← Back
Walk-up apt, over six families with stores
2274 ADAM C POWELL BLVD
MANHATTAN · BIN 1058815
💬 Discuss this project
1910Year Built
5Stories
C7Building Class
R7-2Zoning
6,355 sfGross Floor Area
9Units
Rent Stabilized6 Open Violations ▸
Walk-up apt, over six families with stores · Owner of record: RESTORING COMMUNITIES HOUSING DEV FUND C ORP · 1,587 sf lot · 4 FAR built · Flood zone X
Locations of Work
StructuralMechanicalPlumbingFire ProtectionOther
Roof5p · 3 filings · 20 docs
Bulkhead1p · 1 filing · 15 docs
Floor 43p · 1 filing · 18 docs
Floor 3
Floor 21p · 1 filing · 18 docs
Floor 13p · 2 filings · 20 docs
Cellar6p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WEST HARLEM GROUP ASSISTANCE503/22/2026
RESTORING COMMUNITIES HOUSING DEV FUND C ORP103/22/2026
H.P.D. 8103/22/2026
HOUSING PRESERVATION AND DEV.203/21/2026
RESTORING COMMUNITIES HDFC203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ROSENTHAL ENGINEERING PLLC1001/02/2024
ASHRAF CORP307/21/2023
AK CONSULTING SERVICES, INC112/19/2022
OLD STRUCTURES ENGINEERING, P.C.209/28/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMB BUILDING CONSULTING2403/21/2026
Rigid Structural Design, LLC203/21/2026
AK CONSULTING SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
INTERSYSTEM INSTALLATIONGeneral Contractor707/08/2026
WATSON'S PLBG, HTG, & BDGPlumbing507/08/2026
ERIN CONSTRUCTION & DEVELOPMENTGeneral Contractor407/08/2026
INTERSYSTEMS INSTAL S&SGeneral Contractor303/21/2026
EXPERT FIRE SPRINKLER,LLCFire Protection207/08/2026
AAKASH CONSTRUCTION INCGeneral Contractor203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
M. HAMDI GUNAL, PE, P.C.30001201/02/2024
Building Lifecycle
All (151)Filed (16)Permit Issued (13)Signed Off (8)Violation (60)Inspection (8)Objection (16)Special Inspection (30)
04/29/2026
Violation issued (HPD, open)
A
06/04/2025
Violation issued (HPD, open)
A
04/15/2025
Violation issued (HPD, open)
A
04/15/2025
Violation issued (HPD, open)
A
04/15/2025
Violation issued (HPD, open)
C
04/01/2024
Violation issued (HPD, open)
A
03/13/2024
Signed off — Alteration
PROPOSE PLUMBING AND SPRINKLER WORK IN CONJUNCTION WITH ALT I# 121205999
M00221228-I1
03/04/2024
Signed off — Alteration
Propose Structural Scope of Work filed in conjunction with Alt I # 121205999.
M00236099-I1
02/21/2024
Signed off — Alteration
M08051336-I1
02/21/2024
Signed off — Alteration
PROPOSE MECHANICAL SCOPE OF WORK FILED IN CONJUNCTION WITH ALT I #121205999; WORK INCLUDES INSTALLATION OF NEW EXHAUST FANS, METAL B VENT CHIMNEY, EXPANSION TANK, PUMPS, ELECTRIC HEATERS AS PER PLAN.
M00229846-I1
02/16/2024
Signed off — Alteration
M00502858-I1
02/16/2024
Signed off — Alteration
PROPOSE TO INSTALL TWO NEW GAS FIRED BOILER FILED IN CONJUNCTION WITH ALT 1 # 121205999.
M00236043-I1
02/08/2024
Signed off — Alteration
M00907486-I1
01/02/2024
Filed — Alteration
PROPOSE PLUMBING AND SPRINKLER WORK IN CONJUNCTION WITH ALT I# 121205999
M00221228-P3
01/02/2024
Special inspection requirement — Sprinkler Systems
Mehmet Gunal
01/02/2024
Special inspection requirement — HVAC insulation and sealing
Mehmet Gunal
01/02/2024
Special inspection requirement — Energy Code Compliance Inspections
Mehmet Gunal
11/27/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mehmet Gunal
11/27/2023
Special inspection requirement — Heating Systems
Mehmet Gunal
11/27/2023
Special inspection requirement — Maintenance information
Mehmet Gunal
11/27/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Mehmet Gunal
11/27/2023
Special inspection requirement — HVAC and service water heating equipment
Mehmet Gunal
11/27/2023
Special inspection requirement — HVAC and service water heating system controls
Mehmet Gunal
11/27/2023
Special inspection requirement — Shutoff dampers
Mehmet Gunal
11/15/2023
Filed — Alteration
PROPOSE TO INSTALL TWO NEW GAS FIRED BOILER FILED IN CONJUNCTION WITH ALT 1 # 121205999.
M00236043-P2
11/14/2023
Special inspection requirement — Heating Systems
Mehmet Gunal
11/14/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Mehmet Gunal
11/14/2023
Special inspection requirement — HVAC and service water heating equipment
Mehmet Gunal
11/14/2023
Special inspection requirement — Maintenance information
Mehmet Gunal
11/14/2023
Special inspection requirement — HVAC and service water heating system controls
Mehmet Gunal
11/14/2023
Special inspection requirement — Shutoff dampers
Mehmet Gunal
11/14/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mehmet Gunal
11/13/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
09/20/2023
Inspection — Certified Sprinkler (SP) - Booster Pump Test
Certified
View inspection ↗
09/06/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/28/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/22/2023
Permit issued — Supported Scaffold
M00907486-I1-SF
07/21/2023
Filed — Alteration
M00907486-I1
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/24/2023
Permit issued — Boiler Equipment
M00236043-I1-BE
05/18/2023
Permit issued — Mechanical Systems
M00229846-I1-MS
05/18/2023
Permit issued — Structural
M00236099-I1-ST
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/18/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/15/2023
Violation issued (HPD, closed)
A
03/07/2023
Objection resolved — Addressed
03/06/2023
Objection raised — Other
03/02/2023
Special inspection requirement — Heating Systems
Mehmet Gunal
03/02/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mehmet Gunal
03/02/2023
Special inspection requirement — Mechanical Systems
Mehmet Gunal
03/02/2023
Special inspection requirement — Final
Mehmet Gunal
03/02/2023
Special inspection requirement — Energy Code Compliance Inspections
Mehmet Gunal
03/02/2023
Special inspection requirement — HVAC and service water heating equipment
Mehmet Gunal
03/02/2023
Special inspection requirement — HVAC and service water heating system controls
Mehmet Gunal
03/02/2023
Special inspection requirement — Maintenance information
Mehmet Gunal
03/02/2023
Special inspection requirement — HVAC insulation and sealing
Mehmet Gunal
03/02/2023
Special inspection requirement — Shutoff dampers
Mehmet Gunal
02/28/2023
Filed — Alteration
PROPOSE MECHANICAL SCOPE OF WORK FILED IN CONJUNCTION WITH ALT I #121205999; WORK INCLUDES INSTALLATION OF NEW EXHAUST FANS, METAL B VENT CHIMNEY, EXPANSION TANK, PUMPS, ELECTRIC HEATERS AS PER PLAN.
M00229846-P2
02/28/2023
Filed — Alteration
PROPOSE PLUMBING AND SPRINKLER WORK IN CONJUNCTION WITH ALT I# 121205999
M00221228-P2
02/23/2023
Special inspection requirement — Sprinkler Systems
Mehmet Gunal
Latest 60 of 151 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldSigned-offINTERSYSTEMS INSTAL S&S07/22/2023
DOB NOWBoiler EquipmentSigned-offWATSON'S PLBG, HTG, & BDG05/24/2023
DOB NOWMechanical SystemsSigned-offERIN CONSTRUCTION & DEVELOPMENT05/18/2023
DOB NOWStructuralSigned-offERIN CONSTRUCTION & DEVELOPMENT05/18/2023
DOB NOWSprinklersSigned-offEXPERT FIRE SPRINKLER,LLC01/26/2023
DOB NOWConstruction FenceSigned-offERIN CONSTRUCTION & DEVELOPMENT12/20/2022
DOB NOWPlumbingSigned-offWATSON'S PLBG, HTG, & BDG11/04/2022
DOB NOWSidewalk ShedSigned-offINTERSYSTEM INSTALLATION07/22/2022
DOB NOWPlumbingSigned-offEXPERT FIRE SPRINKLER,LLC01/21/2022
DOB NOWSprinklersSigned-offWATSON'S PLBG, HTG, & BDG12/29/2021
DOB NOWSidewalk ShedSigned-offINTERSYSTEM INSTALLATION08/02/2021
DOB NOWSidewalk ShedSigned-offINTERSYSTEM INSTALLATION06/24/2021
DOB NOWSidewalk ShedSigned-offAAKASH CONSTRUCTION INC04/19/2021
BIS—ISSUEDERIN CONSTRUCTION & DEVELOPMENT09/01/2023
BIS—ISSUEDERIN CONSTRUCTION & DEVELOPMENT09/08/2022
BIS—ISSUEDERIN CONSTRUCTION & DEVELOPMENT09/13/2021
BIS—ISSUEDERIN CONSTRUCTION & DEVELOPMENT07/22/2021
BISBLISSUEDS.J. FUEL CO., INC12/18/2006
BISOTISSUEDSANDHU CONSTRUCTION , INC.04/16/2001
BISFBISSUEDBROOK FUEL OIL CORP.06/06/1991
3 projects · most recent 01/16/2024
General Wiring
FiledStatusContractorScope
01/16/2024CompleteRAMDEEN'S ELEC. CONTR.CORGeneral Wiring
06/24/2021CompleteSTEVEN FARKAS—
04/13/2021CompleteRICHARD NEU—
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
11/13/2023Pass-Final Boiler Equipment InspectionPassView ↗
09/20/2023Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
09/06/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/28/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/18/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/08/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/10/2022Pass-Final PL - Up to 9 Requested FloorsPassView ↗
02/28/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 59
DateRequirementInspectorRole
01/02/2024Sprinkler SystemsMehmet Gunalspecial
01/02/2024HVAC insulation and sealing Mehmet Gunalenergy_progress
01/02/2024Energy Code Compliance InspectionsMehmet Gunalprogress
11/27/2023Fire-Resistant Penetrations and JointsMehmet Gunalspecial
11/27/2023Heating SystemsMehmet Gunalspecial
11/27/2023Maintenance informationMehmet Gunalenergy_progress
11/27/2023HVAC-R and service water piping design and insulationMehmet Gunalenergy_progress
11/27/2023HVAC and service water heating equipment Mehmet Gunalenergy_progress
11/27/2023HVAC and service water heating system controls Mehmet Gunalenergy_progress
11/27/2023Shutoff dampersMehmet Gunalenergy_progress
11/14/2023Heating SystemsMehmet Gunalspecial
11/14/2023HVAC-R and service water piping design and insulationMehmet Gunalenergy_progress
11/14/2023HVAC and service water heating equipment Mehmet Gunalenergy_progress
11/14/2023Maintenance informationMehmet Gunalenergy_progress
11/14/2023HVAC and service water heating system controls Mehmet Gunalenergy_progress
11/14/2023Shutoff dampersMehmet Gunalenergy_progress
11/14/2023Fire-Resistant Penetrations and JointsMehmet Gunalspecial
03/02/2023Heating SystemsMehmet Gunalspecial
03/02/2023Fire-Resistant Penetrations and JointsMehmet Gunalspecial
03/02/2023Mechanical SystemsMehmet Gunalspecial
03/02/2023FinalMehmet Gunalprogress
03/02/2023Energy Code Compliance InspectionsMehmet Gunalprogress
03/02/2023HVAC and service water heating equipment Mehmet Gunalenergy_progress
03/02/2023HVAC and service water heating system controls Mehmet Gunalenergy_progress
03/02/2023Maintenance informationMehmet Gunalenergy_progress
Latest 25 of 59.
▾Documents — 147 on file (BIS + DOB NOW)
▸Plans & Drawings19
▸DOB NOWPlans/Sketch - Plumbing4
09/05/2026M00221228-P2Request digital key ↗
09/05/2026M00221228-P3Request digital key ↗
09/01/2026M00221228-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler4
09/05/2026M00221228-P2Request digital key ↗
09/05/2026M00221228-P3Request digital key ↗
09/01/2026M00221228-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Boiler Equipment3
09/03/2026M00236043-I1Request digital key ↗
09/03/2026M00236043-P2Request digital key ↗
08/15/2026M00236043-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems3
09/05/2026M00229846-P2Request digital key ↗
08/15/2026M00229846-P1Request digital key ↗
08/15/2026M00229846-I1Request digital key ↗
▸DOB NOWPlans/Sketch3
09/03/2026M00502858-I1Request digital key ↗
09/03/2026M00545428-I1Request digital key ↗
08/29/2026M00907486-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural2
09/05/2026M00236099-P1Request digital key ↗
08/15/2026M00236099-I1Request digital key ↗
▸Applications & Permits9
▸BISPLAN / WORK APPROVAL APPLICATION7
03/22/2024121205999Open ↗
03/19/2024121205999Open ↗
03/08/2024103629218Open ↗
Showing 3 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
09/21/2023121205999Open ↗
▸BISWORK PERMIT APPLICATION1
07/22/2021121205999Open ↗
▸Seals & Professional Certifications45
▸DOB NOWProgress Inspector Seal & Signature16
09/23/2026M00236043-I1Open ↗
09/23/2026M00236043-I1Open ↗
09/02/2026M00221228-P1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature16
09/05/2026M00236099-I1Open ↗
09/05/2026M00236099-P1Open ↗
09/05/2026M00221228-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
09/23/2026M00236043-I1Open ↗
09/23/2026M00236043-I1Open ↗
09/02/2026M00221228-P1Open ↗
Showing 3 of 13 on file for this type
▸Trade Schedules & Equipment2
▸BISFA - FDNY APPROVAL : FD-FAA1
03/18/2024121205999Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
03/18/2024121205999Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST2
09/30/2019121205999Open ↗
08/30/2019121205999Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form5
09/05/2026M00221228-I1Open ↗
09/03/2026M00236043-I1Open ↗
09/03/2026M00236043-I1Open ↗
Showing 3 of 5 on file for this type
▸BISAPPLICANT SHALL PROVIDE 1 ACP-21 FORMPRIOR TO SIGN OFF: TRU1143MN211
03/19/2024121205999Open ↗
▸BISASBESTOS: VARIANCE (DEP FORM V5)1
07/22/2021121205999Open ↗
▸Energy Compliance17
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
03/18/2024121205999Open ↗
07/22/2021121205999Open ↗
08/30/2019121205999Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
02/16/2024121205999Open ↗
▸BISINTERIOR LIGHTING POWER1
02/16/2024121205999Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
02/16/2024121205999Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
02/16/2024121205999Open ↗
▸BISFENESTRATION AREAS1
02/16/2024121205999Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
02/16/2024121205999Open ↗
▸BISLIGHTING IN DWELLING UNITS1
02/16/2024121205999Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
02/16/2024121205999Open ↗
▸BISELECTRIC MOTORS1
02/16/2024121205999Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
03/06/2024121205999Open ↗
▸BISLIGHTING CONTROLS1
02/16/2024121205999Open ↗
▸BISELECTRICAL ENERGY CONSUMPTION1
02/16/2024121205999Open ↗
▸BISEXTERIOR LIGHTING POWER1
02/16/2024121205999Open ↗
▸BISFENESTRATION AIR LEAKAGE1
02/16/2024121205999Open ↗
▸Inspections & Test Reports11
▸BISTECHNICAL REPORT: RESPONSIBILITY3
03/18/2024121205999Open ↗
07/22/2021121205999Open ↗
08/30/2019121205999Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
02/16/2024121205999Open ↗
▸BISSTRUCTURAL STEEL - DETAILS1
02/16/2024121205999Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
02/16/2024121205999Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
02/16/2024121205999Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
02/16/2024121205999Open ↗
▸BISMASONRY1
02/16/2024121205999Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
02/16/2024121205999Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
02/16/2024121205999Open ↗
▸Approvals, Objections & Sign-offs24
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter13
09/05/2026M00236099-P1Open ↗
09/05/2026M00221228-I1Open ↗
09/05/2026M00221228-P2Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDEP Variance (V5) letter4
09/05/2026M00221228-I1Open ↗
09/03/2026M00236043-I1Open ↗
08/15/2026M00236099-I1Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
07/22/2021121205999Open ↗
09/30/2019121205999Open ↗
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)2
09/05/2026M00236099-P1Open ↗
08/15/2026M00236099-I1Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
03/11/2024103629218Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
03/22/2024121205999Open ↗
▸BIS$100 REINSTATEMENT FEE MUST BE PAIDBASED ON REINSTATEMENT APPROVAL GRANTED.1
04/02/2024121205999Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT1
08/30/2019121205999Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
03/18/2024121205999Open ↗
▸Filing & Intake Forms5
▸BISADDITIONAL INFORMATION5
03/19/2024121205999Open ↗
02/23/2023121205999Open ↗
09/07/2022121205999Open ↗
Showing 3 of 5 on file for this type
▸Other Documents4
▸BISSTRUCTURAL COLD-FORMED STEEL1
02/16/2024121205999Open ↗
▸BISMAINTENANCE INFORMATION1
02/16/2024121205999Open ↗
▸BISTCO - Supporting Documents1
03/19/2024121205999Open ↗
▸BISPLOT DIAGRAM1
08/30/2019121205999Open ↗