← Back
BuildNYC
Elevator apt, semi-fireproof with stores
227 EAST 134TH STREET
BRONX · Mott Haven-Port Morris · BIN 2129675
💬 Discuss this project
2022Year Built
24Stories
D7Building Class
M1-3/R8Zoning
126,010 sfGross Floor Area
125Units
LL97 CoveredRent Stabilized0 Active Violations
Elevator apt, semi-fireproof with stores · Owner of record: E 135 and 3rd Ave Owner · 9,425 sf lot · 13.37 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentLandscapeCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsE 135 And 3rd Ave Owner8 filings
RoofE 135 And 3rd Ave Owner1 filing
Floor 25E 135 And 3rd Ave Owner1 filing · 3 docs
Floor 24E 135 And 3rd Ave Owner1 filing
Floor 23
Floor 22
Floor 21E 135 And 3rd Ave Owner1 filing
Floor 20
Floor 19
Floor 18
Floor 17
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7E 135 And 3rd Ave Owner1p · 1 filing
Floor 6
Floor 5
Floor 4
Floor 3225 East Realty Partners LLC1 filing · 2 docs
Floor 2225 East Realty Partners LLC1 filing · 2 docs
Floor 1E 135 And 3rd Ave Owner,llc1p · 2 filings
CellarE 135 And 3rd Ave Owner1p · 1 filing
Site & exteriorE 135 And 3rd Ave Owner LLC5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
E 135 3rd Ave Owner14707/08/2026
Defalco Concrete703/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Skyline1602/27/2024
Enthink Engineers1406/07/2023
Asda Architecture + Design206/05/2023
Barry Gurvitch105/22/2023
KN3 Engineering108/17/2022
Universal Builders Supply207/13/2022
HM Loke Consulting Engineering207/11/2022
Patuxent Engineering205/24/2022
PC Group203/24/2022
Valjato Engineering108/09/2021
Sullivan Group Design105/31/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM Zoning3803/21/2026
HM Loke Consulting Engineering203/21/2026
Patuxent Engineering403/21/2026
Eurocelt Expediting403/21/2026
Valjato Engineering P203/21/2026
AE Design Solution203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Andamio ScaffoldingScaffold1307/08/2026
Five Borough NYCFire Protection707/08/2026
Xolle DemoScaffold707/08/2026
City Electrical Sign ErectorsElectrical603/21/2026
Forward MechanicalPlumbing507/08/2026
Xolle DemoGeneral Contractor407/08/2026
Anthony G FerryElectrical303/22/2026
HaasGeneral Contractor303/21/2026
Service Sign Erectors CoSign hanger207/08/2026
Defalco ConstructionScaffold203/21/2026
Universal Builders SupplyScaffold103/21/2026
P-GoomScaffold107/08/2026
Star Electrical ContractorsElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Amaracon Testing & Inspec58421302/27/2024
Patuxent Engineering1893308/17/2022
Engineering Group Associates526203/24/2022
Building Lifecycle
All (219)Filed (44)Permit Issued (31)Signed Off (18)Violation (4)Inspection (16)Objection (76)Special Inspection (30)
04/25/2024
Signed off — Alteration
X01010239-I1
04/01/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/27/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/04/2024
Permit issued — Sprinklers
X01010239-I1-EW-SP
02/27/2024
Filed — Alteration
X01010239-I1
02/13/2024
Signed off — Alteration
Plumbing work as per plans filed.
X00286819-I1
01/25/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
CONNIE PISANI
01/23/2024
Filed — Alteration
Plumbing work as per plans filed.
X00286819-P5
01/09/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
CONNIE PISANI
01/04/2024
Signed off — Alteration
Boiler installation as per plans filed. No change to use egress or occupancy.
X00342404-I1
12/22/2023
Signed off — Alteration
Install combined sprinkler/standpipe system as per plans filed. No change to use, egress oroccupancy.
X00286832-I1
12/22/2023
Signed off — Alteration
Mechanical work as per plans filed.
X00286792-I1
12/21/2023
Signed off — Alteration
X00412163-I1
12/18/2023
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
12/06/2023
Signed off — Alteration
Structural work as per plans filed.
X00286771-I1
12/04/2023
Signed off — Alteration
Propose to install non-advertising sign. No change is use, egress, or occupancy.
X00884508-I1
12/04/2023
Signed off — Alteration
Propose to install non-advertising sign. No change in use, egress, or occupancy.
X00884504-I1
11/27/2023
Permit issued — Plumbing
X00286819-I1-PL
11/20/2023
Special inspection requirement — Standpipe Systems
CONNIE PISANI
11/20/2023
Special inspection requirement — Sprinkler Systems
CONNIE PISANI
11/20/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
CONNIE PISANI
11/14/2023
Filed — Alteration
Install combined sprinkler/standpipe system as per plans filed. No change to use, egress oroccupancy.
X00286832-P2
11/09/2023
Special inspection requirement — Sprinkler Systems
CONNIE PISANI
11/09/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
CONNIE PISANI
11/09/2023
Special inspection requirement — Standpipe Systems
CONNIE PISANI
10/23/2023
Signed off — Alteration
INSTALLATION OF CONSTRUCTION FENCE
X00571831-I1
09/22/2023
Signed off — Alteration
TUP filing as per Building Bulletin 2010-002
X00872985-I1
09/12/2023
Signed off — Alteration
Install temporary standpipe system during construction as per plans filed. No change to use, egress oroccupancy.
X00286842-I1
08/14/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
X00664162-I1
08/04/2023
Permit issued — Construction Fence
X00571831-I1-FN
07/21/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
07/07/2023
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
X00677382-I1
06/07/2023
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
X00664162-P7
06/07/2023
Permit issued — Sign
X00884504-I1-SG
06/07/2023
Permit issued — Sign
X00884508-I1-SG
06/05/2023
Filed — Alteration
Propose to install non-advertising sign. No change is use, egress, or occupancy.
X00884508-I1
06/05/2023
Filed — Alteration
Propose to install non-advertising sign. No change in use, egress, or occupancy.
X00884504-I1
06/05/2023
Special inspection requirement — Final
Alfonso DElia
05/25/2023
Permit issued — General Construction
X00872985-I1-GC
05/22/2023
Filed — Alteration
TUP filing as per Building Bulletin 2010-002
X00872985-I1
05/11/2023
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
05/04/2023
Signed off — Alteration
INSTALLATION OF DUAL TEMPORARY P/M HOIST FOR WORKER ACCESS DURING CONSTRUCTION FOR BOTH THE WEST 210180542 AND EAST 210180533 SIDE OF THE BUILDING. DUAL P/M HOIST COMPLIES WITH CH 33 OF THE 2014 NYC BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
X00742009-I1
05/02/2023
Permit issued — Curb Cut
X00412163-I1-CC
05/02/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/17/2023
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
04/13/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/11/2023
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
X00664162-P6
04/11/2023
Inspection — Pass-Final SD - Fire Pump
Pass
View inspection ↗
04/09/2023
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
04/03/2023
Objection resolved — Addressed
03/26/2023
Objection raised — Scope
03/23/2023
Filed — Alteration
Install combined sprinkler/standpipe system as per plans filed. No change to use, egress oroccupancy.
X00286832-P1
03/17/2023
Permit issued — Sprinklers
X00286832-I1-EW-SD
03/16/2023
Permit issued — Sprinklers
X00286832-I1-EW-SP
03/16/2023
Special inspection requirement — Heating Systems
CONNIE PISANI
03/16/2023
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
CONNIE PISANI
03/16/2023
Special inspection requirement — HVAC and service water heating system controls
CONNIE PISANI
03/16/2023
Special inspection requirement — Maintenance information
CONNIE PISANI
03/16/2023
Special inspection requirement — HVAC and service water heating equipment
CONNIE PISANI
03/16/2023
Special inspection requirement — Shutoff dampers
CONNIE PISANI
Latest 60 of 219 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offFive Borough NYC03/04/2024
DOB NOWPlumbingSigned-offForward Heating11/27/2023
DOB NOWConstruction FenceSigned-offXolle Demo08/04/2023
DOB NOWSignSigned-offService Sign Erectors Co06/07/2023
DOB NOWSignSigned-offService Sign Erectors Co06/07/2023
DOB NOWGeneral ConstructionSigned-offXolle Demo05/25/2023
DOB NOWCurb CutSigned-offXolle Demo05/02/2023
DOB NOWStandpipeSigned-offFive Borough NYC03/17/2023
DOB NOWSprinklersSigned-offFive Borough NYC03/16/2023
DOB NOWMechanical SystemsSigned-offHaas02/10/2023
DOB NOWStructuralSigned-offXolle Demo02/08/2023
DOB NOWSupported ScaffoldSigned-offAndamio Scaffolding02/07/2023
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding01/26/2023
DOB NOWBoiler EquipmentSigned-offForward Heating01/24/2023
DOB NOWPlumbingSigned-offForward Heating11/20/2022
DOB NOWProtection and Mechanical MethodsSigned-offP-Goom10/11/2022
DOB NOWStandpipeSigned-offFive Borough NYC10/05/2022
DOB NOWConstruction FenceSigned-offXolle Demo08/10/2022
DOB NOWProtection and Mechanical MethodsSigned-offAndamio Scaffolding05/23/2022
DOB NOWProtection and Mechanical MethodsSigned-offUniversal Build Supp04/25/2022
DOB NOWProtection and Mechanical MethodsSigned-offDefalco Construction04/21/2022
DOB NOWStandpipeSigned-offFive Borough NYC04/08/2022
DOB NOWSprinklersSigned-offFive Borough NYC04/08/2022
DOB NOWConstruction FenceSigned-offXolle Demo03/10/2022
DOB NOWBoiler EquipmentSigned-offForward Heating02/23/2022
DOB NOWSupported ScaffoldSigned-offAndamio Scaffolding02/14/2022
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding01/28/2022
DOB NOWPlumbingSigned-offForward Heating11/26/2021
DOB NOWStandpipeSigned-offFive Borough NYC10/14/2021
DOB NOWConstruction FenceSigned-offXolle Demo08/23/2021
DOB NOWConstruction FenceSigned-offXolle Demo08/17/2021
BIS—ISSUEDXolle Demo08/10/2023
BIS—ISSUEDXolle Demo08/10/2023
BIS—ISSUEDXolle Demo05/22/2023
BIS—ISSUEDXolle Demo12/15/2022
BIS—ISSUEDXolle Demo12/15/2022
BIS—ISSUEDXolle Demo05/27/2022
BIS—RE-ISSUEDXolle Demo05/27/2022
BIS—RE-ISSUEDXolle Demo10/26/2021
BIS—RE-ISSUEDXolle Demo10/26/2021
+ 1 more permits on file
5 projects · most recent 08/07/2023
General Wiring
FiledStatusContractorScope
08/07/2023CompleteAnthony G FerryGeneral Wiring
11/11/2022CompleteAnthony G FerryGeneral Wiring
10/07/2022CompleteStar Electrical Contractors—
05/25/2022CompleteBorowide Elect'l Contractors—
05/24/2022CompleteStar Electrical Contractors—
▾Field Inspections (DOB CAP) — 16
DateTypeResultReport
04/01/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/27/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/18/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
07/21/2023Pass-Final General Construction Non-Directive 14PassView ↗
05/11/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
04/17/2023Pass-Final SP - Up to 9 Requested FloorsPassView ↗
04/13/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/11/2023Pass-Final SD - Fire PumpPassView ↗
04/09/2023Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
03/10/2023Pass-Final Boiler Equipment InspectionPassView ↗
02/27/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/02/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
12/30/2022Pass-Final PL - More than 10 Requested FloorsPassView ↗
12/22/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/01/2022Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
06/01/2022Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 47
DateRequirementInspectorRole
01/25/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationCONNIE PISANIspecial
01/09/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationCONNIE PISANIspecial
11/20/2023Standpipe SystemsCONNIE PISANIspecial
11/20/2023Sprinkler SystemsCONNIE PISANIspecial
11/20/2023Fire-Resistant Penetrations and JointsCONNIE PISANIspecial
11/09/2023Sprinkler SystemsCONNIE PISANIspecial
11/09/2023Fire-Resistant Penetrations and JointsCONNIE PISANIspecial
11/09/2023Standpipe SystemsCONNIE PISANIspecial
06/05/2023FinalAlfonso DEliaprogress
03/16/2023Heating SystemsCONNIE PISANIspecial
03/16/2023Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)CONNIE PISANIspecial
03/16/2023HVAC and service water heating system controls CONNIE PISANIenergy_progress
03/16/2023Maintenance informationCONNIE PISANIenergy_progress
03/16/2023HVAC and service water heating equipment CONNIE PISANIenergy_progress
03/16/2023Shutoff dampersCONNIE PISANIenergy_progress
02/03/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationCONNIE PISANIspecial
01/25/2023Fire-Resistant Penetrations and JointsCONNIE PISANIspecial
01/25/2023Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)CONNIE PISANIspecial
01/25/2023Heating SystemsCONNIE PISANIspecial
01/25/2023Shutoff dampersCONNIE PISANIenergy_progress
01/25/2023HVAC and service water heating system controls CONNIE PISANIenergy_progress
01/25/2023HVAC and service water heating equipment CONNIE PISANIenergy_progress
01/25/2023Maintenance informationCONNIE PISANIenergy_progress
01/25/2023Sprinkler SystemsCONNIE PISANIspecial
01/25/2023Standpipe SystemsCONNIE PISANIspecial
Latest 25 of 47.
▾Documents — 315 on file (BIS + DOB NOW)
▸Plans & Drawings45
▸DOB NOWPlans/Sketch24
08/25/2026X00571831-I1Request digital key ↗
08/24/2026X00677382-I1Request digital key ↗
08/24/2026X00677382-P5Request digital key ↗
Showing 3 of 24 on file for this type
▸DOB NOWPlans/Sketch - Plumbing6
08/21/2026X00286819-I1Request digital key ↗
08/21/2026X00286819-P5Request digital key ↗
08/21/2026X00286819-P4Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Standpipe5
08/26/2026X00286842-I1Request digital key ↗
08/26/2026X00286832-P2Request digital key ↗
08/26/2026X00286832-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Boiler Equipment3
08/26/2026X00342404-P1Request digital key ↗
08/26/2026X00342404-I1Request digital key ↗
08/15/2026X00342404-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler3
08/26/2026X00286832-P2Request digital key ↗
08/26/2026X00286832-I1Request digital key ↗
08/15/2026X00286832-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural2
08/26/2026X00286771-P1Request digital key ↗
08/14/2026X00286771-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
08/25/2026X00412163-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/15/2026X00286792-I1Request digital key ↗
▸Applications & Permits44
▸BISPLAN / WORK APPROVAL APPLICATION31
07/24/2024210180542Open ↗
03/12/2024210180542Open ↗
09/25/2023210180542Open ↗
Showing 3 of 31 on file for this type
▸BISWORK PERMIT APPLICATION11
08/11/2023210180542Open ↗
08/11/2023210180542Open ↗
08/11/2023210180542Open ↗
Showing 3 of 11 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
06/22/2023210180542Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
04/10/2020240272110Open ↗
▸Zoning, Tax Lot & Property Records26
▸BISEASEMENT AND RESTRICTIVE DECLARATIONS - SUPPPORTING DOCUMENTATION7
10/02/2020210180542Open ↗
10/02/2020210180542Open ↗
10/02/2020210180542Open ↗
Showing 3 of 7 on file for this type
▸BISADDRESS: NEW HOUSE NUMBER APPROVED3
12/09/2024210180542Open ↗
12/09/2024210180542Open ↗
10/02/2020210180542Open ↗
▸BISZONING DIAGRAM3
12/06/2021210180542Open ↗
04/05/2021210180542Open ↗
10/02/2020210180542Open ↗
▸BISFLOOD ZONE DESIGN CERTIFICATION2
03/04/2021240272110Open ↗
10/05/2020210180542Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED2
03/04/2021240272110Open ↗
10/02/2020210180542Open ↗
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
07/31/2024240272110Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
10/02/2020210180542Open ↗
▸BISRESTRICTION: RESTRICTIVE DECLARATION1
10/02/2020210180542Open ↗
▸BISVERIFY TAX LOT1
04/24/2024210180542Open ↗
▸BISFLOOD ZONE COMPLIANCE1
12/10/2024210180542Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
11/19/2024210180542Open ↗
▸BISZONING CHALLENGE1
05/05/2021210180542Open ↗
▸BISZONING EXHIBIT IV: CERTIFICATION1
10/02/2020210180542Open ↗
▸BISZONING RESOLUTION DETERMINATION1
10/02/2020210180542Open ↗
▸Seals & Professional Certifications71
▸DOB NOWDPL-1: Design Professional Seal & Signature43
08/26/2026X00286792-I1Open ↗
08/26/2026X00342404-P1Open ↗
08/26/2026X00342404-P2Open ↗
Showing 3 of 43 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature17
09/23/2026X00342404-I1Open ↗
09/02/2026X00788032-I1Open ↗
09/01/2026X00286819-P2Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/23/2026X00342404-I1Open ↗
09/01/2026X00286792-I1Open ↗
09/01/2026X00286792-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
09/01/2021210180542Open ↗
09/01/2021210180542Open ↗
09/01/2021210180542Open ↗
Showing 3 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
04/10/2020240272110Open ↗
▸Trade Schedules & Equipment1
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
07/19/2023210180542Open ↗
▸Safety & Tenant Protection9
▸BISSTREET TREE CHECKLIST4
07/07/2021240272110Open ↗
06/09/2021240272110Open ↗
02/04/2021240272110Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREE SIGNOFF2
08/02/2024240272110Open ↗
04/24/2024210180542Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
09/01/2021210180542Open ↗
▸BISBPP: STREET TREES SITE PLAN1
03/04/2021240272110Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026X00286832-I1Open ↗
▸Energy Compliance11
▸BISPRELIMINARY COMMISSIONING REPORT CERTIFICATION2
10/28/2024210180542Open ↗
07/24/2023210180542Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
11/06/2023210180542Open ↗
▸BISFENESTRATION AREAS1
11/06/2023210180542Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
10/02/2020210180542Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
07/28/2023210180542Open ↗
▸BISLIGHTING IN DWELLING UNITS1
11/06/2023210180542Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
11/06/2023210180542Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
11/06/2023210180542Open ↗
▸BISLIGHTING CONTROLS1
11/06/2023210180542Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
09/01/2021210180542Open ↗
▸Inspections & Test Reports20
▸BISTECHNICAL REPORT: RESPONSIBILITY9
02/08/2023210180542Open ↗
02/08/2023210180542Open ↗
05/26/2022210180542Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER4
07/14/2023210180542Open ↗
07/14/2023210180542Open ↗
07/14/2023210180542Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
02/17/2022210180542Open ↗
10/27/2021210180542Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
07/18/2023210180542Open ↗
▸BISWALL PANELS, CURTAIN WALLS, AND VENEERS1
09/26/2023210180542Open ↗
▸BISTECHNICAL REPORT: PILE DRIVING1
04/08/2022210180542Open ↗
▸BISSOIL REPORT1
10/02/2020210180542Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
10/02/2020210180542Open ↗
▸Approvals, Objections & Sign-offs25
▸BISSCHEDULE A - OCCUPANCY / USE15
07/24/2024210180542Open ↗
03/12/2024210180542Open ↗
03/07/2023210180542Open ↗
Showing 3 of 15 on file for this type
▸BISSUPERSEDING LETTER4
08/11/2023210180542Open ↗
05/31/2022210180542Open ↗
05/31/2022210180542Open ↗
Showing 3 of 4 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION2
08/11/2023210180542Open ↗
10/02/2020210180542Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
10/27/2021210180542Open ↗
10/27/2021210180542Open ↗
▸BISBSA/CPC APPROVAL1
10/02/2020210180542Open ↗
▸BISNYS DEC TIDAL WETLANDS APPROVAL1
10/02/2020210180542Open ↗
▸Filing & Intake Forms25
▸BISADDITIONAL INFORMATION17
08/21/2024210180542Open ↗
07/14/2023210180542Open ↗
03/06/2023210180542Open ↗
Showing 3 of 17 on file for this type
▸BISBOROUGH INTAKE FORM5
08/11/2023210180542Open ↗
05/31/2022210180542Open ↗
10/27/2021210180542Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING COVER SHEET2
12/31/2019210180542Open ↗
12/31/2019210180542Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
04/10/2020240272110Open ↗
▸Other Documents21
▸DOB NOWFEMA Elevation Certificate (086-0-33)/Flood Proofing Certificate (086-0-34)6
08/13/2026X00286792-I1Open ↗
08/13/2026X00342404-I1Open ↗
08/13/2026X00286842-I1Open ↗
Showing 3 of 6 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION4
06/09/2021240272110Open ↗
06/09/2021240272110Open ↗
06/09/2021240272110Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLowest Floor Elevation Plan4
08/26/2026X00342404-I1Open ↗
08/26/2026X00286842-I1Open ↗
08/26/2026X00286832-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPLOT DIAGRAM2
03/29/2021210180542Open ↗
10/02/2020210180542Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
03/04/2021240272110Open ↗
▸BISEXTERIOR INSULATION AND FINISH SYSTEMS (EIFS) (2014)1
11/06/2023210180542Open ↗
▸BISVESTIBULES1
11/06/2023210180542Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
07/28/2023210180542Open ↗
▸BISFEMA ELEVATION CERT (086-0-33)/ FLOODPROOFING CERT (086-0-34)1
07/14/2023210180542Open ↗