← Back
Two family converted from one family
226 WASHINGTON AVENUE
BROOKLYN · Clinton Hill · BIN 3054835
💬 Discuss this project
1868Year Built
3Stories
B3Building Class
R6BZoning
3,488 sfGross Floor Area
2Units
6 Open Violations ▸FDNY Report ↗
Two family converted from one family · 2,175 sf lot · 1.6 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PIRO STUDIO LLC405/25/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DI DIO ARCHITECTURE, PC603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HELLO CHAPTER LLCGeneral Contractor204/09/2026
INNOVATIVE HEATING SOLUTIPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PIRO STUDIO LLC7503305/25/2026
J. MEDINA ENGINEERING LLC7034110/31/2025
Building Lifecycle
All (27)Filed (4)Permit Issued (3)Violation (8)Inspection (2)Special Inspection (10)
06/24/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/24/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
PIETRO ROSATO
05/25/2026
Filed — Alteration
General renovation of the Cellar and 1st floor apartment, including partition exterior door modification, plumbing and and finish changes. No change in use, occupancy or egress.
B01224794-P1
05/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
PIETRO ROSATO
12/10/2025
Permit issued — Structural
B01224794-S2-ST
11/21/2025
Permit issued — Plumbing
B01224794-S1-PL
11/19/2025
Permit issued — General Construction
B01224794-I1-GC
10/31/2025
Filed — Alteration
General renovation of the Cellar and 1st floor apartment, including partition exterior door modification, plumbing and and finish changes. No change in use, occupancy or egress.
B01224794-S2
10/29/2025
Special inspection requirement — Post-installed Anchors
Jarib Medina
10/29/2025
Special inspection requirement — Structural Cold-Formed Steel
Jarib Medina
10/29/2025
Special inspection requirement — Structural Steel - High Strength Bolting
Jarib Medina
10/29/2025
Special inspection requirement — Structural Steel - Welding
Jarib Medina
10/29/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Jarib Medina
10/29/2025
Special inspection requirement — Structural Steel - Details
Jarib Medina
10/29/2025
Special inspection requirement — Concrete - Cast-In-Place
Jarib Medina
10/01/2025
Filed — Alteration
General renovation of the Cellar and 1st floor apartment, including partition exterior door modification, plumbing and and finish changes. No change in use, occupancy or egress.
B01224794-S1
10/01/2025
Filed — Alteration
General renovation of the Cellar and 1st floor apartment, including partition exterior door modification, plumbing and and finish changes. No change in use, occupancy or egress.
B01224794-I1
07/14/2025
Special inspection requirement — Final
Jarib Medina
12/09/2005
Violation issued (HPD, open)
A
12/09/2005
Violation issued (HPD, open)
B
12/09/2005
Violation issued (HPD, open)
C
12/09/2005
Violation issued (HPD, open)
A
12/09/2005
Violation issued (HPD, open)
B
12/09/2005
Violation issued (HPD, open)
B
10/14/1988
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/14/1988
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedHELLO CHAPTER LLC12/10/2025
DOB NOWPlumbingPermit IssuedMITIE PLUMBING & HTG CORP11/21/2025
DOB NOWGeneral ConstructionPermit IssuedHELLO CHAPTER LLC11/19/2025
BISOTISSUEDDINEEN CONSTRUCTION CORP08/31/2009
BISMHISSUEDDINEEN CONSTRUCTION CORP08/31/2009
BISOTISSUEDDINEEN CONSTRUCTION CORP04/01/2005
BISMHISSUEDDINEEN CONSTRUCTION CORP04/01/2005
BISOTISSUEDDINEEN CONSTRUCTION CORP04/01/2005
BISPLISSUEDDONATO INC.03/18/2005
BISOTISSUEDDINEEN CONSTRUCTION CORP01/03/2005
BISOTISSUEDDINEEN CONSTRUCTION CORP01/03/2005
BISMHISSUEDDINEEN CONSTRUCTION CORP01/03/2005
1 project · most recent 05/25/2026
Gas Water/Sanitary
FiledStatusContractorScope
05/25/2026Permit IssuedINNOVATIVE HEATING SOLUTIGas, Water/Sanitary
1 project · most recent 02/19/2026
General Wiring
FiledStatusContractorScope
02/19/2026Permit Issued2AK LIGHT ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
06/24/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/24/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
06/01/2026Fire-Resistant Penetrations and JointsPIETRO ROSATOspecial
05/22/2026Fire-Resistant Penetrations and JointsPIETRO ROSATOspecial
10/29/2025Post-installed AnchorsJarib Medinaspecial
10/29/2025Structural Cold-Formed SteelJarib Medinaspecial
10/29/2025Structural Steel - High Strength BoltingJarib Medinaspecial
10/29/2025Structural Steel - WeldingJarib Medinaspecial
10/29/2025Structural Stability – Alterations of existing buildingsJarib Medinaspecial
10/29/2025Structural Steel - DetailsJarib Medinaspecial
10/29/2025Concrete - Cast-In-PlaceJarib Medinaspecial
07/14/2025FinalJarib Medinaprogress
▾Documents — 26 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/20/2026B01224794-S1Request digital key ↗
08/20/2026B01224794-I1Request digital key ↗
08/20/2026B01224794-S2Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits4
▸DOB NOWLPC Approval/Permit4
08/20/2026B01224794-P1Open ↗
08/13/2026B01224794-I1Open ↗
08/13/2026B01224794-S1Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications14
▸DOB NOWSpecial Inspector Seal & Signature9
09/02/2026B01224794-P1Open ↗
08/28/2026B01224794-S2Open ↗
08/28/2026B01224794-S2Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/20/2026B01224794-P1Open ↗
08/13/2026B01224794-S2Open ↗
08/13/2026B01224794-S1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature1
08/28/2026B01224794-S2Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/20/2026B01224794-P1Open ↗
08/13/2026B01224794-S1Open ↗
08/13/2026B01224794-S2Open ↗
Showing 3 of 4 on file for this type