← Back
BuildNYC
Elevator apt, semi-fireproof without stores
2271 WASHINGTON AVENUE
BRONX · Belmont · BIN 2011340
💬 Discuss this project
2008Year Built
14Stories
D1Building Class
R6AZoning
111,767 sfGross Floor Area
118Units
LL97 CoveredRent Stabilized84 Active Violations 82 unresolved · 2 paperwork only 3 old, status unconfirmed ▸FISP: SWARMPFDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: 2265 Washington Avenue Housing Developme NT Fund · 31,412 sf lot · 3.56 FAR built · Flood zone X
Locations of Work
StructuralElectricalGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 1Heavy duty sidewalk shed installation4p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
2265 Washington Ave1103/21/2026
2265 Washington Avenue Housing Developme NT Fund403/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Haider Engineering, P.E.102/22/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Haider Engineering, P.E.103/21/2026
Haider Engineering P E103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HKS ConstructionScaffold407/08/2026
Coastal BuildersGeneral Contractor203/21/2026
M.B. Electrical ContractingElectrical203/21/2026
Sasco Construction EnterprisesGeneral Contractor103/21/2026
Lift-Tech Electric ServicesGeneral Contractor103/21/2026
Colgate Scaff EquipmentGeneral Contractor103/21/2026
MC O ContractingGeneral Contractor103/21/2026
Colgate Scaffold & EquipmentGeneral Contractor110/03/2008
Joy ConstructionGeneral Contractor506/07/2011
RO-Sal Plumbing & HeatingFire Protection106/04/2009
RO-Sal Plumbing & HeatingPlumbing306/09/2009
Building Lifecycle
02/20/2028
Facade inspection report due (FISP Cycle 9, sub-cycle B)
The filing window opened 02/21/2026. No Cycle 9 filing on record yet
08/03/2026
Boiler inspection report filed
Subsequent · no defects · Accepted
07/30/2026
Found laars gas fired boiler model # RHCH2400, not operable
ECB violation · open
07/30/2026
Found 8 out 17 exhaust unit on roof not operating, no ventilation felt on public area vents.; misc, comply with notice of violation; repair or…
ECB violation · open
07/30/2026
Found laars gas fired boiler model# rhch 2400 not operable.
ECB violation · closed
224 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offHKS Construction03/08/2018
DOB NOWSidewalk ShedSigned-offHKS Construction02/23/2018
BISOTISSUEDSasco Construction Enterprises04/13/2018
BISOTISSUEDJoy Construction06/07/2011
BIS—ISSUEDJoy Construction11/06/2009
BISEQISSUEDJoy Construction10/27/2009
BISPLISSUEDRO-Sal Plumbing & Heating06/09/2009
BISPLISSUEDRO-Sal Plumbing & Heating06/04/2009
BISSPISSUEDRO-Sal Plumbing & Heating06/04/2009
BISEQISSUEDColgate Scaff & Equipment04/02/2009
BISEQISSUEDLift-Tech Electric Services01/30/2009
BISEQISSUEDMC & O Contracting01/29/2009
BIS—ISSUEDJoy Construction12/19/2008
BISEQISSUEDJoy Construction12/19/2008
BISEQISSUEDMC & O Contracting12/17/2008
BISEQISSUEDColgate Scaffold & Equipment10/03/2008
BISOTISSUEDCoastal Builders06/23/2008
BISPLISSUEDRO-Sal Plumbing & Heating05/21/2008
BIS—ISSUEDCoastal Builders02/29/2008
BISEQISSUEDCoastal Builders02/29/2008
BISEQISSUEDNorth American Demo01/31/2008
BIS—ISSUEDNorth American Demo01/31/2008
1 project · most recent 02/14/2018
FiledStatusContractorScope
02/14/2018Permit IssuedRichard Neu—
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
02/14/2018FinalJAFAR HAIDERprogress
237 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account