← Back
BuildNYC
One story - permanent living quarter
227-15 67TH AVENUE
QUEENS · BIN 4163327
💬 Discuss this project
1954Year Built
1Stories
A2Building Class
R3XZoning
1,500 sfGross Floor Area
1Units
0 Active ViolationsFDNY Report ↗
One story - permanent living quarter · 6,000 sf lot · 0.25 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalPlumbingEquipmentCivil
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofSolar energy system installation1p · 1 filing · 8 docs
AtticUnder Construction3p · 1 filing · 20 docs
Floor 2Under Construction8p · 2 filings · 20 docs
Floor 1New two familyUnder Construction9p · 3 filings · 20 docs
CellarUnder Construction9p · 2 filings · 20 docs
Site & exteriorConstruction fence projectUnder Construction9p · 3 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/14/2022$1.3M—195 GARDEN LLC → Private party$867/sf building
03/27/2018$1.2M—— → —$807/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Brian Ill Development504/27/2026
Synergic Design Architects110/24/2025
Ameriland Brook205/21/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Ameriland Brook603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
L&L Construction DevelopmentGeneral Contractor807/22/2026
Primrose ServiceGeneral Contractor303/21/2026
Accord PowerGeneral Contractor204/09/2026
Village P & H NYPlumbing209/17/2026
HT BuildsScaffold107/14/2026
Primrose ServiceScaffold104/09/2026
Plumbing NYCPlumbing107/08/2026
Home Style Improvements *Scaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Brian Ill Development1402203/15/2026
Synergic Design8561110/24/2025
Ameriland Brook1506102/02/2025
Building Lifecycle
All (73)Filed (8)Permit Issued (13)Signed Off (2)Violation (8)Inspection (2)Objection (10)Special Inspection (30)
09/16/2026
Permit issued — Plumbing
Q01175162-S1-PL
08/14/2026
Signed off — Alteration
Installation of 11.88 kw solar energy system on roof. No change of occupancy, use or egress.
Q01306967-I1
07/20/2026
Permit issued — Foundation
Q01175162-I1-GC
07/13/2026
Permit issued — Construction Fence
Q01175193-I1-FN
04/27/2026
Filed — Alteration
INSTALL 10' DROP CURB WITH 1'-6" SPLAYS ON BOTH SIDE.
Q01256490-I1
03/16/2026
Special inspection requirement — HVAC-R and service water heating system controls
BRIAN ILL
03/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
BRIAN ILL
03/16/2026
Special inspection requirement — Energy Code Compliance Inspections
BRIAN ILL
03/16/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
BRIAN ILL
03/16/2026
Special inspection requirement — Maintenance information
BRIAN ILL
03/16/2026
Special inspection requirement — HVAC-R and service water heating equipment
BRIAN ILL
03/15/2026
Filed — New Building
INSTALL 10' DROP CURB WITH 1'-6" SPLAYS ON BOTH SIDE.
Q01175162-P1
03/03/2026
Permit issued — Solar
Q01306967-I1-SL
01/15/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
01/15/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/12/2026
Permit issued — Plumbing
Q32235931-S1-PL
12/02/2025
Violation issued (ECB, closed)
Construction
10/27/2025
Permit issued — Solar
Q01306967-I1-SL
10/24/2025
Filed — Alteration
Installation of 11.88 kw solar energy system on roof. No change of occupancy, use or egress.
Q01306967-I1
10/22/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Malathi Ananthakrishnan
10/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Malathi Ananthakrishnan
10/22/2025
Special inspection requirement — Energy Code Compliance Inspections
Malathi Ananthakrishnan
10/22/2025
Special inspection requirement — Final
Malathi Ananthakrishnan
10/22/2025
Special inspection requirement — Air barrier - visual inspection
Malathi Ananthakrishnan
08/05/2025
Violation issued (ECB, closed)
Site Safety
08/05/2025
Violation issued (ECB, closed)
Construction
08/05/2025
Violation issued (ECB, closed)
Construction
08/05/2025
Violation issued (ECB, closed)
Unknown
08/05/2025
Violation issued (ECB, closed)
Construction
08/05/2025
Violation issued (ECB, closed)
Unknown
08/05/2025
Violation issued (ECB, closed)
Unknown
07/30/2025
Signed off — Full Demolition
DEMOLITION OF EXISTING ONE STORY BRICK AND FRAME HOUSE
Q01224649-I1
07/22/2025
Permit issued — Plumbing
Q01175162-S1-PL
07/17/2025
Permit issued — Structural
Q01175162-I1-GC
07/17/2025
Permit issued — Foundation
Q01175162-I1-ST
07/17/2025
Permit issued — Earth Work
Q01175162-I1-FO-EA
07/14/2025
Permit issued — Construction Fence
Q01175193-I1-FN
07/11/2025
Permit issued — Full Demolition
Q01224649-I1-FD
07/01/2025
Permit issued — Construction Fence
Q01175193-I1-FN
06/05/2025
Objection resolved — Addressed
06/02/2025
Objection raised — Admin
05/21/2025
Filed — Full Demolition
DEMOLITION OF EXISTING ONE STORY BRICK AND FRAME HOUSE
Q01224649-I1
05/21/2025
Objection resolved — Addressed
04/18/2025
Objection resolved — Addressed
04/16/2025
Objection resolved — Addressed
03/21/2025
Objection resolved — Addressed
02/18/2025
Objection raised — Plumbing
02/18/2025
Objection raised — Scope
02/18/2025
Objection raised — Energy
02/18/2025
Objection raised — Scope
02/11/2025
Special inspection requirement — Electric vehicle service equipment requirements
XIAOHONG ZHAO
02/02/2025
Filed — New Building
INSTALL 10' DROP CURB WITH 1'-6" SPLAYS ON BOTH SIDE.
Q01175162-S3
02/02/2025
Filed — New Building
INSTALL 10' DROP CURB WITH 1'-6" SPLAYS ON BOTH SIDE.
Q01175162-S1
02/02/2025
Filed — New Building
INSTALL 10' DROP CURB WITH 1'-6" SPLAYS ON BOTH SIDE.
Q01175162-I1
02/02/2025
Filed — Alteration
Q01175193-I1
02/02/2025
Special inspection requirement — Footing and Foundation
XIAOHONG ZHAO
02/02/2025
Special inspection requirement — Energy Code Compliance Inspections
XIAOHONG ZHAO
02/02/2025
Special inspection requirement — Fire-Resistance Rated Construction
XIAOHONG ZHAO
02/02/2025
Special inspection requirement — Structural Wood Frame
XIAOHONG ZHAO
02/02/2025
Special inspection requirement — Duct leakage testing, insulation and design
XIAOHONG ZHAO
Latest 60 of 73 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedVillage P & H NY09/16/2026
DOB NOWFoundationPermit IssuedL&L Construction Development07/20/2026
DOB NOWConstruction FencePermit IssuedHT Builds07/13/2026
DOB NOWSolarSigned-offAccord Power03/03/2026
DOB NOWPlumbingPermit IssuedPlumbing Works NYC01/12/2026
DOB NOWSolarSigned-offAccord Power10/27/2025
DOB NOWPlumbingPermit IssuedVillage P & H NY07/22/2025
DOB NOWStructuralPermit IssuedL&L Construction Development07/17/2025
DOB NOWFoundationPermit IssuedL&L Construction Development07/17/2025
DOB NOWEarth WorkPermit IssuedL&L Construction Development07/17/2025
DOB NOWConstruction FencePermit IssuedPrimrose Service07/14/2025
DOB NOWFull DemolitionSigned-offPrimrose Service07/11/2025
DOB NOWConstruction FencePermit IssuedHome Style Improvements *07/01/2025
1 project · most recent 03/15/2026
Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
03/15/2026Permit IssuedL&L Construction DevelopmentHeating Systems
Heating
Rheem PROPE50 M2 RH92 CS 48,000 BTU · Water Heater ×2
1 project · most recent 03/15/2026
Storm Water/Sanitary
FiledStatusContractorScope
03/15/2026Permit IssuedParamount ServicesStorm, Water/Sanitary
3 projects · most recent 01/09/2026
General Wiring
FiledStatusContractorScope
01/09/2026Permit IssuedRobin Electrical CoGeneral Wiring
10/27/2025CompleteAccord Power Electric—
08/26/2025Permit IssuedRobin Electrical Co—
1 project · most recent 03/15/2026
Steel Concrete Masonry Wood
FiledStatusContractorScope
03/15/2026Permit IssuedParamount ServicesSteel, Concrete, Masonry, Wood
1 project · most recent 10/24/2025
FiledStatusContractorScope
10/24/2025Signed-offAccord Power27 panels, 11.88 kw, 2,654.04 roof_area_sqft
1 project · most recent 03/15/2026
Earthwork
FiledStatusContractorScope
03/15/2026Permit IssuedParamount ServicesEarthwork
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
01/15/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
01/15/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 42
DateRequirementInspectorRole
03/16/2026HVAC-R and service water heating system controlsBRIAN ILLenergy_progress
03/16/2026Fire-Resistant Penetrations and JointsBRIAN ILLspecial
03/16/2026Energy Code Compliance InspectionsBRIAN ILLprogress
03/16/2026HVAC-R and service water piping design and insulationBRIAN ILLenergy_progress
03/16/2026Maintenance informationBRIAN ILLenergy_progress
03/16/2026HVAC-R and service water heating equipmentBRIAN ILLenergy_progress
10/22/2025Structural Stability – Alterations of existing buildingsMalathi Ananthakrishnanspecial
10/22/2025Fire-Resistant Penetrations and JointsMalathi Ananthakrishnanspecial
10/22/2025Energy Code Compliance InspectionsMalathi Ananthakrishnanprogress
10/22/2025FinalMalathi Ananthakrishnanprogress
10/22/2025Air barrier - visual inspectionMalathi Ananthakrishnanenergy_progress
02/11/2025Electric vehicle service equipment requirementsXIAOHONG ZHAOenergy_progress
02/02/2025Footing and FoundationXIAOHONG ZHAOprogress
02/02/2025Energy Code Compliance InspectionsXIAOHONG ZHAOprogress
02/02/2025Fire-Resistance Rated ConstructionXIAOHONG ZHAOprogress
02/02/2025Structural Wood FrameXIAOHONG ZHAOprogress
02/02/2025Duct leakage testing, insulation and designXIAOHONG ZHAOenergy_progress
02/02/2025Air barrier — testing XIAOHONG ZHAOenergy_progress
02/02/2025Fenestration areasXIAOHONG ZHAOenergy_progress
02/02/2025Insulation placement and R valuesXIAOHONG ZHAOenergy_progress
02/02/2025Air barrier - visual inspectionXIAOHONG ZHAOenergy_progress
02/02/2025HVAC-R and service water heating equipmentXIAOHONG ZHAOenergy_progress
02/02/2025Permanent certificateXIAOHONG ZHAOenergy_progress
02/02/2025HVAC-R and service water heating system controlsXIAOHONG ZHAOenergy_progress
02/02/2025Fenestration air leakageXIAOHONG ZHAOenergy_progress
Latest 25 of 42.
▾Documents — 51 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/21/2026Q01175193-I1Request digital key ↗
08/21/2026Q01175162-S3Request digital key ↗
08/21/2026Q01175162-P1Request digital key ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026Q01175162-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q01175162-I1Open ↗
▸Seals & Professional Certifications23
▸DOB NOWProgress Inspector Seal & Signature11
09/06/2026Q01175162-S1Open ↗
09/06/2026Q01175162-S1Open ↗
09/06/2026Q01175162-S1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/21/2026Q01175193-I1Open ↗
08/21/2026Q01175162-S1Open ↗
08/20/2026Q01224649-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/06/2026Q01175162-S1Open ↗
09/01/2026Q01175162-I1Open ↗
08/27/2026Q01306967-I1Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment5
▸DOB NOWElectric Cut-Off1
08/13/2026Q01224649-I1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026Q01224649-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026Q01224649-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/13/2026Q01224649-I1Open ↗
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026Q01175162-I1Open ↗
▸Safety & Tenant Protection2
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q01175162-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026Q01175162-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/20/2026Q01224649-I1Open ↗
▸DOB NOWRodent Control1
08/13/2026Q01224649-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/18/2026Q01306967-I1Open ↗
▸Other Documents8
▸DOB NOWProperty Ownership Certification2
08/20/2026Q01224649-I1Open ↗
08/13/2026Q01175162-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026Q01175162-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q01175162-I1Open ↗
▸DOB NOWCommunity Board Notification1
08/13/2026Q01224649-I1Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026Q01224649-I1Open ↗
▸DOB NOWStructure Photographs1
08/13/2026Q01224649-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026Q01175162-I1Open ↗