← Back
BuildNYC
Elevator cooperative
2260 BURNETT STREET
BROOKLYN · BIN 3407510
💬 Discuss this project
1952Year Built
6Stories
D4Building Class
R4Zoning
261,072 sfGross Floor Area
264Units
LL97 CoveredRent Stabilized9 Active Violations ▸FDNY Report ↗
Elevator cooperative · Owner of record: Brooklyn Marine PK Development · 120,000 sf lot · 2.18 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofFacade repair, brick replacement, and masonry repointing3p · 4 filings · 16 docs
CellarNon-structural interior renovation work5 filings · 19 docs
BasementAT&T 5G NR Radio Installation1p · 3 filings · 10 docs
Sub-BasementAT&T 5G NR Radio Installation2 filings · 7 docs
Site & exteriorFacade repair, brick replacement, and masonry repointing1p · 2 filings · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Brooklyn Marine PK Development903/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MJM Associates308/17/2023
New York & Company411/04/2022
KMB Design Group301/04/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
New York & Company803/21/2026
CCM Services Group303/21/2026
Oculus Consulting Group303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KMM TelecommunicationsGeneral Contractor1203/21/2026
Dimitris Paintingspecialty_contractor603/21/2026
Metro RF ServicesGeneral Contractor203/21/2026
KNS Building RestorationGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Jaj Engineering930108/17/2023
Oculus Consulting Group3609208/17/2023
New York Engineering Associates851111/04/2022
KMB Design Group513208/03/2020
Building Lifecycle
All (62)Filed (8)Permit Issued (8)Signed Off (5)Violation (21)Objection (10)Special Inspection (10)
09/14/2023
Permit issued — General Construction
B00893756-I1-GC
08/17/2023
Filed — Alteration
FILING IS MADE FOR THE REPAIR OF SELECT PORTIONS OF THE FACADE, INCLUDING FACE BRICK REPLACEMENT, MASONRY JOINT REPOINTING, & ASSOCIATED LINTELS & SILLS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
B00893756-I1
06/21/2023
Special inspection requirement — Masonry
John Scheschareg
06/21/2023
Special inspection requirement — Tenant Protection Plan Compliance
Joseph Jabour
06/21/2023
Special inspection requirement — Final
John Scheschareg
05/30/2023
Signed off — Alteration
B00602202-I1
05/03/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/29/2023
Violation issued (HPD, closed)
A
11/10/2022
Violation issued (HPD, closed)
I
11/04/2022
Filed — Alteration
REPLACE DRYER VENTS.
B00797469-I1
11/04/2022
Filed — Alteration
REGISTER GAS DRYERS AND WASHING MACHINES.
B00795704-I1
11/04/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
LOUIS ARENA
10/24/2022
Signed off — Alteration
FILING MADE TO IDENTIFY EXISTING ORDINARY USE ROOM ASSOCIATED WITH N.B. #2012/1950 AND CO #134120. MODIFY DOOR HARDWARE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS (DIRECTIVE 14/75).
B00751092-I1
08/22/2022
Special inspection requirement — Energy Code Compliance Inspections
LOUIS ARENA
08/22/2022
Special inspection requirement — Final
LOUIS ARENA
08/21/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/20/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/18/2022
Special inspection requirement — Energy Code Compliance Inspections
LOUIS ARENA
08/10/2022
Signed off — Alteration
FILING MADE TO SECURE THE CERTIFICATES OF COMPLIANCE FOR THE MECHANICAL MINI-SPLIT AIR CONDITIONING UNITS IN THE CELLAR LEVEL, AND OPEN SPACE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. (DIRECTIVE 14/75)
B00751084-I1
07/20/2022
Permit issued — Mechanical Systems
B00751084-I1-MS
07/20/2022
Permit issued — General Construction
B00751092-I1-GC
06/10/2022
Filed — Alteration
FILING MADE TO IDENTIFY EXISTING ORDINARY USE ROOM ASSOCIATED WITH N.B. #2012/1950 AND CO #134120. MODIFY DOOR HARDWARE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS (DIRECTIVE 14/75).
B00751092-I1
06/10/2022
Filed — Alteration
FILING MADE TO SECURE THE CERTIFICATES OF COMPLIANCE FOR THE MECHANICAL MINI-SPLIT AIR CONDITIONING UNITS IN THE CELLAR LEVEL, AND OPEN SPACE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. (DIRECTIVE 14/75)
B00751084-I1
06/06/2022
Special inspection requirement — Energy Code Compliance Inspections
John Scheschareg
06/06/2022
Special inspection requirement — Final
John Scheschareg
05/13/2022
Permit issued — Antenna
B00602202-I1-AN
02/14/2022
Permit issued — Antenna
B00602202-I1-AN
02/09/2022
Special inspection requirement — Energy Code Compliance Inspections
LOUIS ARENA
01/24/2022
Signed off — Alteration
B00343719-I1
01/04/2022
Filed — Alteration
B00602202-I1
09/30/2021
Permit issued — Antenna
B00343719-I1-AN
04/16/2021
Violation issued (HPD, closed)
A
08/14/2020
Permit issued — Antenna
B00343719-I1-AN
08/03/2020
Filed — Alteration
B00343719-I1
12/04/2018
Signed off — Alteration
AT&T / Replacement of existing telecommunications antennas with installation/replacement of RRH units on roof. Installation of RRH units in existing equipment room in cellar. All work in compliance with TPPN 5/98. No change to occupancy, use, or egress.
B00007494-I1
06/19/2018
Permit issued — Antenna
B00007494-I1-AN
05/31/2018
Objection raised — 1998-AN AC 28-103.14.1-Adminis
05/31/2018
Objection resolved — Addressed
05/31/2018
Objection raised — 2014-AN BC 3108.3 & BC 3108.4-
05/31/2018
Objection resolved — Addressed
04/23/2018
Filed — Alteration
AT&T / Replacement of existing telecommunications antennas with installation/replacement of RRH units on roof. Installation of RRH units in existing equipment room in cellar. All work in compliance with TPPN 5/98. No change to occupancy, use, or egress.
B00007494-I1
04/23/2018
Objection raised — Admin
04/23/2018
Objection resolved — Addressed
04/23/2018
Objection raised — 2014-AN AC 28-104.7.1-Administ
04/23/2018
Objection resolved — Addressed
04/23/2018
Objection raised — 2014-AN AC 28-104.11-Building
04/23/2018
Objection resolved — Addressed
05/02/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/09/2014
Violation issued (ECB, closed)
Elevators
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/01/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/01/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/13/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/13/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/30/2008
Violation issued (FDNY_NOV, closed)
05/04/2003
Violation issued (HPD, open)
B
05/04/2003
Violation issued (HPD, open)
B
02/07/2000
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/07/2000
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 62 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedKNS Building Rest09/14/2023
DOB NOWMechanical SystemsSigned-offDimitris Painting07/20/2022
DOB NOWGeneral ConstructionSigned-offDimitris Painting07/20/2022
DOB NOWAntennaSigned-offKMM Telecommunications05/13/2022
DOB NOWAntennaSigned-offKMM Telecommunications02/14/2022
DOB NOWAntennaSigned-offKMM Telecommunications09/30/2021
DOB NOWAntennaSigned-offKMM Telecommunications08/14/2020
DOB NOWAntennaSigned-offMetro RF Services06/19/2018
BISMHISSUEDEtak Systems09/19/2018
BISPLISSUEDService Tech Mechanical & Plumbing06/14/2016
BISOTISSUEDNikolai Design Systems08/25/2014
BISBLISSUEDGee Cee Mechanical Service08/14/2014
BISPLISSUEDService Tech Mechanical & Plumbing08/14/2014
BISOTISSUEDSquan Construction Services10/18/2012
BISOTISSUEDQuanta Wireless Solutions09/13/2011
BISOTISSUEDQuanta Wireless Solutions07/08/2011
BISEQISSUEDAdvanced Installations12/31/2008
BISOTISSUEDCercone Exterior Resto*12/10/2008
1 project · most recent 11/04/2022
FiledStatusContractorScope
11/04/2022——3 heads
2 projects · most recent 11/04/2022
Gas Water/Sanitary Plumbing-Sprinkler
FiledStatusContractorScope
11/04/2022——Gas, Plumbing-Sprinkler, Water/Sanitary
———Gas, Water/Sanitary
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
06/21/2023MasonryJohn Schescharegspecial
06/21/2023Tenant Protection Plan ComplianceJoseph Jabourspecial
06/21/2023FinalJohn Schescharegprogress
11/04/2022Fire-Resistant Penetrations and JointsLOUIS ARENAspecial
08/22/2022Energy Code Compliance InspectionsLOUIS ARENAprogress
08/22/2022FinalLOUIS ARENAprogress
08/18/2022Energy Code Compliance InspectionsLOUIS ARENAprogress
06/06/2022Energy Code Compliance InspectionsJohn Schescharegprogress
06/06/2022FinalJohn Schescharegprogress
02/09/2022Energy Code Compliance InspectionsLOUIS ARENAprogress
▾Documents — 123 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch7
08/31/2026B00602202-I1Request digital key ↗
08/29/2026B00751084-I1Request digital key ↗
08/29/2026B00751092-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Antenna1
09/02/2026B00343719-I1Request digital key ↗
▸Applications & Permits17
▸BISWORK PERMIT APPLICATION10
09/21/2018321827350Open ↗
08/15/2014320935903Open ↗
08/15/2014320935903Open ↗
Showing 3 of 10 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION6
08/27/2018321827350Open ↗
08/25/2014320944813Open ↗
08/15/2014320935903Open ↗
Showing 3 of 6 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
10/03/2019321827350Open ↗
▸Seals & Professional Certifications36
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION11
10/16/2019321827350Open ↗
08/27/2018321827350Open ↗
09/01/2016320935903Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
09/03/2026B00007494-I1Open ↗
08/31/2026B00602202-I1Open ↗
08/29/2026B00751092-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
08/31/2026B00797469-I1Open ↗
08/28/2026B00893756-I1Open ↗
08/27/2026B00677636-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
08/25/2014320944813Open ↗
08/15/2014320935903Open ↗
09/11/2008310197104Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
08/28/2026B00893756-I1Open ↗
08/28/2026B00893756-I1Open ↗
08/26/2026B00795704-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
08/25/2014320944813Open ↗
08/15/2014320935903Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
09/11/2008310197104Open ↗
▸Trade Schedules & Equipment4
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
08/15/2014320935903Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
08/15/2014320935903Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
02/24/2021321827350Open ↗
▸BISEQUIPMENT USE PERMITS1
02/24/2021321827350Open ↗
▸Safety & Tenant Protection3
▸BISTenant Protection Plan and Notes1
08/27/2018321827350Open ↗
▸BISSTREET TREE CHECKLIST1
10/14/2008310209878Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026B00343719-I1Open ↗
▸Environmental & Asbestos15
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/31/2026B00602202-I1Open ↗
08/28/2026B00797469-I1Open ↗
08/27/2026B00893756-I1Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
08/27/2018321827350Open ↗
08/25/2014320944813Open ↗
08/15/2014320935903Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
10/14/2008310209878Open ↗
09/11/2008310197104Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
06/17/2011320321479Open ↗
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
08/25/2014320944813Open ↗
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
10/16/2019321827350Open ↗
08/27/2018321827350Open ↗
09/01/2016320935903Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
10/16/2019321827350Open ↗
09/01/2016320935903Open ↗
01/14/2015320944813Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00751084-I1Open ↗
▸Approvals, Objections & Sign-offs12
▸BISADMINISTRATIVE OBJECTIONS5
08/25/2014320944813Open ↗
08/15/2014320935903Open ↗
06/17/2011320321479Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
10/16/2019321827350Open ↗
09/01/2016320935903Open ↗
11/26/2013320321479Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
01/14/2015320944813Open ↗
11/26/2013320321479Open ↗
▸Cost, Insurance & Ownership10
▸BISCOST AFFIDAVIT10
10/16/2019321827350Open ↗
08/27/2018321827350Open ↗
09/01/2016320935903Open ↗
Showing 3 of 10 on file for this type
▸Filing & Intake Forms6
▸BISEFILING COVER SHEET5
08/27/2018321827350Open ↗
08/25/2014320944813Open ↗
08/15/2014320935903Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM1
10/16/2019321827350Open ↗
▸Other Documents1
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
09/01/2016320935903Open ↗