← Back
Primarily 2 family with 1 store or office
2265 65 STREET
BROOKLYN · BIN 3172258
💬 Discuss this project
1925Year Built
2Stories
S2Building Class
R6AZoning
3,125 sfGross Floor Area
3Units
Rent Stabilized8 Open Violations ▸FDNY Report ↗
Primarily 2 family with 1 store or office · Owner of record: GARDEN PROGRAM LLC · 2,650 sf lot · 1.18 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingGeneral
Roof1p · 1 filing · 12 docs
Floor 215p · 3 filings · 20 docs
Floor 116p · 4 filings · 20 docs
Cellar17p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GARDEN PROGRAM LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/06/2022$1.4M—— → —$464/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MW PROFESSIONAL ENGINEERING, P.C.307/15/2024
NY BUILDING ASSOCIATES INC501/10/2024
BASSIRI107/12/2023
J&R DESIGN AND INSPECTION CORP.906/16/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HIGHQUALITY CONSTRUCTION VNW2603/21/2026
ECDESIGN STUDIO203/21/2026
HIGH QUALITY 338203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HIGH QUALITY CONSTRUCTIONGeneral Contractor803/21/2026
CASE PLUMBING LLCFire Protection207/08/2026
LAILE INCGeneral Contractor203/21/2026
AMERICAN STANDARD P&H CORORP.Plumbing207/08/2026
NEPTUNE SIGNS AWNINGSScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MW PROFESSIONAL ENGINEERI570105/30/2024
NKM ENGINEERING PLLC6244501/10/2024
J&R DESIGN AND INSPECTION6637906/16/2023
Building Lifecycle
All (126)Filed (18)Permit Issued (10)Signed Off (7)Violation (17)Inspection (13)Objection (31)Special Inspection (30)
05/01/2026
Violation issued (HPD, open)
A
11/18/2025
Violation issued (HPD, open)
I
06/06/2025
Violation issued (HPD, open)
A
11/25/2024
Violation issued (HPD, open)
I
09/24/2024
Signed off — Alteration
Construct accessory storage room in rear yard. Address violation 39114178X. No change in use, egress and occupancy.
B01056755-I1
09/09/2024
Permit issued — Structural
B01056755-I1-GC-CX
07/17/2024
Objection resolved — Addressed
07/15/2024
Filed — Alteration
Construct accessory storage room in rear yard. Address violation 39114178X. No change in use, egress and occupancy.
B01056755-P1
07/12/2024
Special inspection requirement — Final
07/12/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
07/12/2024
Special inspection requirement — Concrete - Cast-In-Place
07/12/2024
Special inspection requirement — Masonry
07/12/2024
Special inspection requirement — Structural Cold-Formed Steel
07/12/2024
Special inspection requirement — Tenant Protection Plan Compliance
07/11/2024
Objection raised — Scope
06/28/2024
Objection raised — Other
06/26/2024
Filed — Alteration
Construct accessory storage room in rear yard. Address violation 39114178X. No change in use, egress and occupancy.
B01072491-I1
06/03/2024
Objection raised — Other
06/03/2024
Objection resolved — Addressed
06/03/2024
Objection raised — Energy
06/03/2024
Objection resolved — Addressed
06/03/2024
Objection raised — Other
06/03/2024
Objection resolved — Addressed
05/31/2024
Objection raised — Zoning
05/31/2024
Objection resolved — Addressed
05/30/2024
Filed — Alteration
Construct accessory storage room in rear yard. Address violation 39114178X. No change in use, egress and occupancy.
B01056755-I1
05/13/2024
Violation issued (ECB, closed)
Construction
04/08/2024
Violation issued (HPD, open)
A
02/02/2024
Signed off — Alteration
FILE ALT-2 JOB WITH INTERIOR WORK ON CELLAR AND 1ST FLOOR AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00985797-I1
01/23/2024
Permit issued — General Construction
B00985797-I1-GC
01/10/2024
Filed — Alteration
FILE ALT-2 JOB WITH INTERIOR WORK ON CELLAR AND 1ST FLOOR AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00985797-I1
01/08/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
01/08/2024
Special inspection requirement — Tenant Protection Plan Compliance
NARESH MAHANGU
01/08/2024
Special inspection requirement — Fire-Resistance Rated Construction
NARESH MAHANGU
01/08/2024
Special inspection requirement — Energy Code Compliance Inspections
NARESH MAHANGU
01/08/2024
Special inspection requirement — Final
Robert Truskosky
11/17/2023
Violation issued (HPD, open)
I
11/02/2023
Objection resolved — Addressed
10/26/2023
Objection raised — Scope
10/18/2023
Filed — Alteration CO
CONVERT 1ST FLOOR OF AN EXISTING 2-STORY BUILDING TO COMMERCIAL USE(OFFICE) AND CELLAR TO ACCESSORY USE(STORAGE). GENERAL CONSTRUCTION WORK AS PER PLAN. OBTAIN NEW CERTIFICATE OF OCCUPANCY.
B00747726-P3
10/17/2023
Special inspection requirement — Energy Code Compliance Inspections
NARESH MAHANGU
10/17/2023
Special inspection requirement — Concrete - Cast-In-Place
NARESH MAHANGU
10/17/2023
Special inspection requirement — Metering
NARESH MAHANGU
10/17/2023
Special inspection requirement — Lighting controls
NARESH MAHANGU
10/17/2023
Special inspection requirement — Fenestration areas
NARESH MAHANGU
10/17/2023
Special inspection requirement — Air barrier - visual inspection
NARESH MAHANGU
10/17/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
NARESH MAHANGU
10/17/2023
Special inspection requirement — Fire-Resistance Rated Construction
NARESH MAHANGU
10/17/2023
Special inspection requirement — Interior lighting power
NARESH MAHANGU
10/17/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
10/17/2023
Special inspection requirement — Fenestration air leakage
NARESH MAHANGU
08/31/2023
Signed off — Alteration
INSTALL A NEW NON-ILLUMINATED SIGN READ "PROWIN CARGO" AS PER PLAN. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
B00902955-I1
08/29/2023
Inspection — Pass-Final Sign Permit Inspection
Pass
View inspection ↗
08/22/2023
Permit issued — Sign
B00902955-I1-SG
08/08/2023
Signed off — Alteration
INTERIOR RENOVATION OF EXISTING RESIDENTIAL HOUSE WITH PARTITIONING, PAINTING, REPAIRING, REPLACING AND INSTALLING WORKS. NO EXTERIOR OR STRUCTURAL WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00750951-I1
08/08/2023
Signed off — Alteration
FILE PLUMBING WORK IN CONJUNCTION WITH BIS JOB# B00750951. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00753108-I1
08/01/2023
Signed off — Alteration
SPRINKLER APPLICATION FILE IN CONJUNCTION WITH ALTERATION-CO JOB#B00747726-I1. PROPOSED SPRINKLER WORK ON CELLAR AND 1ST FLOOR AS PER PLAN.
B00781149-I1
07/12/2023
Filed — Alteration
INSTALL A NEW NON-ILLUMINATED SIGN READ "PROWIN CARGO" AS PER PLAN. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
B00902955-I1
06/23/2023
Filed — Alteration CO
CONVERT 1ST FLOOR OF AN EXISTING 2-STORY BUILDING TO COMMERCIAL USE(OFFICE) AND CELLAR TO ACCESSORY USE(STORAGE). GENERAL CONSTRUCTION WORK AS PER PLAN. OBTAIN NEW CERTIFICATE OF OCCUPANCY.
B00747726-P2
06/19/2023
Special inspection requirement — Fire-Resistance Rated Construction
Robert Truskosky
Latest 60 of 126 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offLAILE INC09/09/2024
DOB NOWGeneral ConstructionSigned-offHIGH QUALITY CONSTRUCTION01/23/2024
DOB NOWSignSigned-offNEPTUNE SIGNS&AWNINGS INC08/22/2023
DOB NOWSprinklersSigned-offS & L PLUMBING INC02/10/2023
DOB NOWBoiler EquipmentSigned-offAMERICAN STANDARD P&H CORORP.10/06/2022
DOB NOWSprinklersSigned-offS & L PLUMBING INC09/27/2022
DOB NOWGeneral ConstructionPermit IssuedHIGH QUALITY CONSTRUCTION09/21/2022
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.06/11/2022
DOB NOWMechanical SystemsSigned-offHIGH QUALITY CONSTRUCTION06/08/2022
DOB NOWMechanical SystemsSigned-offHIGH QUALITY CONSTRUCTION06/08/2022
2 projects · most recent 03/09/2023
General Wiring
FiledStatusContractorScope
03/09/2023CompleteKWONG MING ELECTRIC INCGeneral Wiring
02/06/2023CompleteR.C.M. ELECTRIC CORP.—
1 project · most recent 06/26/2024
Concrete Masonry
FiledStatusContractorScope
06/26/2024——Concrete, Masonry
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
08/29/2023Pass-Final Sign Permit InspectionPassView ↗
05/17/2023Pass-Final CND-Occupancy InspectionPassView ↗
05/02/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/10/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/07/2023Certified Sprinkler - SP - RoughingCertifiedView ↗
03/02/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/25/2023Pass-Final CND-Occupancy InspectionPassView ↗
01/23/2023Fail-Final CND-Occupancy InspectionFailView ↗
11/03/2022Pass-Final Boiler Equipment InspectionPassView ↗
09/26/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/31/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/31/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/31/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 100
DateRequirementInspectorRole
07/12/2024Concrete - Cast-In-Place—special
07/12/2024Excavations - Sheeting, Shoring, and Bracing—special
07/12/2024Masonry—special
07/12/2024Structural Cold-Formed Steel—special
07/12/2024Tenant Protection Plan Compliance—special
07/12/2024Final—progress
01/08/2024Energy Code Compliance InspectionsNARESH MAHANGUprogress
01/08/2024FinalRobert Truskoskyprogress
01/08/2024Fire-Resistance Rated ConstructionNARESH MAHANGUprogress
01/08/2024Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
01/08/2024Tenant Protection Plan ComplianceNARESH MAHANGUspecial
10/17/2023Fenestration and door U-factor and product ratingsNARESH MAHANGUenergy_progress
10/17/2023Air barrier - visual inspectionNARESH MAHANGUenergy_progress
10/17/2023Lighting controlsNARESH MAHANGUenergy_progress
10/17/2023Concrete - Cast-In-PlaceNARESH MAHANGUspecial
10/17/2023Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
10/17/2023Energy Code Compliance InspectionsNARESH MAHANGUprogress
10/17/2023Fire-Resistance Rated ConstructionNARESH MAHANGUprogress
10/17/2023Fenestration areasNARESH MAHANGUenergy_progress
10/17/2023MeteringNARESH MAHANGUenergy_progress
10/17/2023Fenestration air leakageNARESH MAHANGUenergy_progress
10/17/2023Interior lighting powerNARESH MAHANGUenergy_progress
06/19/2023FinalRobert Truskoskyprogress
06/19/2023Mechanical SystemsRobert Truskoskyspecial
06/19/2023Fire-Resistant Penetrations and JointsRobert Truskoskyspecial
Latest 25 of 100.
▾Documents — 116 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch18
08/29/2026B00750951-I1Request digital key ↗
08/29/2026B00750951-P1Request digital key ↗
08/28/2026B00753108-P2Request digital key ↗
Showing 3 of 18 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram3
08/25/2026B01056755-I1Open ↗
08/13/2026B01056755-P1Open ↗
08/13/2026B01072491-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00747726-I1Open ↗
▸Seals & Professional Certifications57
▸DOB NOWProgress Inspector Seal & Signature23
09/23/2026B08010450-I1Open ↗
09/02/2026B00753108-P1Open ↗
09/02/2026B00747726-P2Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature18
08/29/2026B00750951-I1Open ↗
08/28/2026B00753108-P1Open ↗
08/28/2026B00753108-I1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature16
09/23/2026B08010450-I1Open ↗
09/23/2026B08010450-I1Open ↗
09/02/2026B00753108-P1Open ↗
Showing 3 of 16 on file for this type
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist4
08/26/2026B00747726-P2Open ↗
08/15/2026B00747726-P1Open ↗
08/15/2026B00747726-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos14
▸DOB NOWDEP ACP-5: Asbestos Assessment Report14
08/29/2026B00750951-I1Open ↗
08/28/2026B00753108-I1Open ↗
08/28/2026B00753108-P2Open ↗
Showing 3 of 14 on file for this type
▸Energy Compliance3
▸DOB NOWEN2: As Built Energy Analysis3
08/13/2026B00753108-I1Open ↗
08/13/2026B00750951-I1Open ↗
08/13/2026B00747726-I1Open ↗
▸Inspections & Test Reports2
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B01072491-I1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026B01072491-I1Open ↗
▸Other Documents14
▸DOB NOWProperty Ownership Certification4
08/26/2026B00747726-P2Open ↗
08/15/2026B00747726-P1Open ↗
08/15/2026B00747726-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/25/2026B01056755-I1Open ↗
08/13/2026B01056755-P1Open ↗
08/13/2026B01072491-I1Open ↗
▸DOB NOWSite Survey: Initial3
08/25/2026B01056755-I1Open ↗
08/13/2026B01056755-P1Open ↗
08/13/2026B01072491-I1Open ↗
▸DOB NOWPlot Diagram3
08/25/2026B01056755-I1Open ↗
08/13/2026B01056755-P1Open ↗
08/13/2026B01072491-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00747726-I1Open ↗