← Back
Elevator apt, semi-fireproof without stores
2267 ANDREWS AVENUE NORTH
BRONX · University Heights (North)-Fordham · BIN 2131117
💬 Discuss this project
2024Year Built
6Stories
D1Building Class
R7-1Zoning
18,633 sfGross Floor Area
25Units
Rent Stabilized0 Open Violations
Elevator apt, semi-fireproof without stores · Owner of record: 2267 ANDREWS AVE PROPERTY LLC · 4,988 sf lot · 3.74 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Roof52p · 1 filing · 20 docs
Floor 673p · 1 filing · 20 docs
Floor 573p · 1 filing · 20 docs
Floor 458p · 1 filing · 20 docs
Floor 381p · 1 filing · 20 docs
Floor 280p · 1 filing · 20 docs
Floor 189p · 1 filing · 20 docs
Site & exterior57p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
2267 ANDREWS AVE PROPERTY LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/21/2023$1.0M—2267 ANDREWS LTD → 2267 ANDREWS AVE PROPERTY LLC— not available
07/23/2018$150K—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NODE ARCHITECTURE,ENGINEERING, CONS1605/22/2025
GREENLITE CONSULTING CORP104/11/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NODE ENGINEERING CONSULTING3203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
L & A DEVELOPERS GROUP*General Contractor2307/08/2026
GO PRO FIRE PROTECTION CFire Protection107/08/2026
N.B.A CONSTRUCTION INCGeneral Contractor107/08/2026
NY PLUMBING & HEATING CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NODE ARCHITECTURE,ENGINEE67991305/22/2025
INTERNATIONAL GEOTEHCNICA1795705/14/2025
Building Lifecycle
All (140)Filed (17)Permit Issued (11)Signed Off (9)Violation (14)Inspection (15)Objection (44)Special Inspection (30)
08/07/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/30/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/06/2025
Signed off — New Building
New 6 Story Residential Building.
X00960081-S4
06/03/2025
Violation issued (ECB, closed)
Construction
06/02/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/22/2025
Signed off — New Building
New 6 Story Residential Building.
X00960081-S5
05/22/2025
Filed — New Building
New 6 Story Residential Building.
X00960081-P6
05/22/2025
Special inspection requirement — Fire-Resistance Rated Construction
Radomir Delic
05/17/2025
Inspection — Pass-Final SP - More than 10 Requested Floors
Pass
View inspection ↗
05/15/2025
Signed off — New Building
New 6 Story Residential Building.
X00960081-S6
05/15/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
MICHAEL KARANTINIDIS, P.E.
05/15/2025
Special inspection requirement — Mechanical Systems
MICHAEL KARANTINIDIS, P.E.
05/15/2025
Special inspection requirement — Shutoff dampers
Radomir Delic
05/15/2025
Special inspection requirement — Energy Code Compliance Inspections
Radomir Delic
05/15/2025
Special inspection requirement — Maintenance information
MICHAEL KARANTINIDIS, P.E.
05/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Radomir Delic
05/15/2025
Special inspection requirement — Fire-Resistance Rated Construction
Radomir Delic
05/15/2025
Special inspection requirement — HVAC-R and service water heating equipment
Radomir Delic
05/15/2025
Special inspection requirement — Final
Radomir Delic
05/15/2025
Special inspection requirement — HVAC-R and service water heating system controls
MICHAEL KARANTINIDIS, P.E.
05/14/2025
Filed — New Building
New 6 Story Residential Building.
X00960081-P7
05/13/2025
Special inspection requirement — Final
Radomir Delic
05/13/2025
Special inspection requirement — Energy Code Compliance Inspections
Radomir Delic
05/13/2025
Special inspection requirement — Mechanical Systems
MICHAEL KARANTINIDIS, P.E.
05/13/2025
Special inspection requirement — Maintenance information
MICHAEL KARANTINIDIS, P.E.
05/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Radomir Delic
05/13/2025
Special inspection requirement — HVAC-R and service water heating equipment
Radomir Delic
05/13/2025
Special inspection requirement — Fire-Resistance Rated Construction
Radomir Delic
05/13/2025
Special inspection requirement — HVAC-R and service water heating system controls
MICHAEL KARANTINIDIS, P.E.
05/13/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
MICHAEL KARANTINIDIS, P.E.
05/13/2025
Special inspection requirement — Shutoff dampers
Radomir Delic
05/05/2025
Special inspection requirement — Air barrier — testing
Radomir Delic
05/05/2025
Special inspection requirement — Exterior lighting power
Radomir Delic
05/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Radomir Delic
05/05/2025
Special inspection requirement — Maintenance information
Radomir Delic
05/05/2025
Special inspection requirement — Interior lighting power
Radomir Delic
05/05/2025
Special inspection requirement — Metering
Radomir Delic
05/05/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Radomir Delic
05/05/2025
Special inspection requirement — Insulation placement and R values
Radomir Delic
05/05/2025
Special inspection requirement — Protection of exposed foundation insulation
Radomir Delic
04/18/2025
Objection resolved — Addressed
04/16/2025
Signed off — New Building
New 6 Story Residential Building.
X00960081-S7
04/09/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
04/04/2025
Objection raised — Mechanical
03/27/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/26/2025
Objection resolved — Addressed
03/20/2025
Objection raised — Other
03/17/2025
Permit issued — Sprinklers
X00960081-S5-EW-SP
03/14/2025
Violation issued (ECB, closed)
Construction
03/13/2025
Filed — New Building
New 6 Story Residential Building.
X00960081-P5
03/03/2025
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
02/05/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/27/2025
Permit issued — Curb Cut
X00960081-S7-CC
01/22/2025
Permit issued — Mechanical Systems
X00960081-S6-MS
01/03/2025
Signed off — Alteration
CONSTRUCTION FENCE WORK FOR FULL DEMOLITION AND NEW CONSTRUCTION PURPOSES
X00958937-I1
12/13/2024
Violation issued (ECB, closed)
Construction
12/05/2024
Filed — New Building
New 6 Story Residential Building.
X00960081-P4
12/04/2024
Permit issued — General Construction
X00960081-I1-GC
11/19/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/16/2024
Signed off — Alteration
Filing is for temporary sidewalk shed. No change in use, occupancy or egress.
X01031841-I1
Latest 60 of 140 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offGO PRO FIRE PROTECTION C03/17/2025
DOB NOWCurb CutSigned-offL A DEVELOPERS GROUP*01/27/2025
DOB NOWMechanical SystemsSigned-offL A DEVELOPERS GROUP*01/22/2025
DOB NOWGeneral ConstructionPermit IssuedL A DEVELOPERS GROUP*12/04/2024
DOB NOWStructuralSigned-offL A DEVELOPERS GROUP*05/15/2024
DOB NOWGeneral ConstructionPermit IssuedL A DEVELOPERS GROUP*05/14/2024
DOB NOWSidewalk ShedSigned-offN.B.A CONSTRUCTION INC04/15/2024
DOB NOWGeneral ConstructionPermit IssuedL A DEVELOPERS GROUP*04/09/2024
DOB NOWPlumbingSigned-offNY PLUMBING & HEATING COR03/20/2024
DOB NOWFoundationSigned-offL A DEVELOPERS GROUP*03/15/2024
DOB NOWConstruction FenceSigned-offL A DEVELOPERS GROUP*11/22/2023
1 project · most recent 05/22/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
05/22/2025Signed-offL & A DEVELOPERS GROUP*Heating and Air Conditioning Systems
Heat / Cool
General Electric AZ65H09D 9,600 BTU · Ptac ×56
AZ65H07D 6,900 BTU · Ptac ×30
1 project · most recent 05/22/2025
Storm Water/Sanitary
FiledStatusContractorScope
05/22/2025Signed-offNY PLUMBING & HEATING CORStorm, Water/Sanitary
2 projects · most recent 08/20/2024
General Wiring
FiledStatusContractorScope
08/20/2024CompleteSOLID STATE ELECTRIC LLCGeneral Wiring
04/17/2024CompleteLIT MODE ELECL CONTG INC—
1 project · most recent 05/22/2025
Concrete Masonry
FiledStatusContractorScope
05/22/2025Signed-offGO PRO FIRE PROTECTION CConcrete, Masonry
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
08/07/2025Pass-Final CND-Occupancy InspectionPassView ↗
06/30/2025Pass-Final CND-Occupancy InspectionPassView ↗
06/02/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/17/2025Pass-Final SP - More than 10 Requested FloorsPassView ↗
04/09/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
03/27/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/03/2025Fail-Final Curb Cut Non-Directive 14FailView ↗
02/05/2025Pass-Final CND-Occupancy InspectionPassView ↗
11/19/2024Pass-Final CND-Occupancy InspectionPassView ↗
09/13/2024Pass-Final CND-Occupancy InspectionPassView ↗
09/05/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
09/05/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/08/2024Pass-Final CND-Occupancy InspectionPassView ↗
04/02/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
04/02/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 67
DateRequirementInspectorRole
05/22/2025Fire-Resistance Rated ConstructionRadomir Delicprogress
05/15/2025Fire-Resistant Penetrations and JointsRadomir Delicspecial
05/15/2025Energy Code Compliance InspectionsRadomir Delicprogress
05/15/2025FinalRadomir Delicprogress
05/15/2025Fire-Resistance Rated ConstructionRadomir Delicprogress
05/15/2025Maintenance informationMICHAEL KARANTINIDIS, P.E.energy_progress
05/15/2025HVAC-R and service water piping design and insulationMICHAEL KARANTINIDIS, P.E.energy_progress
05/15/2025HVAC-R and service water heating system controlsMICHAEL KARANTINIDIS, P.E.energy_progress
05/15/2025Shutoff dampersRadomir Delicenergy_progress
05/15/2025HVAC-R and service water heating equipmentRadomir Delicenergy_progress
05/15/2025Mechanical SystemsMICHAEL KARANTINIDIS, P.E.special
05/13/2025Mechanical SystemsMICHAEL KARANTINIDIS, P.E.special
05/13/2025Energy Code Compliance InspectionsRadomir Delicprogress
05/13/2025FinalRadomir Delicprogress
05/13/2025Fire-Resistance Rated ConstructionRadomir Delicprogress
05/13/2025Maintenance informationMICHAEL KARANTINIDIS, P.E.energy_progress
05/13/2025Shutoff dampersRadomir Delicenergy_progress
05/13/2025HVAC-R and service water piping design and insulationMICHAEL KARANTINIDIS, P.E.energy_progress
05/13/2025HVAC-R and service water heating system controlsMICHAEL KARANTINIDIS, P.E.energy_progress
05/13/2025HVAC-R and service water heating equipmentRadomir Delicenergy_progress
05/13/2025Fire-Resistant Penetrations and JointsRadomir Delicspecial
05/05/2025Protection of exposed foundation insulationRadomir Delicenergy_progress
05/05/2025Exterior Insulation and Finish Systems (EIFS)Radomir Delicspecial
05/05/2025Fire-Resistant Penetrations and JointsRadomir Delicspecial
05/05/2025Air barrier — testing Radomir Delicenergy_progress
Latest 25 of 67.
▾Documents — 135 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch17
08/22/2026X00958937-I1Request digital key ↗
08/22/2026X00956680-I1Request digital key ↗
08/21/2026X01031841-I1Request digital key ↗
Showing 3 of 17 on file for this type
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
10/15/2024240358992Open ↗
▸Zoning, Tax Lot & Property Records9
▸DOB NOWZD1: DOB Zoning Diagram4
08/13/2026X00960081-I1Open ↗
08/13/2026X00960081-P3Open ↗
08/13/2026X00960081-P5Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZoning Exhibit form (1-5)4
08/13/2026X00960081-P3Open ↗
08/13/2026X00960081-P5Open ↗
08/13/2026X00960081-P6Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026X00960081-I1Open ↗
▸Seals & Professional Certifications69
▸DOB NOWProgress Inspector Seal & Signature33
09/02/2026X00960081-P6Open ↗
09/02/2026X00960081-P6Open ↗
09/02/2026X00960081-P6Open ↗
Showing 3 of 33 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature19
09/02/2026X00960081-P6Open ↗
09/02/2026X00960081-P6Open ↗
09/01/2026X00960081-S3Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature17
08/22/2026X00958937-I1Open ↗
08/19/2026X00960081-I1Open ↗
08/19/2026X00960081-P7Open ↗
Showing 3 of 17 on file for this type
▸Trade Schedules & Equipment8
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/13/2026X00960081-I1Open ↗
08/13/2026X00960081-P3Open ↗
08/13/2026X00960081-P6Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWGas Cut-Off1
08/13/2026X00956680-I1Open ↗
▸DOB NOWElectric Cut-Off1
08/13/2026X00956680-I1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026X00956680-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/13/2026X00956680-I1Open ↗
▸Safety & Tenant Protection9
▸DOB NOWStreet Tree Checklist4
08/13/2026X00960081-P6Open ↗
08/13/2026X00960081-P5Open ↗
08/13/2026X00960081-P3Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREES SITE PLAN1
04/24/2025240358992Open ↗
▸BISSTREET TREE SIGNOFF1
04/24/2025240358992Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026X00960081-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026X00960081-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026X00960081-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWRodent Control1
08/13/2026X00956680-I1Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026X00956680-I1Open ↗
▸Energy Compliance2
▸DOB NOWPreliminary Commissioning Report Certification2
08/13/2026X00960081-S4Open ↗
08/13/2026X00960081-S6Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCURB CUT (CC) SIGNOFF1
04/24/2025240358992Open ↗
▸Other Documents17
▸DOB NOWProperty Ownership Certification5
08/19/2026X00960081-P6Open ↗
08/19/2026X00960081-I1Open ↗
08/15/2026X00960081-P3Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSite Survey: Initial4
08/13/2026X00960081-I1Open ↗
08/13/2026X00960081-P3Open ↗
08/13/2026X00960081-P5Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/13/2026X00960081-I1Open ↗
08/13/2026X00960081-P3Open ↗
08/13/2026X00960081-P5Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026X00956680-I1Open ↗
▸DOB NOWStructure Photographs1
08/13/2026X00956680-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026X00960081-I1Open ↗
▸DOB NOWCommunity Board Notification1
08/13/2026X00956680-I1Open ↗