← Back
Two stories - detached, small or mid-size
2271 LORING PLACE NORTH
BRONX · BIN 2014933
💬 Discuss this project
1901Year Built
2.5Stories
A1Building Class
R5Zoning
3,740 sfGross Floor Area
1Units
1 Open Violation ▸
Two stories - detached, small or mid-size · 4,587 sf lot · 0.82 FAR built · Flood zone X
Locations of Work
ArchitectureGeneral
Roof3p · 1 filing · 9 docs
Floor 26p · 1 filing · 20 docs
Floor 14p · 1 filing · 20 docs
Cellar6p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
UNISOLAR112/26/2025
BARRY J. BANK, P.E., CONSULTING ENG603/27/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
N N CONSULTANT203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CYNMAR CORPGeneral Contractor407/08/2026
BERGER QUALITY ELEC'L CONElectrical103/22/2026
JTE ELECTRICAL SERVICESElectrical103/22/2026
CENTURION SOLAR ENERGYGeneral Contractor104/09/2026
PLBG P & H INCPlumbing107/08/2026
WASOFF PLBG & UTILITY COPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CENTURION SOLAR ENERGY LL9475112/26/2025
BARRY J. BANK, P.E.1868403/27/2024
Building Lifecycle
All (113)Filed (7)Permit Issued (5)Signed Off (3)Violation (53)Inspection (10)Objection (14)Special Inspection (21)
05/27/2026
Signed off — Alteration
SCOPE OF WORK IS SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONICGENERATING SYSTEM. ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEINGAPPROVED AND/OR PERMITTED BY THE NYC DEPARTMENT OF BUILDINGS.
X01336788-I1
04/01/2026
Signed off — Alteration
Filed to relocate gas meter from CEL to OSP, and revise associated piping;
X00446851-I1
03/05/2026
Permit issued — Solar
X01336788-I1-SL
01/19/2026
Objection resolved — Addressed
01/16/2026
Objection raised — Admin
12/26/2025
Filed — Alteration
SCOPE OF WORK IS SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONICGENERATING SYSTEM. ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEINGAPPROVED AND/OR PERMITTED BY THE NYC DEPARTMENT OF BUILDINGS.
X01336788-I1
12/23/2025
Special inspection requirement — Air barrier - visual inspection
Andres Arias Londono
12/23/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Andres Arias Londono
12/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Andres Arias Londono
12/18/2025
Special inspection requirement — Final
Andres Arias Londono
12/18/2025
Special inspection requirement — Energy Code Compliance Inspections
Andres Arias Londono
11/15/2024
Signed off — Alteration
Filed to relocate gas meter from CEL to OSP, and revise associated piping;
X00446851-S1
05/21/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/09/2024
Permit issued — Plumbing
X00446851-S1-PL
03/27/2024
Filed — Alteration
Filed to relocate gas meter from CEL to OSP, and revise associated piping;
X00446851-P1
03/25/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Barry Bank, P.E.
02/28/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/18/2023
Special inspection requirement — Air barrier - visual inspection
Barry Bank, P.E.
12/18/2023
Special inspection requirement — Fenestration air leakage
Barry Bank, P.E.
12/18/2023
Special inspection requirement — Fenestration areas
Barry Bank, P.E.
12/18/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Barry Bank, P.E.
12/13/2023
Filed — Alteration
Filed to relocate gas meter from CEL to OSP, and revise associated piping;
X00446851-S1
12/13/2023
Filed — Alteration CO
Filed to reflect additional as-built work for legalization application.
X00483615-P1
10/13/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/28/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/11/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/06/2023
Permit issued — General Construction
X00483615-S1-GC
04/28/2023
Filed — Alteration CO
Filed to reflect additional as-built work for legalization application.
X00483615-S1
03/22/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/22/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/01/2023
Permit issued — Plumbing
X00446851-I1-PL
10/04/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/30/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/30/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/22/2022
Permit issued — General Construction
X00483615-I1-GC
03/07/2022
Violation issued (ECB, closed)
Construction
02/17/2022
Violation issued (ECB, closed)
Construction
12/23/2021
Filed — Alteration
Filed to relocate gas meter from CEL to OSP, and revise associated piping;
X00446851-I1
12/03/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Barry Bank, P.E.
11/06/2021
Violation issued (ECB, closed)
Construction
10/20/2021
Violation issued (ECB, closed)
Construction
10/20/2021
Violation issued (ECB, closed)
Construction
10/20/2021
Violation issued (ECB, closed)
Construction
10/18/2021
Objection resolved — Addressed
10/18/2021
Objection resolved — Addressed
10/18/2021
Objection resolved — Addressed
10/18/2021
Objection resolved — Addressed
10/18/2021
Objection resolved — Addressed
09/08/2021
Violation issued (ECB, closed)
Construction
09/08/2021
Violation issued (ECB, closed)
Construction
09/08/2021
Violation issued (ECB, closed)
Construction
08/16/2021
Violation issued (ECB, closed)
Construction
07/07/2021
Violation issued (ECB, closed)
Construction
07/07/2021
Violation issued (ECB, closed)
Construction
07/07/2021
Violation issued (ECB, closed)
Construction
07/07/2021
Violation issued (ECB, closed)
Construction
06/15/2021
Objection resolved — Addressed
05/21/2021
Violation issued (ECB, closed)
Construction
05/10/2021
Violation issued (ECB, closed)
Construction
05/10/2021
Violation issued (ECB, closed)
Construction
Latest 60 of 113 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offCENTURION SOLAR ENERGY03/05/2026
DOB NOWPlumbingSigned-offPLBG P & H INC04/09/2024
DOB NOWGeneral ConstructionPermit IssuedCYNMAR CORP06/06/2023
DOB NOWPlumbingSigned-offWASOFF PLBG & UTILITY CO02/01/2023
DOB NOWGeneral ConstructionPermit IssuedCYNMAR CORP06/22/2022
3 projects · most recent 04/01/2026
General Wiring
FiledStatusContractorScope
04/01/2026CompleteBERGER QUALITY ELEC'L CON1 meters
12/11/2025CompleteBERGER QUALITY ELEC'L CON—
02/26/2023CompleteJTE ELECTRICAL SERVICESGeneral Wiring
1 project · most recent 12/13/2023
FiledStatusContractorScope
12/13/2023Permit IssuedCYNMAR CORP2 scope_items
1 project · most recent 12/26/2025
FiledStatusContractorScope
12/26/2025Signed-offCENTURION SOLAR ENERGY46 panels, 20.48 kw, 326.52 roof_area_sqft
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
05/21/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/28/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/13/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/28/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/11/2023Pass-Final CND-Occupancy InspectionPassView ↗
03/22/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/22/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/04/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/30/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/30/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
12/23/2025Air barrier - visual inspectionAndres Arias Londonoenergy_progress
12/23/2025Structural Stability – Alterations of existing buildingsAndres Arias Londonospecial
12/18/2025Fire-Resistant Penetrations and JointsAndres Arias Londonospecial
12/18/2025FinalAndres Arias Londonoprogress
12/18/2025Energy Code Compliance InspectionsAndres Arias Londonoprogress
03/25/2024Fire-Resistant Penetrations and JointsBarry Bank, P.E.special
12/18/2023Air barrier - visual inspectionBarry Bank, P.E.energy_progress
12/18/2023Fenestration air leakageBarry Bank, P.E.energy_progress
12/18/2023Fenestration areasBarry Bank, P.E.energy_progress
12/18/2023Fenestration and door U-factor and product ratingsBarry Bank, P.E.energy_progress
12/03/2021Fire-Resistant Penetrations and JointsBarry Bank, P.E.special
03/10/2021Air barrier - visual inspectionBarry Bank, P.E.energy_progress
03/10/2021Interior lighting powerBarry Bank, P.E.energy_progress
03/10/2021Fenestration air leakageBarry Bank, P.E.energy_progress
03/10/2021MeteringBarry Bank, P.E.energy_progress
03/10/2021Fenestration and door U-factor and product ratingsBarry Bank, P.E.energy_progress
03/10/2021Fenestration areasBarry Bank, P.E.energy_progress
03/10/2021Fire-Resistance Rated ConstructionBarry Bank, P.E.progress
03/10/2021Energy Code Compliance InspectionsBarry Bank, P.E.progress
03/10/2021Fire-Resistant Penetrations and JointsBarry Bank, P.E.special
03/10/2021Structural Stability – Alterations of existing buildingsBarry Bank, P.E.special
▾Documents — 21 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/17/2026X01336788-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026X00483615-I1Open ↗
▸Seals & Professional Certifications16
▸DOB NOWProgress Inspector Seal & Signature11
09/06/2026X00483615-S1Open ↗
08/28/2026X01336788-I1Open ↗
08/28/2026X01336788-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/28/2026X01336788-I1Open ↗
08/28/2026X01336788-I1Open ↗
08/25/2026X00483615-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/17/2026X01336788-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/17/2026X01336788-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/17/2026X01336788-I1Open ↗
▸Other Documents1
▸DOB NOWFinal Survey1
08/13/2026X00483615-I1Open ↗