← Back
Walk-up cooperative
227 EAST 14 STREET
MANHATTAN · Gramercy · BIN 1019506
💬 Discuss this project
1900Year Built
5Stories
C6Building Class
C1-6AZoning
11,935 sfGross Floor Area
11Units
Rent Stabilized24 Open Violations ▸FDNY Report ↗
Walk-up cooperative · Owner of record: 227-229 E 14TH ST HDFC · 2,943 sf lot · 4.06 FAR built · Flood zone X
Locations of Work
ArchitectureEquipment
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 1 filing · 10 docs
BulkheadUnder Construction1p · 1 filing · 10 docs
Cellar2p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
227-229 HDFC807/08/2026
227-229 EAST 14TH STREET HDFC403/22/2026
227-229 E 14TH STREET HDFC1103/22/2026
HPD103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CLIP ARCHITECTS304/01/2025
RIGID STRUCTURAL DESIGN, LLC204/02/2024
MCCRAY ARCHITECT P.C.104/08/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Rigid Structural Design, LLC203/21/2026
WM ARCH603/21/2026
BASIC GROUPS203/21/2026
RIGGING CONSULTANTS403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
STALLION CONSTRUCTION NYGeneral Contractor303/21/2026
HTC CONSTRUCTION MANAGEMENTGeneral Contractor204/09/2026
FINELLI, NICOLAElectrical103/21/2026
HIGH QUALITY ELECTRIC OFElectrical103/22/2026
LEHMAN, DElectrical103/21/2026
MORRISON, NATHANElectrical103/21/2026
ROMA IRON WORKERS INCElectrical103/21/2026
SIERRA, HERIBERTOElectrical103/21/2026
CEPRINE CONSTRUCTION INCGeneral Contractor107/08/2026
ALEXANDER EUGENEElectrical103/21/2026
ARCO PLBG AND HTG INCPlumbing107/08/2026
CHEUNG, KEUNGElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NKM ENGINEERING PLLC6244204/01/2025
PCS ENGINEERING3745204/29/2024
M. INT'L ENGINEERING PLLC3129104/08/2022
Building Lifecycle
All (77)Filed (8)Permit Issued (7)Signed Off (4)Violation (34)Inspection (2)Special Inspection (22)
03/11/2026
Signed off — Alteration
EXISTING APARTMENT #5W ON 5TH FLOOR WITH INTERIOR RENOVATION ON PARTITION WORK. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY.
M01193853-S1
03/11/2026
Signed off — Alteration
EXISTING APARTMENT #5W ON 5TH FLOOR WITH INTERIOR RENOVATION ON PARTITION WORK. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY.
M01193853-I1
01/12/2026
Signed off — Alteration
EXISTING APARTMENT #5W ON 5TH FLOOR WITH INTERIOR RENOVATION ON PARTITION WORK. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY.
M01193853-S2
11/17/2025
Violation issued (HPD, closed)
I
09/11/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/03/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/10/2025
Permit issued — Plumbing
M01193853-S1-PL
04/08/2025
Permit issued — Mechanical Systems
M01193853-S2-MS
04/08/2025
Permit issued — General Construction
M01193853-I1-GC
04/01/2025
Filed — Alteration
EXISTING APARTMENT #5W ON 5TH FLOOR WITH INTERIOR RENOVATION ON PARTITION WORK. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY.
M01193853-S1
04/01/2025
Filed — Alteration
EXISTING APARTMENT #5W ON 5TH FLOOR WITH INTERIOR RENOVATION ON PARTITION WORK. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY.
M01193853-I1
04/01/2025
Filed — Alteration
EXISTING APARTMENT #5W ON 5TH FLOOR WITH INTERIOR RENOVATION ON PARTITION WORK. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY.
M01193853-S2
04/01/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Jaeyoung Jang
03/31/2025
Special inspection requirement — Lighting controls
Jaeyoung Jang
03/31/2025
Special inspection requirement — Metering
Jaeyoung Jang
03/31/2025
Special inspection requirement — Lighting in dwelling units
Jaeyoung Jang
03/31/2025
Special inspection requirement — Interior lighting power
Jaeyoung Jang
03/31/2025
Special inspection requirement — Energy Code Compliance Inspections
Jaeyoung Jang
03/31/2025
Special inspection requirement — Mechanical Systems
NARESH MAHANGU
03/31/2025
Special inspection requirement — Heating Systems
NARESH MAHANGU
03/31/2025
Special inspection requirement — Final
Jaeyoung Jang
03/31/2025
Special inspection requirement — Energy Code Compliance Inspections
Jaeyoung Jang
03/31/2025
Special inspection requirement — HVAC-R and service water heating equipment
Jaeyoung Jang
03/31/2025
Special inspection requirement — Maintenance information
Jaeyoung Jang
03/31/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Jaeyoung Jang
03/31/2025
Special inspection requirement — HVAC-R and service water heating system controls
Jaeyoung Jang
03/31/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
03/31/2025
Special inspection requirement — Final
Jaeyoung Jang
03/31/2025
Special inspection requirement — Energy Code Compliance Inspections
Jaeyoung Jang
03/31/2025
Special inspection requirement — Fire-Resistance Rated Construction
Jaeyoung Jang
10/01/2024
Signed off — Alteration
Installation of temporary heavy duty sidewalk shed with designated area for storage of material (not to exceed 150 PSF) per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with application.
M01010217-I1
05/09/2024
Permit issued — Suspended Scaffold
M01015800-P1-SC
05/09/2024
Special inspection requirement — Post-installed Anchors
Michael Walsh
05/09/2024
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Michael Walsh
04/29/2024
Filed — Alteration
Facade Restoration
M01015800-P1
04/29/2024
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Michael Walsh
04/29/2024
Special inspection requirement — Post-installed Anchors
Michael Walsh
04/03/2024
Permit issued — Suspended Scaffold
M01015800-I1-SC
04/02/2024
Filed — Alteration
Installation of temporary heavy duty sidewalk shed with designated area for storage of material (not to exceed 150 PSF) per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with application.
M01010217-P1
03/21/2024
Filed — Alteration
Facade Restoration
M01015800-I1
03/18/2024
Permit issued — Sidewalk Shed
M01010217-I1-SH
03/15/2024
Filed — Alteration
Installation of temporary heavy duty sidewalk shed with designated area for storage of material (not to exceed 150 PSF) per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with application.
M01010217-I1
11/02/2022
Violation issued (HPD, closed)
I
07/05/2022
Permit issued — General Construction
M00711730-I1-GC
04/08/2022
Filed — Alteration
M00711730-I1
02/15/2022
Violation issued (HPD, closed)
I
02/15/2022
Violation issued (HPD, closed)
A
11/08/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/24/2016
Violation issued (HPD, closed)
I
08/20/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/01/2015
Violation issued (HPD, closed)
I
05/04/1998
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/30/1991
Violation issued (HPD, open)
A
01/30/1991
Violation issued (HPD, open)
B
01/30/1991
Violation issued (HPD, open)
B
01/30/1991
Violation issued (HPD, open)
B
01/30/1991
Violation issued (HPD, open)
A
01/30/1991
Violation issued (HPD, open)
B
01/30/1991
Violation issued (HPD, open)
B
01/25/1991
Violation issued (HPD, open)
B
Latest 60 of 77 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offARCO PLBG AND HTG INC06/10/2025
DOB NOWMechanical SystemsSigned-offHTC CONSTRUCTION MANAGEME04/08/2025
DOB NOWGeneral ConstructionSigned-offHTC CONSTRUCTION MANAGEME04/08/2025
DOB NOWSuspended ScaffoldPermit IssuedAPPLE REST & WTRPFNG INC05/09/2024
DOB NOWSuspended ScaffoldPermit IssuedAPPLE REST & WTRPFNG INC04/03/2024
DOB NOWSidewalk ShedSigned-offCEPRINE CONSTRUCTION INC03/18/2024
DOB NOWGeneral ConstructionPermit IssuedSTALLION CONSTRUCTION NY07/05/2022
BISOTISSUEDT&S HOME IMPROVEMENT INC10/19/2016
BISOTISSUEDPONDOSA INC06/20/2016
BISPLISSUEDTOP DOG PLBG & HTG CORP06/08/2016
BISMHISSUEDPONDOSA INC05/06/2016
BISOTISSUEDPONDOSA INC05/05/2016
BISPLISSUEDLLOYD G DRUMMOND PLBG&GEN02/18/2016
BISEQISSUEDKINGS STAR CONSTRUCTION C02/16/2016
BISOTISSUEDKINGS STAR CONSTRUCTION C02/16/2016
BISEQISSUEDDAVID TURNER ARCHITECT,PC03/13/2007
BISOTISSUEDDAVID TURNER ARCHITECT,PC03/13/2007
BISBLISSUEDAPPROVED OIL CO OF BKLYN03/09/1995
2 projects · most recent 05/22/2024
FiledStatusContractorScope
05/22/2024CompleteHIGH QUALITY ELECTRIC OF—
03/07/2024CompleteBOROWIDE ELECT'L CONTR'S—
1 project · most recent 04/29/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
04/29/2024Permit Issued—Suspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
09/11/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/03/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
04/01/2025HVAC-R and service water piping design and insulationJaeyoung Jangenergy_progress
03/31/2025Lighting controlsJaeyoung Jangenergy_progress
03/31/2025MeteringJaeyoung Jangenergy_progress
03/31/2025Lighting in dwelling unitsJaeyoung Jangenergy_progress
03/31/2025Interior lighting powerJaeyoung Jangenergy_progress
03/31/2025Energy Code Compliance InspectionsJaeyoung Jangprogress
03/31/2025Mechanical SystemsNARESH MAHANGUspecial
03/31/2025Heating SystemsNARESH MAHANGUspecial
03/31/2025FinalJaeyoung Jangprogress
03/31/2025Energy Code Compliance InspectionsJaeyoung Jangprogress
03/31/2025HVAC-R and service water heating equipmentJaeyoung Jangenergy_progress
03/31/2025Maintenance informationJaeyoung Jangenergy_progress
03/31/2025HVAC-R and service water piping design and insulationJaeyoung Jangenergy_progress
03/31/2025HVAC-R and service water heating system controlsJaeyoung Jangenergy_progress
03/31/2025Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
03/31/2025FinalJaeyoung Jangprogress
03/31/2025Energy Code Compliance InspectionsJaeyoung Jangprogress
03/31/2025Fire-Resistance Rated ConstructionJaeyoung Jangprogress
05/09/2024Post-installed AnchorsMichael Walshspecial
05/09/2024Alternative Materials - OTCR Buildings Bulletin NumberMichael Walshspecial
04/29/2024Alternative Materials - OTCR Buildings Bulletin NumberMichael Walshspecial
04/29/2024Post-installed AnchorsMichael Walshspecial
▾Documents — 72 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
09/02/2026M00711730-I1Request digital key ↗
08/27/2026M01010217-P1Request digital key ↗
08/27/2026M01010217-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits14
▸BISWORK PERMIT APPLICATION8
10/24/2016122678450Open ↗
06/19/2016140510891Open ↗
06/14/2016122774916Open ↗
Showing 3 of 8 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION5
06/19/2016140510891Open ↗
05/09/2016122774916Open ↗
04/26/2016122678450Open ↗
Showing 3 of 5 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
03/01/2016122678450Open ↗
▸Seals & Professional Certifications26
▸DOB NOWSpecial Inspector Seal & Signature7
09/25/2026M01193853-S2Open ↗
09/25/2026M01193853-S2Open ↗
08/29/2026M01015800-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/25/2026M01193853-S2Open ↗
09/25/2026M01193853-S2Open ↗
09/01/2026M01193853-S1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/02/2026M00711730-I1Open ↗
08/13/2026M01010217-P1Open ↗
08/13/2026M01010217-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
05/16/2016122774916Open ↗
02/16/2016122678450Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
06/19/2016140510891Open ↗
05/09/2016122774916Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
06/19/2016140510891Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
05/09/2016122774916Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
06/19/2016140510891Open ↗
▸Trade Schedules & Equipment3
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
05/09/2016122774916Open ↗
04/26/2016122678450Open ↗
02/16/2016122678450Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/13/2026M01193853-I1Open ↗
08/13/2026M01193853-S1Open ↗
08/13/2026M01193853-S2Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
02/16/2016122678450Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
02/16/2016122678450Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
06/19/2016140510891Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
06/19/2016140510891Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
06/19/2016140510891Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
06/19/2016140510891Open ↗
05/09/2016122774916Open ↗
02/16/2016122678450Open ↗
▸Filing & Intake Forms6
▸BISADDITIONAL INFORMATION3
05/25/2016122678450Open ↗
04/04/2016122678450Open ↗
02/18/2016122678450Open ↗
▸BISEFILING COVER SHEET2
05/09/2016122774916Open ↗
02/16/2016122678450Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
06/19/2016140510891Open ↗
▸Other Documents4
▸DOB NOWManufacturer's Specifications2
08/27/2026M01015800-I1Open ↗
08/13/2026M01015800-P1Open ↗
▸DOB NOWCalculations2
08/27/2026M01015800-I1Open ↗
08/13/2026M01015800-P1Open ↗