← Back
BuildNYC
Over six families without stores
2260 WALTON AVENUE
BRONX · BIN 2013990
💬 Discuss this project
1912Year Built
5Stories
C1Building Class
R8Zoning
19,475 sfGross Floor Area
27Units
Rent Stabilized124 Active Violations 3 likely answered ▸
Over six families without stores · Owner of record: Walton Gold · 4,750 sf lot · 4.1 FAR built · Flood zone X
Locations of Work
MechanicalPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofInstall new chimney liner3p · 1 filing · 6 docs
CellarBoiler replacement in cellar14p · 3 filings · 19 docs
Site & exterior5p · 1 filing · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
2345 Crotona Gold1707/08/2026
Walton Gold103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/12/2014$2.4M—2260 WALTON AVE LLC → WALTON GOLD LLC$123/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Bazini Engineering311/22/2024
New Age110/20/2021
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Zone Plumbing & HeatingPlumbing707/08/2026
Guaranteed Home Improvemespecialty_contractor103/21/2026
Seaview PlumbingGeneral Contractor109/02/1998
Seaview PlumbingPlumbing109/02/1998
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Bazini Engineering1808211/22/2024
New Age Engineering7746110/20/2021
Building Lifecycle
09/16/2026
Failure to maintain building in code-compliant mortar. 5-story, brick,m. D. Building on interior lot. Observed missing coping stone at exp…
ECB violation · closed
12/03/2025
§ 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY…
HPD violation · open
10/13/2025
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 3E, 3rd…
HPD violation · closed
10/13/2025
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE AT LOWER WINDOW SASH AT FORE ESCAPE WINDOWS IN THE 1st ROOM FROM…
HPD violation · closed
10/13/2025
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 3rd ROOM FROM EAST LOCATED AT…
HPD violation · closed
220 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offZone Plumbing & Heating10/22/2024
DOB NOWPlumbingSigned-offZone Plumbing & Heating05/18/2023
DOB NOWPlumbingSigned-offZone Plumbing & Heating08/12/2022
DOB NOWBoiler EquipmentSigned-offFour Suns Fuel Oil12/28/2021
BISFBISSUEDFour Suns Fuel Oil10/06/2015
BISPLISSUEDZone Plumbing & Heating10/06/2015
BISOTISSUEDSeaview Plumbing09/02/1998
BISPLISSUEDSeaview Plumbing09/02/1998
1 project · most recent 12/17/2019
FiledStatusContractorScope
12/17/2019Permit IssuedPower Key Electric—
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
03/06/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/05/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/10/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/03/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/28/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
09/20/2022Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
11/22/2024Fire-Resistant Penetrations and JointsJoseph Bazinispecial
10/13/2021Mechanical SystemsStephen Shishkospecial
10/13/2021Chimneys and ventsStephen Shishkospecial
10/13/2021FinalStephen Shishkoprogress
09/14/2021HVAC-R and service water heating equipmentJoseph Bazinienergy_progress
33 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account