← Back
Office with commercial, 7-19 stories
226 WEST 26 STREET
MANHATTAN · Chelsea-Hudson Yards · BIN 1080535
💬 Discuss this project
1928Year Built
10Stories
O6Building Class
C6-2AZoning
103,873 sfGross Floor Area
12Units
LL97 Covered37 Open Violations ▸FISP: SAFEFDNY Report ↗
Office with commercial, 7-19 stories · Owner of record: 226 WEST 26TH STREET, . · 11,113 sf lot · 9.35 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Floor 530p · 3 filings · 20 docs
Floor 4
Floor 3
Floor 2
Floor 1
Site & exterior7p · 3 filings · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
226 WEST 26TH STREET3003/22/2026
226 WEST 26 ST1703/22/2026
DINO SONS REALTY903/21/2026
2558 EAST 18TH STREET103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOEL PHAGOO P.E. PLLC103/22/2023
PHILIP TOSCANO ARCHITECTS108/23/2022
ENTHINK ENGINEERS LLC104/11/2022
RYAN SOAMES ENGINEERING704/20/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GILLMAN CONSULTING1403/21/2026
A1 EXPEDITING SERVICE203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TORRES, HECTORElectrical403/21/2026
BEVILACQUA, JOSEPHElectrical403/21/2026
KNS BUILDING REST. INCGeneral Contractor307/08/2026
PHOENIX SUTTON STR INCGeneral Contractor307/08/2026
NYC PLUMBING & HEATING INFire Protection107/08/2026
EMPIRE TRANSIT MIX INCGeneral Contractor107/08/2026
NYC PLUMBING & HEATING INPlumbing107/08/2026
ELPO ELECTRICAL CONTG INCElectrical103/22/2026
HEMANCHAL DEONARINEElectrical103/21/2026
MICHAEL MINIEROElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JOEL PHAGOO ,PE, PLLC2416103/22/2023
CATALDO ENGINEERING, P.C.2174108/23/2022
AK ENGINEERING PC678404/20/2021
Building Lifecycle
All (107)Filed (10)Permit Issued (8)Signed Off (5)Facade (FISP) (12)Violation (60)Inspection (1)Special Inspection (11)
09/19/2025
Violation issued (FDNY_ORDER, closed)
09/19/2025
Violation issued (FDNY_NOV, closed)
12/19/2024
Violation issued (FDNY_NOV, closed)
12/10/2024
Violation issued (FDNY_ORDER, closed)
09/04/2024
Violation issued (FDNY_NOV, closed)
02/20/2024
Signed off — Alteration
MISCELLANEOUS MASONRY FACADE REPAIRS. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M00760555-I1
02/20/2024
Cycle 9 facade report submitted
02/20/2024
Cycle 9 facade report signed — SAFE
02/15/2024
Cycle 9 facade inspection completed
02/05/2024
Violation issued (FDNY_NOV, closed)
09/06/2023
Violation issued (FDNY_NOV, closed)
06/07/2023
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00716490-I1
04/22/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/07/2023
Permit issued — Sidewalk Shed
M00716490-I1-SH
03/30/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/24/2023
Violation issued (FDNY_NOV, closed)
03/24/2023
Violation issued (FDNY_ORDER, closed)
03/22/2023
Filed — Alteration
M00843177-I1
03/22/2023
Permit issued — Supported Scaffold
M00843177-I1-SF
01/30/2023
Permit issued — General Construction
M00760555-I1-GC
12/16/2022
Violation issued (ECB, closed)
Local Law
10/01/2022
Permit issued — General Construction
M00760555-I1-GC
08/23/2022
Filed — Alteration
MISCELLANEOUS MASONRY FACADE REPAIRS. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M00760555-I1
08/21/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/16/2022
Special inspection requirement — Masonry
Thomas Cataldo
08/15/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Thomas Cataldo
06/20/2022
Special inspection requirement — Final
CHRISTINA TOSCANO
06/02/2022
Violation issued (FDNY_NOV, closed)
04/11/2022
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00716490-I1
04/11/2022
Permit issued — Sidewalk Shed
M00716490-I1-SH
03/30/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/23/2022
Violation issued (ECB, closed)
Construction
03/23/2022
Violation issued (ECB, closed)
Construction
02/22/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/16/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/27/2021
Violation issued (ECB, closed)
Construction
12/17/2021
Violation issued (ECB, closed)
Construction
11/18/2021
Violation issued (ECB, closed)
Construction
11/18/2021
Violation issued (ECB, closed)
Construction
06/20/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/29/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/27/2021
Signed off — Alteration
Modification to HVAC system as shown on drawings filed herewith. No change in use, egress or occupancy.
M00228186-I1
04/20/2021
Filed — Alteration
Modification to HVAC system as shown on drawings filed herewith. No change in use, egress or occupancy.
M00228186-P1
03/22/2021
Violation issued (FDNY_NOV, closed)
02/02/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/10/2020
Special inspection requirement — HVAC and service water heating equipment
Ari Kamo
11/10/2020
Special inspection requirement — HVAC and service water heating system controls
Ari Kamo
11/10/2020
Special inspection requirement — Maintenance information
Ari Kamo
11/10/2020
Special inspection requirement — HVAC insulation and sealing
Ari Kamo
11/10/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ari Kamo
11/10/2020
Special inspection requirement — Mechanical Systems
Ari Kamo
11/10/2020
Special inspection requirement — Final
Ari Kamo
11/02/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/08/2020
Signed off — Alteration
Install new plumbing fixtures and related piping as shown on drawings filed herewith. No change in use, egress or occupancy.
M00227845-I1
10/08/2020
Signed off — Alteration
Modification to the sprinkler system as shown on drawings filed herewith. No change in use, egress or occupancy.
M00227822-I1
08/02/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/29/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/02/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/24/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/12/2020
Filed — Alteration
Install new plumbing fixtures and related piping as shown on drawings filed herewith. No change in use, egress or occupancy.
M00227845-P2
Latest 60 of 107 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC04/07/2023
DOB NOWSupported ScaffoldPermit IssuedKNS BUILDING REST03/22/2023
DOB NOWGeneral ConstructionSigned-offKNS BUILDING REST01/30/2023
DOB NOWGeneral ConstructionSigned-offKNS BUILDING REST10/01/2022
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC04/11/2022
DOB NOWMechanical SystemsSigned-offEMPIRE TRANSIT MIX INC10/30/2019
DOB NOWSprinklersSigned-offNYC PLUMBING & HEATING IN10/17/2019
DOB NOWPlumbingSigned-offNYC PLUMBING & HEATING IN10/11/2019
BISPLISSUEDRRP PLUMBING CORP05/21/2019
BISOTISSUEDEMPIRE TRANSIT MIX INC04/26/2019
BISMHISSUEDEMPIRE TRANSIT MIX INC04/26/2019
BISSPISSUEDVIP FIRE SPRINKLER INC04/26/2019
BISOTISSUEDEMPIRE TRANSIT MIX INC01/29/2019
BISMHISSUEDALL MOBILE VIDEO INC10/16/2018
BISOTISSUEDM&A SCRAP METAL CORP08/28/2018
BISOTISSUEDPHASE 3 INTERIORS LLC05/11/2018
BISOTISSUEDKNS BUILDING REST. INC02/05/2014
BISEQISSUEDADVANCED CONSTRUCTION EQUIPMENT11/06/2013
BISOTISSUEDKNS BUILDING REST. INC06/27/2013
BISMHISSUEDEMPIRE TRANSIT MIX INC03/28/2013
BISEQISSUEDADVANCED CONSTRUCTION EQUIPMENT11/07/2012
BISEQISSUEDADVANCED CONSTRUCTION EQUIPMENT09/26/2012
BIS—ISSUED226 WEST 26TH STREET, LLC07/25/2012
BISPLISSUEDJB BUZCO PLUMBING LLC07/10/2012
BISSPISSUEDRIGHTWAY PLBG & HTG INC07/10/2012
BISOTISSUEDHAILEY DEVELOPMENT GROUP06/18/2012
BISOTISSUEDHAILEY DEVELOPMENT GROUP06/11/2012
BISMHISSUEDEMPIRE TRANSIT MIX INC03/08/2012
BISPLISSUEDFLYTIGER P & H LTD03/06/2012
BISOTISSUEDEMPIRE TRANSIT MIX INC02/23/2012
BISBLISSUEDSTEPHEN BRAUN08/27/2009
BIS—ISSUEDEMPIRE TRANSIT MIX INC12/27/2007
BISEQISSUEDADVANCED INSTALLATIONS INC.01/13/2006
BISOTISSUEDKNS BUILDING REST. INC10/21/2005
BISEQISSUEDADVANCED INSTALLATIONS, INC.08/19/2005
BISMHISSUEDLAQUILA CONSTRUCTION10/30/1996
BIS—ISSUEDLAQUILA CONSTRUCTION INC08/02/1996
BISPLISSUEDMINLAND PLG & HTG CO08/02/1996
BIS—ISSUEDMAUCER SIGN CO INC03/17/1995
BISMHISSUEDLAOUILA CONST INC12/05/1994
+ 4 more permits on file
3 projects · most recent 04/22/2024
General Wiring
FiledStatusContractorScope
04/22/2024CompleteASSET ELECTRIC CORP—
04/07/2022CompleteELPO ELECTRICAL CONTG INC—
02/16/2020CompleteFIRST STAR ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
03/30/2023Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
08/16/2022MasonryThomas Cataldospecial
08/15/2022Structural Stability – Alterations of existing buildingsThomas Cataldospecial
06/20/2022FinalCHRISTINA TOSCANOprogress
11/10/2020HVAC and service water heating equipment Ari Kamoenergy_progress
11/10/2020HVAC and service water heating system controls Ari Kamoenergy_progress
11/10/2020Maintenance informationAri Kamoenergy_progress
11/10/2020HVAC insulation and sealing Ari Kamoenergy_progress
11/10/2020Fire-Resistant Penetrations and JointsAri Kamospecial
11/10/2020Mechanical SystemsAri Kamospecial
11/10/2020FinalAri Kamoprogress
02/05/2020Sprinkler SystemsAri Kamospecial
▾Documents — 330 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch3
09/02/2026M00716490-I1Request digital key ↗
09/02/2026M00760555-I1Request digital key ↗
08/31/2026M00843177-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing3
09/05/2026M00227845-I1Request digital key ↗
08/15/2026M00227845-P2Request digital key ↗
08/15/2026M00227845-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler2
09/05/2026M00227822-I1Request digital key ↗
08/15/2026M00227822-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/03/2026M00228186-I1Request digital key ↗
09/03/2026M00228186-P1Request digital key ↗
▸Applications & Permits54
▸BISWORK PERMIT APPLICATION28
09/30/2019123713945Open ↗
05/21/2019123862310Open ↗
04/29/2019123862310Open ↗
Showing 3 of 28 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION25
09/23/2019123713945Open ↗
04/03/2019123862310Open ↗
04/03/2019123862310Open ↗
Showing 3 of 25 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
08/24/2012121125120Open ↗
▸Seals & Professional Certifications88
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION37
01/10/2020123862310Open ↗
01/10/2020123862310Open ↗
09/23/2019123713945Open ↗
Showing 3 of 37 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST13
09/23/2019123713945Open ↗
04/03/2019123862310Open ↗
12/28/2018123557533Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
09/05/2026M00227845-I1Open ↗
09/03/2026M00228186-P1Open ↗
09/03/2026M00228186-I1Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM9
06/04/2013121609571Open ↗
11/29/2012121447746Open ↗
09/27/2012121381637Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT8
09/23/2019123713945Open ↗
04/03/2019123862310Open ↗
04/03/2019123862310Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
08/29/2026M00228186-P1Open ↗
08/29/2026M00228186-P1Open ↗
08/29/2026M00228186-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/29/2026M00228186-P1Open ↗
08/29/2026M00228186-P1Open ↗
08/26/2026M00227822-I1Open ↗
Showing 3 of 5 on file for this type
▸Trade Schedules & Equipment19
▸BISSELF-CERT PLUMBING NOTICE4
09/18/2012121127627Open ↗
08/29/2012120955449Open ↗
08/13/2012121127627Open ↗
Showing 3 of 4 on file for this type
▸BISEQUIPMENT USE PERMITS4
04/22/2019123450336Open ↗
04/18/2019123450336Open ↗
04/18/2019123450336Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT3
04/22/2019123450336Open ↗
04/18/2019123450336Open ↗
04/21/2014121447746Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
04/03/2019123862310Open ↗
04/03/2019123862310Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA2
12/19/2017121070768Open ↗
11/21/2017123016459Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection4
▸BISSTREET TREE CHECKLIST3
12/28/2018123557533Open ↗
07/26/2012121125120Open ↗
Showing 2 of 3 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos40
▸BISASBESTOS: CERTIFICATION (DEP ACP5)14
09/30/2019123713945Open ↗
04/03/2019123862310Open ↗
04/03/2019123863346Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
09/05/2026M00227845-I1Open ↗
09/03/2026M00228186-P1Open ↗
09/03/2026M00228186-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWOER: Notice to Proceed8
09/05/2026M00227845-I1Open ↗
09/03/2026M00228186-I1Open ↗
09/03/2026M00228186-P1Open ↗
Showing 3 of 8 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED4
09/26/2019123713945Open ↗
01/22/2019123557533Open ↗
09/28/2018123450336Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWOER: Notice of Satisfaction3
08/13/2026M00227845-I1Open ↗
08/13/2026M00227822-I1Open ↗
08/13/2026M00760555-I1Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
06/24/2013121609571Open ↗
▸Energy Compliance26
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS18
01/27/2020123862310Open ↗
01/27/2020123862310Open ↗
09/23/2019123713945Open ↗
Showing 3 of 18 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS7
04/22/2019123450336Open ↗
04/17/2019123450336Open ↗
03/14/2019123557533Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports1
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
11/23/2018123487422Open ↗
▸Approvals, Objections & Sign-offs28
▸BISADMINISTRATIVE OBJECTIONS10
06/04/2013121609571Open ↗
11/29/2012121447746Open ↗
09/27/2012121381637Open ↗
Showing 3 of 10 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST9
04/22/2019123450336Open ↗
04/19/2019123450336Open ↗
03/14/2019123557533Open ↗
Showing 3 of 9 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION8
10/24/2019123862310Open ↗
03/14/2019123557533Open ↗
03/12/2019123501040Open ↗
Showing 3 of 8 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE1
07/26/2012121125120Open ↗
▸Cost, Insurance & Ownership25
▸BISCOST AFFIDAVIT25
09/23/2019123713945Open ↗
04/03/2019123862310Open ↗
04/03/2019123862310Open ↗
Showing 3 of 25 on file for this type
▸Filing & Intake Forms34
▸BISEFILING COVER SHEET21
09/23/2019123713945Open ↗
04/03/2019123862310Open ↗
04/03/2019123862310Open ↗
Showing 3 of 21 on file for this type
▸BISADDITIONAL INFORMATION7
10/29/2020123713945Open ↗
01/29/2020123713945Open ↗
04/21/2014121447746Open ↗
Showing 3 of 7 on file for this type
▸BISBOROUGH INTAKE FORM5
04/22/2019123450336Open ↗
04/19/2019123450336Open ↗
03/14/2019123557533Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWAI1 Form (from plan PDF)1
08/16/2026M00227845-P1Open ↗
▸Other Documents1
▸BISPLOT DIAGRAM1
07/26/2012121125120Open ↗