← Back
BuildNYC
Elevator apt, semi-fireproof without stores
2277 ANDREWS AVENUE NORTH
BRONX · BIN 2014921
💬 Discuss this project
1927Year Built
6Stories
D1Building Class
R7-1Zoning
—Gross Floor Area
49Units
22 Active Violations 19 unresolved · 3 paperwork only ▸FISP: SWARMPFDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: Mmikp Bronx Realty LL · 4.17 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 1 filing · 5 docs
BulkheadUnder Construction1p · 1 filing · 5 docs
Floor 7Under Construction1p · 1 filing · 5 docs
Floor 6Under Construction1p · 1 filing · 5 docs
Floor 5Under Construction1p · 1 filing · 5 docs
Floor 4Under Construction1p · 1 filing · 5 docs
Floor 3Under Construction1p · 1 filing · 5 docs
Floor 2Under Construction1p · 1 filing · 5 docs
Floor 1Heavy duty sidewalk shed installationUnder Construction6p · 2 filings · 5 docs
CellarUnder Construction1p · 1 filing · 5 docs
Site & exteriorUnder Construction1 filing · 5 docs
Filed — no permit issued1 filing
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Mmikp Bronx Realty403/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
McHenery Testing Lab110/20/2026
David Katz110/07/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Rock Group NYGeneral Contractor203/21/2026
BHB ConstructionGeneral Contractor103/21/2026
Irving BauerGeneral Contractor103/21/2026
Reliable EnterprisesScaffold110/21/2026
G M Construction WaterGeneral Contractor103/21/2026
1 R.S.General Contractor105/01/2013
Rock ScaffoldingGeneral Contractor106/15/2012
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AG Engineering8899110/07/2026
David Katz, P.E.6087110/07/2026
Building Lifecycle
02/20/2027
Facade inspection report due (FISP Cycle 9, sub-cycle A)
The filing window opened 02/21/2025. No Cycle 9 filing on record yet
11/15/2026
Filed — Alteration
Suspended Scaffold out rigger installation for Facade repair works
X01489838-I1
11/09/2026
Permit issued — General Construction
X01368170-I1-GC
10/20/2026
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
X01477095-I1
10/20/2026
Permit issued — Sidewalk Shed
X01477095-I1-SH
219 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedBlue USA Construction Company11/09/2026
DOB NOWSidewalk ShedPermit IssuedReliable Enterprises10/20/2026
BISEQISSUEDRock Group NY04/14/2015
BISEQISSUEDB H & B Construction04/16/2014
BISEQISSUEDRock Group NY04/07/2014
BISOTISSUEDG.M. Construction & Waterproof02/06/2014
BISEQISSUEDRock Group NY05/01/2013
BISEQISSUEDRock Scaffolding06/15/2012
BISOTISSUEDG. Bauer04/17/1998
1 project · most recent 10/20/2026
FiledStatusContractorScope
10/20/2026Permit IssuedRichard Neu—
1 project · most recent 10/20/2026
Sidewalk Shed
FiledStatusContractorScope
10/20/2026Permit IssuedReliable EnterprisesSidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
10/06/2026Tenant Protection Plan Compliance—special
09/14/2026MasonryDavid Katzspecial
09/14/2026Structural Stability – Alterations of existing buildingsDavid Katzspecial
09/14/2026FinalDavid Katzprogress
58 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account