORK PERMIT APPLICATION13
03/06/2020340715015Open ↗
10/29/2019321606188Open ↗
07/19/2018340525881Open ↗
Showing 3 of 13 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
08/22/2024302023272Open ↗
▸Seals & Professional Certifications38
▸DOB NOWProgress Inspector Seal & Signature7
09/02/2026B01212489-I1Open ↗
09/02/2026B01212489-I1Open ↗
08/26/2026B01421933-I1Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
09/13/2019340525881Open ↗
06/19/2017321606188Open ↗
10/08/2010320223913Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/02/2026B01212489-I1Open ↗
08/26/2026B01421933-I1Open ↗
08/26/2026B01421933-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
09/01/2026B00468294-I1Open ↗
08/21/2026B01212489-I1Open ↗
08/21/2026B01212489-P1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
06/19/2017321606188Open ↗
10/08/2010320223922Open ↗
10/08/2010320223913Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
02/04/2020340715015Open ↗
07/24/2017340525881Open ↗
06/19/2017321606188Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
10/08/2010320223922Open ↗
10/08/2010320223913Open ↗
07/17/2009320047757Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
02/04/2020340715015Open ↗
07/24/2017340525881Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
02/04/2020340715015Open ↗
07/24/2017340525881Open ↗
▸Trade Schedules & Equipment4
▸BISSELF-CERT PLUMBING NOTICE2
12/10/2011320047757Open ↗
12/06/2011320047757Open ↗
▸BISSCHEDULE B - PLUMBING1
07/17/2009320047757Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
07/17/2009320047757Open ↗
▸Safety & Tenant Protection3
▸BISTENANT PROTECTION PLAN AND NOTES3
02/04/2020340715015Open ↗
07/24/2017340525881Open ↗
06/19/2017321606188Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
09/01/2026B00468294-I1Open ↗
08/21/2026B01212489-P1Open ↗
08/21/2026B01212489-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
10/08/2010320223922Open ↗
07/17/2009320047757Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
02/04/2020340715015Open ↗
07/24/2017340525881Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
10/08/2010320223913Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
02/05/2024340715015Open ↗
02/04/2020340715015Open ↗
07/24/2017340525881Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
02/05/2024340715015Open ↗
09/13/2019340525881Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
02/04/2020340715015Open ↗
07/24/2017340525881Open ↗
▸BISNYCECC ANALYSIS2
02/04/2020340715015Open ↗
07/24/2017340525881Open ↗
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: RESPONSIBILITY5
09/06/2024320223922Open ↗
02/05/2024340715015Open ↗
03/06/2020340715015Open ↗
Showing 3 of 5 on file for this type
▸BISNOTIF-PROPOSED STEAM-HOT WATER INSPECTION2
12/06/2011320047757Open ↗
12/14/2011320047757Open ↗
▸Approvals, Objections & Sign-offs15
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST7
09/09/2024320223922Open ↗
08/22/2024302023272Open ↗
08/21/2024320223913Open ↗
Showing 3 of 7 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
10/08/2010320223922Open ↗
10/08/2010320223913Open ↗
07/17/2009320047757Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter2
09/01/2026B00468294-I1Open ↗
08/16/2026B01442083-I1Open ↗
▸BISFINAL1
07/17/2024320047757Open ↗
▸BISSHED LETTER1
07/12/2018321606188Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026B01212489-I1Open ↗
▸Cost, Insurance & Ownership11
▸BISCOST AFFIDAVIT8
08/21/2024302023272Open ↗
08/21/2024302023272Open ↗
02/05/2024340715015Open ↗
Showing 3 of 8 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
09/06/2024320223922Open ↗
07/31/2024302023272Open ↗
07/15/2024320047757Open ↗
▸Filing & Intake Forms7
▸BISEFILING COVER SHEET4
06/19/2017321606188Open ↗
10/08/2010320223922Open ↗
10/08/2010320223913Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
02/04/2020340715015Open ↗
07/24/2017340525881Open ↗
▸BISBOROUGH INTAKE FORM1
09/13/2019340525881Open ↗
▸Other Documents3
▸BISFUEL-OIL STORAGE AND FUEL-OIL PIPING SYSTEMS1
07/15/2024320047757Open ↗
▸DOB NOWCalculations1
08/16/2026B01436102-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/16/2026B01436102-I1Open ↗