DOB08/12/2026STRUCTURE RENDERED NON-COMPLIANT, OBSERVED SEVERE FIRE, WATER AND SMOK E DAMAGE THROUGHOUT ALONG W/OPEN ROOF. SEVERELY CHARRED CEILING, WALL FRAMING. LARGE PORTIONS OF FIREPROOFING MISSING/REMOVED LEAVING PREMIS ES UNPROTECTED. VACATE ENTIRE PREMISES FORTHWITH STRUCTURE MUST BE MAINTAINED IN CODE-COMPLIANT MANNER
DOB08/12/2026STRUCTURE RENDERED NON-COMPLIANT, OBSERVED SEVERE FIRE, WATER, AND SMO KE DAMAGE THROUGHOUT, SEVERELY CHARRED CEILING AND WALL FRAMING, LARGE SECTIONS OF FIREPROOFING MISSING/REMOVED LEAVING PREMISES UNPROTECTED VACATE ENTIRE PREMISES FORTHWITH STRUCTURE MUST BE MAINTAINED IN A CODE-COMPLIANT MANNER
DOB08/12/2026STRUCTURE RENDERED NON COMPLIANT, OBSERVED FIRE, WATER, AND SMOKE DAMA GE THROUGHOUT, SEVERELY CHARRED CEILING/WALL FRAMING, LARGE PORTIONS O F FIREPROOFING MISSING/REMOVED LEAVING PREMISES UNPORTECTED. VACATE EN TIRE PREMISES FORTHWITH STRUCTURE MUST BE MAINTAINED IN A CODE-COMPLIANT MANNER
DOB08/12/2026FAILURE TO MAINTAIN BLDG IN A SAFE CONDITION.THE BLDG SUFFRD FIRE DMG ON/ARND 8/11/26.ROOF WAS PRTLLY OPEN/MODERATELY TO SEVERELY DMGD ROOF JOISTS.WALL STUDS WERE FIRE DMGD.WATER DMG THROUGHOUT BLDG.1.OWNR TO RTAIN NYSPE TO EVAL ENT STRCTRE&FILE RPAIR DWGS W/DOB,2.BLDG TO BE PERM RPAIRD UNDR PRMT STRTNG BY 9/28/26
DOB08/12/2026EMRGENCY WORK ORDER.THE BLDG SUFFRD FIRE DMG ON/AROUND 8/11/26.ROOF WAS PRTLLY OPEN W/MODERATELY TO SEVERELY DMGD ROOF JOISTS WALL STUDS WERE FIRE DMGD.WATER DMG THROUGHOUT THE BLDG.BLDG STRCT CMP.OWNR TO RTAIN NYSPE,GC REG W/DOB&ASBESTOS CNTRCTR TO IMMED:1.INSLL SDWLK SHED, 2.INSTLL TEMP SHORNG/BRACNG,TEMP ROOFNG
DOB08/02/2026STRUCTURE RENDERED NON COMPLIANT.OBSERVED SEVERE FIRE, WATER & SMOKE DAMAGE THROUGHOUT SEVERLY CHARRED CEILING/WALL FRAMING, LARGE SECTION OF FIRE PROOFING MISSING /REMOVED RENDERING PREMISES UNPROTECTED VACATE ENTIRE PREMISES FORTHWITH STRUCTURE MUST BE MAINTAINED IN CODE COMPLIANT MANNER
DOB09/23/2024VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION
DOB03/16/2020VIOLATION ISSUED - FAILURE TO FILE 2017 INTERNAL HIGH PRESSURE BOILER INSPECTION
DOB06/22/2018VIOLATION ISSUED FOR FAILURE TO FILE 2016 ANNUAL HIGH PRESSURE BOILER INSPECTION
ECB02/18/200918B.48ANothing owed — awaiting certificate of correction
ECB08/06/2007B4A, 18A,18B, 11C.Nothing owed — awaiting certificate of correction
One story retail building · Owner of record: JEROME PROPERTIES LLC · 10,000 sf lot · 0.83 FAR built · Flood zone X