← Back
Two stories - detached, small or mid-size
227 CONNECTICUT STREET
STATEN ISLAND · Tottenville-Charleston · BIN 5115055
💬 Discuss this project
1994Year Built
2Stories
A1Building Class
R3XZoning
3,450 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 6,650 sf lot · 0.52 FAR built · Flood zone X
Locations of Work
ElectricalGeneral
Roof1p · 1 filing · 8 docs
Basement1p · 1 filing · 8 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC106/09/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272106/09/2025
Building Lifecycle
All (9)Filed (1)Permit Issued (1)Signed Off (1)Violation (1)Special Inspection (5)
11/05/2025
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01236258-I1
06/16/2025
Permit issued — Solar
S01236258-I1-SL
06/09/2025
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01236258-I1
06/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
06/04/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
06/04/2025
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
06/04/2025
Special inspection requirement — Final
Walid Abdulla
06/04/2025
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
03/02/1998
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC06/16/2025
1 project · most recent 06/09/2025
FiledStatusContractorScope
06/09/2025CompleteSUNRUN SOLAR ELECTL CORP—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
06/04/2025Fire-Resistant Penetrations and JointsWalid Abdullaspecial
06/04/2025Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
06/04/2025Energy Code Compliance InspectionsWalid Abdullaprogress
06/04/2025FinalWalid Abdullaprogress
06/04/2025Air barrier - visual inspectionWalid Abdullaenergy_progress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/19/2026S01236258-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/25/2026S01236258-I1Open ↗
08/25/2026S01236258-I1Open ↗
08/25/2026S01236258-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/25/2026S01236258-I1Open ↗
08/25/2026S01236258-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026S01236258-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01236258-I1Open ↗