← Back
Three families
228-12 141 AVENUE
QUEENS · BIN 4283690
💬 Discuss this project
1963Year Built
2Stories
C0Building Class
R3AZoning
2,400 sfGross Floor Area
3Units
Rent Stabilized6 Open Violations 3 unresolved · 3 paperwork only ▸FDNY Report ↗
Three families · 4,800 sf lot · 0.5 FAR built · Flood zone X500
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OWNER OF 228-12 141 AVE103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/28/2023$812K—— → —$339/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GRACE ENGINEERING PLLC.711/17/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARCHITECTUAL CONCEPT1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HUNT B CONSTRUCTION INCGeneral Contractor207/08/2026
JOHN FITZGERALD PLBG &HTGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GRACE ENGINEERING PLLC.2176611/17/2025
Building Lifecycle
All (49)Filed (7)Permit Issued (3)Signed Off (2)Violation (10)Inspection (5)Special Inspection (22)
01/02/2026
Signed off — Alteration
CELLAR INTERIOR ALTERATION AND RENOVATION TO REMOVE ILLEGAL PARTITIONS AND RESTORE EXISTING GARAGE TO REMOVE VIOLATIONS. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
Q00938822-I1
12/31/2025
Permit issued — Mechanical Systems
Q00938822-I1-MS
12/30/2025
Signed off — Alteration
Q00938839-I1
11/25/2025
Violation issued (HPD, open)
I
11/17/2025
Filed — Alteration
Q00938839-P4
11/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
TARIQ SIDDIQUI
11/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
TARIQ SIDDIQUI
10/07/2025
Filed — Alteration
Q00938839-P3
09/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
TARIQ SIDDIQUI
08/29/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/25/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/25/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/06/2025
Permit issued — Plumbing
Q00938839-I1-PL
03/27/2025
Filed — Alteration
Q00938839-P2
12/04/2024
Violation issued (HPD, open)
I
10/31/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
10/10/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
10/02/2024
Filed — Alteration
Q00938839-P1
10/02/2024
Filed — Alteration
CELLAR INTERIOR ALTERATION AND RENOVATION TO REMOVE ILLEGAL PARTITIONS AND RESTORE EXISTING GARAGE TO REMOVE VIOLATIONS. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
Q00938822-P1
10/02/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
TARIQ SIDDIQUI
10/02/2024
Special inspection requirement — Energy Code Compliance Inspections
TARIQ SIDDIQUI
10/02/2024
Special inspection requirement — Final
TARIQ SIDDIQUI
10/02/2024
Special inspection requirement — Shutoff dampers
TARIQ SIDDIQUI
10/02/2024
Special inspection requirement — Mechanical Systems
TARIQ SIDDIQUI
10/02/2024
Special inspection requirement — Insulation placement and R values
TARIQ SIDDIQUI
10/02/2024
Special inspection requirement — Air barrier - visual inspection
TARIQ SIDDIQUI
10/02/2024
Special inspection requirement — Duct leakage testing, insulation and design
TARIQ SIDDIQUI
10/02/2024
Special inspection requirement — Interior lighting power
TARIQ SIDDIQUI
07/11/2024
Special inspection requirement — Interior lighting power
TARIQ SIDDIQUI
07/11/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
TARIQ SIDDIQUI
07/11/2024
Special inspection requirement — Mechanical Systems
TARIQ SIDDIQUI
07/11/2024
Special inspection requirement — Energy Code Compliance Inspections
TARIQ SIDDIQUI
07/11/2024
Special inspection requirement — Final
TARIQ SIDDIQUI
07/11/2024
Special inspection requirement — Duct leakage testing, insulation and design
TARIQ SIDDIQUI
07/11/2024
Special inspection requirement — Insulation placement and R values
TARIQ SIDDIQUI
07/11/2024
Special inspection requirement — Air barrier - visual inspection
TARIQ SIDDIQUI
07/11/2024
Special inspection requirement — Shutoff dampers
TARIQ SIDDIQUI
07/11/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
12/12/2023
Permit issued — Mechanical Systems
Q00938822-I1-GC
11/29/2023
Violation issued (HPD, open)
I
09/28/2023
Filed — Alteration
Q00938839-I1
09/27/2023
Filed — Alteration
CELLAR INTERIOR ALTERATION AND RENOVATION TO REMOVE ILLEGAL PARTITIONS AND RESTORE EXISTING GARAGE TO REMOVE VIOLATIONS. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
Q00938822-I1
03/21/2001
Violation issued (ECB, closed)
Construction
10/14/1999
Violation issued (ECB, closed)
Construction
10/14/1999
Violation issued (DOB, closed)
VW*-VIOLATION - WORK W/O PERMIT DISMISSED
08/02/1998
Violation issued (ECB, open)
Quality of Life
08/02/1998
Violation issued (ECB, closed)
Quality of Life
08/25/1997
Violation issued (ECB, open)
Construction
08/25/1997
Violation issued (ECB, open)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offHUNT B CONSTRUCTION INC12/31/2025
DOB NOWPlumbingSigned-offJOHN FITZGERALD PLBG &HTG05/06/2025
DOB NOWMechanical SystemsSigned-offHUNT B CONSTRUCTION INC12/12/2023
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
08/29/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/25/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/25/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
10/31/2024Pass-Final General Construction Non-Directive 14PassView ↗
10/10/2024Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
11/17/2025Fire-Resistant Penetrations and JointsTARIQ SIDDIQUIspecial
11/05/2025Fire-Resistant Penetrations and JointsTARIQ SIDDIQUIspecial
09/26/2025Fire-Resistant Penetrations and JointsTARIQ SIDDIQUIspecial
10/02/2024Fire-Resistant Penetrations and JointsTARIQ SIDDIQUIspecial
10/02/2024Energy Code Compliance InspectionsTARIQ SIDDIQUIprogress
10/02/2024FinalTARIQ SIDDIQUIprogress
10/02/2024Shutoff dampersTARIQ SIDDIQUIenergy_progress
10/02/2024Mechanical SystemsTARIQ SIDDIQUIspecial
10/02/2024Insulation placement and R valuesTARIQ SIDDIQUIenergy_progress
10/02/2024Air barrier - visual inspectionTARIQ SIDDIQUIenergy_progress
10/02/2024Duct leakage testing, insulation and designTARIQ SIDDIQUIenergy_progress
10/02/2024Interior lighting powerTARIQ SIDDIQUIenergy_progress
07/11/2024Interior lighting powerTARIQ SIDDIQUIenergy_progress
07/11/2024Fire-Resistant Penetrations and JointsTARIQ SIDDIQUIspecial
07/11/2024Mechanical SystemsTARIQ SIDDIQUIspecial
07/11/2024Energy Code Compliance InspectionsTARIQ SIDDIQUIprogress
07/11/2024FinalTARIQ SIDDIQUIprogress
07/11/2024Duct leakage testing, insulation and designTARIQ SIDDIQUIenergy_progress
07/11/2024Insulation placement and R valuesTARIQ SIDDIQUIenergy_progress
07/11/2024Air barrier - visual inspectionTARIQ SIDDIQUIenergy_progress
07/11/2024Shutoff dampersTARIQ SIDDIQUIenergy_progress
07/11/2024Fire-Resistant Penetrations and Joints—special
▾Documents — 47 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/24/2026Q00938822-P1Request digital key ↗
08/24/2026Q00938822-I1Request digital key ↗
08/18/2026Q00938839-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records5
▸DOB NOWRestrictive Declaration/Easement 15
08/13/2026Q00938839-P3Open ↗
08/13/2026Q00938839-P4Open ↗
08/13/2026Q00938839-I1Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications28
▸DOB NOWProgress Inspector Seal & Signature14
08/27/2026Q00938822-P1Open ↗
08/27/2026Q00938822-P1Open ↗
08/27/2026Q00938822-P1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/24/2026Q00938822-I1Open ↗
08/24/2026Q00938822-P1Open ↗
08/18/2026Q00938839-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/01/2026Q00938839-P4Open ↗
08/31/2026Q00938839-P3Open ↗
08/31/2026Q00938839-I1Open ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/24/2026Q00938822-I1Open ↗
08/24/2026Q00938822-P1Open ↗
08/18/2026Q00938839-P1Open ↗
Showing 3 of 7 on file for this type