← Back
Cape Cod
228-03 114 DRIVE
QUEENS · BIN 4242718
💬 Discuss this project
1950Year Built
1.5Stories
A0Building Class
R2AZoning
1,225 sfGross Floor Area
1Units
Cape Cod · 4,003 sf lot · 0.31 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingLandscape
Floor 211p · 2 filings · 20 docs
Floor 1
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NORMAN C. LOK, PE712/23/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KING'S USA GROUP INCGeneral Contractor403/21/2026
NORTON MECHANICAL II INCPlumbing207/08/2026
CAPE PLUMBING INCPlumbing107/08/2026
Building Lifecycle
All (40)Filed (7)Permit Issued (5)Signed Off (1)Inspection (7)Objection (20)
02/21/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
01/03/2025
Signed off — Alteration
PROPOSED FIXTURES
Q07997197-I1
12/23/2024
Filed — Alteration
FINISHED CELLAR with 2 PC BATH AND LAUNDRY; INTERIOR ALTERATIONS TO FIRST FLOOR WITH RELOCATION OF KITCHEN SINK & GAS STOVE; INTERIOR ALTERATIONS TO SECOND FLOOR AND REPAIR OF EXISTING WINDOWS AND FINISHES
Q07997182-P3
10/02/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
08/22/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
08/05/2024
Permit issued — Plumbing
Q07997197-I1-PL
02/27/2024
Permit issued — Plumbing
Q07997197-I1-PL
12/20/2023
Objection resolved — Addressed
10/08/2023
Objection raised — Scope
10/04/2023
Filed — Alteration
FINISHED CELLAR with 2 PC BATH AND LAUNDRY; INTERIOR ALTERATIONS TO FIRST FLOOR WITH RELOCATION OF KITCHEN SINK & GAS STOVE; INTERIOR ALTERATIONS TO SECOND FLOOR AND REPAIR OF EXISTING WINDOWS AND FINISHES
Q07997182-P2
04/28/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
04/04/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/31/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/19/2023
Objection resolved — Addressed
03/19/2023
Objection resolved — Addressed
03/19/2023
Objection resolved — Addressed
03/03/2023
Objection raised — Admin
03/03/2023
Objection raised — Admin
03/03/2023
Objection raised — Mechanical
02/27/2023
Filed — Alteration
PROPOSED FIXTURES
Q07997197-P2
01/31/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/25/2023
Permit issued — General Construction
Q07997182-I1-GC
01/23/2023
Filed — Alteration
PROPOSED FIXTURES
Q07997197-P1
12/14/2022
Permit issued — Plumbing
Q07997197-I1-PL
12/07/2022
Filed — Alteration
FINISHED CELLAR with 2 PC BATH AND LAUNDRY; INTERIOR ALTERATIONS TO FIRST FLOOR WITH RELOCATION OF KITCHEN SINK & GAS STOVE; INTERIOR ALTERATIONS TO SECOND FLOOR AND REPAIR OF EXISTING WINDOWS AND FINISHES
Q07997182-P1
11/10/2022
Permit issued — General Construction
Q07997182-I1-GC
09/19/2022
Objection raised — Other
09/19/2022
Objection resolved — Addressed
09/19/2022
Objection raised — Scope
09/19/2022
Objection resolved — Addressed
09/19/2022
Objection raised — Energy
09/19/2022
Objection resolved — Addressed
09/19/2022
Objection raised — Other
09/19/2022
Objection resolved — Addressed
09/19/2022
Objection raised — Scope
09/19/2022
Objection resolved — Addressed
09/19/2022
Objection raised — Inspections
09/19/2022
Objection resolved — Addressed
09/15/2022
Filed — Alteration
PROPOSED FIXTURES
Q07997197-I1
09/15/2022
Filed — Alteration
FINISHED CELLAR with 2 PC BATH AND LAUNDRY; INTERIOR ALTERATIONS TO FIRST FLOOR WITH RELOCATION OF KITCHEN SINK & GAS STOVE; INTERIOR ALTERATIONS TO SECOND FLOOR AND REPAIR OF EXISTING WINDOWS AND FINISHES
Q07997182-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offNORTON MECHANICAL II INC08/05/2024
DOB NOWPlumbingSigned-offNORTON MECHANICAL II INC02/27/2024
DOB NOWGeneral ConstructionSigned-offKING'S USA GROUP INC01/25/2023
DOB NOWPlumbingSigned-offCAPE PLUMBING INC12/14/2022
DOB NOWGeneral ConstructionSigned-offKING'S USA GROUP INC11/10/2022
1 project · most recent 03/22/2023
General Wiring
FiledStatusContractorScope
03/22/2023CompleteISLAND ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
02/21/2025Pass-Final General Construction Non-Directive 14PassView ↗
10/02/2024Fail-Final General Construction Non-Directive 14FailView ↗
08/22/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
04/28/2023Fail-Final General Construction Non-Directive 14FailView ↗
04/04/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/31/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/31/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Documents — 21 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/25/2026Q07997182-P1Request digital key ↗
08/25/2026Q07997182-P3Request digital key ↗
08/25/2026Q07997197-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/25/2026Q07997182-P1Open ↗
08/25/2026Q07997182-I1Open ↗
08/25/2026Q07997182-P3Open ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/25/2026Q07997182-P3Open ↗
08/25/2026Q07997182-P1Open ↗
08/25/2026Q07997197-I1Open ↗
Showing 3 of 7 on file for this type