Office with commercial, 7-19 stories
226 WEST 37 STREET
MANHATTAN · BIN 1014449
💬 Discuss this project
1924Year Built
16Stories
O6Building Class
M1-9A/R12Zoning
83,500 sfGross Floor Area
1Units
LL97 Covered17 Open Violations 16 unresolved · 1 paperwork only ▸FISP: SAFE
Office with commercial, 7-19 stories · Owner of record: ALRAM, · 5,496 sf lot · 15.19 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Floor 91p · 1 filing
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 21p · 1 filing
Floor 1
Cellar4p · 1 filing · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ATLAS NY CONSTRUCTION1207/08/2026
ALRAM,1203/22/2026
ALROM 1103/22/2026
YORAL1803/22/2026
TORALL LLC103/22/2026
BERNSTEIN REAL ESTATE303/22/2026
BERSTEIN REAL ESTATE103/22/2026
NAKASH BROTHERS REALTY603/22/2026
SSP CONSTRUCTION203/21/2026
YORALL LLC PROPERTY MANAGEMENT103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BOJIDAR KADIEV ARCHITECT107/03/2026
BAZINI ENGINEERING, P.C.207/07/2025
GAD ASHOORI PE104/18/2025
LIGHT HOUSE204/10/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SITE SAFETY BSD103/21/2026
ADVANCED BUILDERS SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ATLAS NY CONSTRUCTION CORPGeneral Contractor1007/08/2026
HAY MECHANICAL SOLUTIONSPlumbing207/08/2026
OUTFRONT MEDIA LLCElectrical103/21/2026
RAPPO, FRANKElectrical103/21/2026
CEESAY, BELALElectrical103/21/2026
DAJ EMR LLCGeneral Contractor104/09/2026
ROSENBLUM, AElectrical103/21/2026
MICHAEL BAPTISTEElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519104/18/2025
Building Lifecycle
All (107)Filed (6)Permit Issued (7)Signed Off (1)Facade (FISP) (11)Violation (60)Inspection (6)Objection (8)Special Inspection (8)
07/03/2026
Filed — Alteration CO
ALTERATION TO REVISE SCHEDULE A. NO CHANGE IN BULK, AREA, EGRESS OR CONSTRUCTION CLASSIFICATION
M01379294-I1
04/20/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/20/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/15/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/05/2026
Signed off — Alteration
SHOW HVAC UNITS AT 2ND FL TERRACE & 4TH FLOOR. OBTAIN EQUIPMENT USE PERMIT. TO ADDRESS FDNY SUMMON NUMBER 014167934Y.
M01211719-I1
01/05/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/22/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/22/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
12/12/2025
Permit issued — Mechanical Systems
M01211719-I1-MS
07/07/2025
Filed — Alteration
REPLACE BOILER AND REINSTALL EXISTING GAS BURNER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01167403-S1
07/07/2025
Filed — Alteration
REPLACE BOILER AND REINSTALL EXISTING GAS BURNER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01167403-I1
07/07/2025
Permit issued — Boiler Equipment
M01167403-I1-BE
07/07/2025
Permit issued — Plumbing
M01167403-S1-PL
07/07/2025
Special inspection requirement — HVAC-R and service water heating equipment
Joseph Bazini
06/05/2025
Objection resolved — Addressed
06/05/2025
Objection resolved — Addressed
06/05/2025
Objection resolved — Addressed
06/05/2025
Objection resolved — Addressed
04/28/2025
Objection raised — Zoning
04/28/2025
Objection raised — Scope
04/28/2025
Objection raised — Scope
04/28/2025
Objection raised — Mechanical
04/18/2025
Filed — Alteration
SHOW HVAC UNITS AT 2ND FL TERRACE & 4TH FLOOR. OBTAIN EQUIPMENT USE PERMIT. TO ADDRESS FDNY SUMMON NUMBER 014167934Y.
M01211719-I1
04/17/2025
Special inspection requirement — Final
NAVEEN KUMAR
04/17/2025
Special inspection requirement — Mechanical Systems
Younes Abouyaala
04/16/2025
Special inspection requirement — Duct leakage testing, insulation and design
Younes Abouyaala
04/16/2025
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
04/16/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
04/16/2025
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
04/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/01/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/25/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/25/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/18/2020
Cycle 9 facade report signed — SAFE
11/11/2020
Cycle 9 facade inspection completed
11/03/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/16/2020
Permit issued — Supported Scaffold
M00153422-I1-SF
09/16/2020
Permit issued — Sidewalk Shed
M00153425-I1-SH
08/31/2020
Cycle 9 facade report submitted
03/04/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/04/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/04/2019
Violation issued (DOB, closed)
VP*-VIOLATION UNSERVED ECB- DISMISSED
12/04/2019
Violation issued (DOB, closed)
VP*-VIOLATION UNSERVED ECB- DISMISSED
12/04/2019
Violation issued (ECB, closed)
Unknown
12/04/2019
Violation issued (ECB, closed)
Construction
12/04/2019
Violation issued (DOB, closed)
VP*-VIOLATION UNSERVED ECB- DISMISSED
12/04/2019
Violation issued (ECB, closed)
Construction
12/04/2019
Violation issued (ECB, closed)
Cranes and Derricks
09/06/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/06/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/06/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/06/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/03/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/20/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/12/2019
Permit issued — Supported Scaffold
M00153422-I1-SF
04/11/2019
Permit issued — Sidewalk Shed
M00153425-I1-SH
04/10/2019
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION
M00153422-I1
04/10/2019
Filed — Alteration
M00153425-I1
01/31/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 107 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offDAJ EMR LLC12/12/2025
DOB NOWBoiler EquipmentSigned-offHAY MECHANICAL SOLUTIONS07/07/2025
DOB NOWPlumbingPermit IssuedHAY MECHANICAL SOLUTIONS07/07/2025
DOB NOWSupported ScaffoldPermit IssuedATLAS NY CONSTRUCTION COR09/16/2020
DOB NOWSidewalk ShedPermit IssuedATLAS NY CONSTRUCTION COR09/16/2020
DOB NOWSupported ScaffoldPermit IssuedATLAS NY CONSTRUCTION COR04/12/2019
DOB NOWSidewalk ShedPermit IssuedATLAS NY CONSTRUCTION COR04/11/2019
BISOTISSUEDHYPER STRUCTURE CORP09/24/2019
BISOTISSUEDHYPER STRUCTURE CORP12/04/2017
BISEQISSUEDSSP CONSTRUCTION CORP09/18/2017
BISEQISSUEDGUL & G CONSTR. CORP09/20/2016
BISFBISSUEDACE-ATLAS PLBING & HTG05/22/2015
BISOTISSUEDACE ATLAS CORPORATION05/15/2015
BISPLISSUEDACE-ATLAS PLBING & HTG06/09/2014
BISFBISSUEDACE-ATLAS PLBING & HTG06/09/2014
BISOTISSUEDTRICE RESTORATION AND CON01/02/2014
BISEQISSUEDGUL & G CONSTR. CORP12/24/2013
BISEQISSUEDGUL & G CONSTR. CORP10/18/2013
BISMHISSUEDE & Y DEVELOPMENT INC08/28/2009
BISPLISSUEDSEICKEL AND SONS PLUMBING_INC.08/11/1994
BISOTISSUEDSEICKEL AND SONS PLUMBING_INC.08/11/1994
BISOTISSUEDSEICKEL & SONS PLUMBING INC05/12/1994
BISPLISSUEDSEICKEL & SONS PLUMBING INC05/12/1994
BISBLISSUEDSEICKEL AND SONS PLUMBING INC.12/23/1992
BISOTISSUEDEDDYLICO INTERIOR DESIGN CONSTR02/13/1992
1 project · most recent 07/07/2025
Gas
FiledStatusContractorScope
07/07/2025Signed-offHAY MECHANICAL SOLUTIONSGas
1 project · most recent 04/10/2019
FiledStatusContractorScope
04/10/2019Permit IssuedRICHARD NEU—
1 project · most recent 04/10/2019
Scaffold
FiledStatusContractorScope
04/10/2019Permit IssuedATLAS NY CONSTRUCTION CORScaffold
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
04/20/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/20/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/15/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/05/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/22/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/22/2025Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
07/07/2025HVAC-R and service water heating equipmentJoseph Bazinienergy_progress
04/17/2025FinalNAVEEN KUMARprogress
04/17/2025Mechanical SystemsYounes Abouyaalaspecial
04/16/2025Duct leakage testing, insulation and designYounes Abouyaalaenergy_progress
04/16/2025HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
04/16/2025HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
04/16/2025HVAC-R and service water heating system controlsYounes Abouyaalaenergy_progress
04/16/2025Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
▾Documents — 116 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch3
08/24/2026M01211719-I1Request digital key ↗
08/23/2026M01167403-S1Request digital key ↗
08/23/2026M01167403-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00153425-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/05/2026M00153422-I1Request digital key ↗
▸Applications & Permits22
▸BISWORK PERMIT APPLICATION12
09/25/2019140676864Open ↗
07/15/2019140676864Open ↗
12/04/2017140676864Open ↗
Showing 3 of 12 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION10
10/06/2017140704156Open ↗
09/17/2017140695576Open ↗
08/03/2017140676864Open ↗
Showing 3 of 10 on file for this type
▸Seals & Professional Certifications29
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
10/06/2017140704156Open ↗
09/17/2017140695576Open ↗
09/29/2016122892281Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
06/14/2014122034663Open ↗
06/14/2014122034663Open ↗
10/09/2013121804315Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/23/2026M01167403-S1Open ↗
08/23/2026M01167403-I1Open ↗
08/13/2026M01211719-I1Open ↗
Showing 3 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
10/06/2017140704156Open ↗
09/17/2017140695576Open ↗
10/17/2013140125442Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
09/29/2016122892281Open ↗
06/14/2014122034663Open ↗
08/07/2009120107160Open ↗
▸DOB NOWProgress Inspector Seal & Signature3
09/23/2026M01167403-I1Open ↗
09/02/2026M01211719-I1Open ↗
09/02/2026M01211719-I1Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
09/17/2017140695576Open ↗
10/17/2013140125442Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
08/03/2017140676864Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
08/07/2009120107160Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/02/2026M01211719-I1Open ↗
▸Trade Schedules & Equipment10
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT3
06/29/2015122034663Open ↗
06/29/2015122034663Open ↗
06/14/2014122034663Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT3
09/29/2009120107160Open ↗
08/07/2009120107160Open ↗
09/21/2009120107160Open ↗
▸BISEQUIPMENT USE PERMITS2
09/21/2009120107160Open ↗
09/21/2009120107160Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
06/14/2014122034663Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
09/17/2014122034663Open ↗
▸Safety & Tenant Protection3
▸BISTenant Protection Plan and Notes3
08/03/2017140676864Open ↗
09/29/2016122892281Open ↗
09/17/2017140695576Open ↗
▸Environmental & Asbestos9
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
08/03/2017140676864Open ↗
06/14/2014122034663Open ↗
10/16/2013121804315Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
08/07/2009120107160Open ↗
08/07/2009120107160Open ↗
08/07/2009120107160Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/23/2026M01167403-I1Open ↗
08/23/2026M01167403-S1Open ↗
08/13/2026M01211719-I1Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
06/14/2014122034663Open ↗
06/14/2014122034663Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
09/01/2020140676864Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
08/03/2017140676864Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY6
09/01/2020140676864Open ↗
09/01/2020140676864Open ↗
10/06/2017140704156Open ↗
Showing 3 of 6 on file for this type
▸Approvals, Objections & Sign-offs8
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
09/01/2020140676864Open ↗
09/29/2009120107160Open ↗
▸BISSUPERSEDING LETTER2
09/25/2019140676864Open ↗
07/15/2019140676864Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE2
03/17/2014121943317Open ↗
03/17/2014121943317Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
09/29/2009120107160Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
08/07/2009120107160Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT6
10/06/2017140704156Open ↗
08/03/2017140676864Open ↗
06/14/2014122034663Open ↗
Showing 3 of 6 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
09/01/2020140676864Open ↗
▸Filing & Intake Forms11
▸BISEFILING COVER SHEET5
09/29/2016122892281Open ↗
06/14/2014122034663Open ↗
03/17/2014121943317Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
10/06/2017140704156Open ↗
09/17/2017140695576Open ↗
08/03/2017140676864Open ↗
Showing 3 of 4 on file for this type
▸BISADDITIONAL INFORMATION2
08/11/2017140676864Open ↗
08/15/2014121804315Open ↗
▸Other Documents2
▸BISPLOT DIAGRAM1
03/17/2014121943317Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
12/04/2017140676864Open ↗