Elevator apt, fireproof without stores
Ainsley Condominium
228 13 STREET · BIN 3023392
💬 Discuss this project
2023Year Built
5Stories
D3Building Class
—Zoning
47,630 sfGross Floor Area
28Units
0 Open ViolationsFDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: 228 13TH STREET LLC · 14,178 sf lot · 3.36 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneralOther
Roof58p · 1 filing · 20 docs
Floor 558p · 1 filing · 20 docs
Floor 458p · 1 filing · 20 docs
Floor 360p · 1 filing · 20 docs
Floor 257p · 1 filing · 20 docs
Floor 160p · 1 filing · 20 docs
Cellar58p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OWNERS REP1307/08/2026
205 14 STREET5707/08/2026
METRO CONTRACTING NY407/08/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE DESIGN SOLUTION1603/21/2026
RELIABLE EXPEDITING1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
OMNI BUILD INCGeneral Contractor1407/08/2026
CORE SCAFFOLD SYSTEMS INC.General Contractor1307/08/2026
BAYPORT CONSTRUCTION CORP.General Contractor403/21/2026
MEGA PLBGGeneral Contractor203/22/2026
MEGA PLBG CORPFire Protection207/08/2026
METRO CONTRACTING NY, INC.General Contractor107/08/2026
NICE PLUMBING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TECNICO SPECIAL INSPECTIO59391306/23/2025
Building Lifecycle
All (166)Filed (24)Permit Issued (20)Signed Off (10)Violation (2)Inspection (14)Objection (66)Special Inspection (30)
07/31/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/09/2025
Signed off — New Building
Installation of new Sprinkler/Standpipe building for new building in conjunction with NB Application no. B00766674-I1
B00766674-S7
07/09/2025
Special inspection requirement — Lighting controls
Jose Lockhart
07/09/2025
Special inspection requirement — Fenestration air leakage
Jose Lockhart
07/09/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Jose Lockhart
07/09/2025
Special inspection requirement — Maintenance information
Jose Lockhart
07/09/2025
Special inspection requirement — Electrical motors and elevators
Jose Lockhart
07/09/2025
Special inspection requirement — Lighting in dwelling units
Jose Lockhart
07/09/2025
Special inspection requirement — Energy Code Compliance Inspections
Jose Lockhart
07/09/2025
Special inspection requirement — Air barrier — testing
Jose Lockhart
07/09/2025
Special inspection requirement — Exterior lighting power
Jose Lockhart
07/09/2025
Special inspection requirement — Vestibules
Jose Lockhart
07/09/2025
Special inspection requirement — Air barrier - visual inspection
Jose Lockhart
07/09/2025
Special inspection requirement — Interior lighting power
Jose Lockhart
07/09/2025
Special inspection requirement — Masonry
Jose Lockhart
07/09/2025
Special inspection requirement — Insulation placement and R values
Jose Lockhart
07/09/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Jose Lockhart
07/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jose Lockhart
07/09/2025
Special inspection requirement — Fire-Resistance Rated Construction
Jose Lockhart
07/09/2025
Special inspection requirement — Metering
Jose Lockhart
07/09/2025
Special inspection requirement — Subgrade Inspections
Jose Lockhart
07/09/2025
Special inspection requirement — Protection of exposed foundation insulation
Jose Lockhart
07/09/2025
Special inspection requirement — Concrete - Cast-In-Place
Jose Lockhart
07/09/2025
Special inspection requirement — Fenestration areas
Jose Lockhart
07/09/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
SAMER ABOU-GHAIDA
06/23/2025
Filed — New Building
Installation of new Sprinkler/Standpipe building for new building in conjunction with NB Application no. B00766674-I1
B00766674-P8
06/23/2025
Special inspection requirement — Concrete - Cast-In-Place
Jose Lockhart
06/23/2025
Special inspection requirement — Maintenance information
Jose Lockhart
06/23/2025
Special inspection requirement — Air barrier — testing
Jose Lockhart
06/23/2025
Special inspection requirement — Insulation placement and R values
Jose Lockhart
06/23/2025
Special inspection requirement — Protection of exposed foundation insulation
Jose Lockhart
06/23/2025
Special inspection requirement — Exterior lighting power
Jose Lockhart
06/23/2025
Special inspection requirement — Electrical motors and elevators
Jose Lockhart
06/05/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B08012636-I1
06/05/2025
Signed off — New Building
Installation of new Sprinkler/Standpipe building for new building in conjunction with NB Application no. B00766674-I1
B00766674-Z1
06/05/2025
Signed off — New Building
Installation of new Sprinkler/Standpipe building for new building in conjunction with NB Application no. B00766674-I1
B00766674-S8
06/05/2025
Signed off — New Building
Installation of new Sprinkler/Standpipe building for new building in conjunction with NB Application no. B00766674-I1
B00766674-S9
05/27/2025
Signed off — Alteration
Install temporary wood Construction fence.
B00795380-I1
05/26/2025
Signed off — New Building
Installation of new Sprinkler/Standpipe building for new building in conjunction with NB Application no. B00766674-I1
B00766674-Z3
05/15/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00821256-I1
05/15/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00977534-I1
05/15/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00986910-I1
04/25/2025
Inspection — Pass-Final SD - Up to 9 Requested Floors
Pass
View inspection ↗
04/21/2025
Inspection — Fail-Final SD - Up to 9 Requested Floors
Fail
View inspection ↗
04/10/2025
Objection resolved — Addressed
04/10/2025
Objection resolved — Addressed
04/03/2025
Inspection — Certified Sprinkler (SP) - Booster Pump Test
Certified
View inspection ↗
04/03/2025
Objection raised — Other
04/03/2025
Objection raised — Other
04/02/2025
Inspection — Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve Test
Certified
View inspection ↗
04/02/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/02/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/31/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/31/2025
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
03/29/2025
Filed — New Building
Installation of new Sprinkler/Standpipe building for new building in conjunction with NB Application no. B00766674-I1
B00766674-P7
03/25/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/21/2025
Objection resolved — Addressed
03/19/2025
Objection raised — Other
03/13/2025
Filed — New Building
Installation of new Sprinkler/Standpipe building for new building in conjunction with NB Application no. B00766674-I1
B00766674-P5
02/14/2025
Permit issued — General Construction
B00766674-I1-GC
Latest 60 of 166 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedOMNI BUILD INC02/14/2025
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC12/13/2024
DOB NOWSprinklersSigned-offREAL PLUMBING CORP06/18/2024
DOB NOWStandpipeSigned-offREAL PLUMBING CORP06/18/2024
DOB NOWConstruction FenceSigned-offOMNI BUILD INC05/21/2024
DOB NOWMechanical SystemsSigned-offOMNI BUILD INC04/01/2024
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC01/29/2024
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC01/11/2024
DOB NOWStructuralSigned-offOMNI BUILD INC12/28/2023
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC12/15/2023
DOB NOWGeneral ConstructionPermit IssuedOMNI BUILD INC11/22/2023
DOB NOWPlumbingSigned-offNICE PLUMBING CORP09/13/2023
DOB NOWConstruction FenceSigned-offOMNI BUILD INC08/29/2023
DOB NOWSupport of ExcavationSigned-offOMNI BUILD INC07/03/2023
DOB NOWFoundationSigned-offOMNI BUILD INC06/30/2023
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC02/01/2023
DOB NOWSidewalk ShedPermit IssuedMETRO CONTRACTING NY, INC.01/04/2023
DOB NOWSupported ScaffoldSigned-offBAYPORT CONSTRUCTION CORP12/15/2022
DOB NOWSupported ScaffoldSigned-offBAYPORT CONSTRUCTION CORP11/03/2022
DOB NOWConstruction FenceSigned-offOMNI BUILD INC09/26/2022
BIS—ISSUEDCANDID CONNECTION INC12/27/2022
1 project · most recent 06/23/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/23/2025Permit IssuedOMNI BUILD INCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Daikin RXTQ36TAVJU 36,000 BTU · Vrf Outdoor ×20
RXTQ48TAVJU 48,000 BTU · Vrf Outdoor ×10
RXS12LVJU 12,000 BTU · Split System ×3
RXTQ60TAVJU 60,000 BTU · Vrf Outdoor ×1
RXTQ36TBVJUA 36,000 BTU · Vrf Outdoor ×20
RXTQ48TBVJUA 48,000 BTU · Vrf Outdoor ×10
RXL12WMVJU9 12,000 BTU · Split System ×1
RXTQ60TBVJUA 60,000 BTU · Vrf Outdoor ×1
Ventilation
Not Applicable Not applicable 1,100 CFM · Kitchen Exhaust ×6
1 project · most recent 06/23/2025
Sprinkler System
FiledStatusContractorScope
06/23/2025Signed-offREAL PLUMBING CORPSprinkler System
1 project · most recent 06/23/2025
Storm Water/Sanitary
FiledStatusContractorScope
06/23/2025Signed-offNICE PLUMBING CORPStorm, Water/Sanitary
3 projects · most recent 03/11/2025
General Wiring
FiledStatusContractorScope
03/11/2025CompleteI.D.K. ELECTRIC CO., INC.General Wiring
01/31/2023CompleteSOLAS ELECTRICAL CORP—
12/30/2022Permit IssuedRICHARD NEU—
1 project · most recent 06/23/2025
Concrete
FiledStatusContractorScope
06/23/2025Permit IssuedOMNI BUILD INCConcrete
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
07/31/2025Pass-Final CND-Occupancy InspectionPassView ↗
04/25/2025Pass-Final SD - Up to 9 Requested FloorsPassView ↗
04/21/2025Fail-Final SD - Up to 9 Requested FloorsFailView ↗
04/03/2025Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
04/02/2025Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
04/02/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/02/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/31/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/31/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
03/25/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/27/2024Pass-Final PL - UndergroundPassView ↗
11/15/2023Pass-Final PL - UndergroundPassView ↗
10/27/2023Pass-Final PL - UndergroundPassView ↗
09/19/2023Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 80
DateRequirementInspectorRole
07/09/2025Fenestration areasJose Lockhartenergy_progress
07/09/2025Subgrade InspectionsJose Lockhartspecial
07/09/2025Concrete - Cast-In-PlaceJose Lockhartspecial
07/09/2025Insulation placement and R valuesJose Lockhartenergy_progress
07/09/2025Lighting in dwelling unitsJose Lockhartenergy_progress
07/09/2025Air barrier - visual inspectionJose Lockhartenergy_progress
07/09/2025Fenestration air leakageJose Lockhartenergy_progress
07/09/2025Lighting controlsJose Lockhartenergy_progress
07/09/2025Electrical motors and elevatorsJose Lockhartenergy_progress
07/09/2025Interior lighting powerJose Lockhartenergy_progress
07/09/2025Maintenance informationJose Lockhartenergy_progress
07/09/2025VestibulesJose Lockhartenergy_progress
07/09/2025Excavations - Sheeting, Shoring, and BracingJose Lockhartspecial
07/09/2025Exterior lighting powerJose Lockhartenergy_progress
07/09/2025Protection of exposed foundation insulationJose Lockhartenergy_progress
07/09/2025Fenestration and door U-factor and product ratingsJose Lockhartenergy_progress
07/09/2025Air barrier — testing Jose Lockhartenergy_progress
07/09/2025MeteringJose Lockhartenergy_progress
07/09/2025Fire-Resistance Rated ConstructionJose Lockhartprogress
07/09/2025Energy Code Compliance InspectionsJose Lockhartprogress
07/09/2025Subsurface Investigations (Borings/Test Pits)SAMER ABOU-GHAIDAspecial
07/09/2025MasonryJose Lockhartspecial
07/09/2025Fire-Resistant Penetrations and JointsJose Lockhartspecial
06/23/2025MeteringJose Lockhartenergy_progress
06/23/2025Interior lighting powerJose Lockhartenergy_progress
Latest 25 of 80.
▾Documents — 213 on file (BIS + DOB NOW)
▸Plans & Drawings24
▸DOB NOWPlans/Sketch24
08/28/2026B00795380-P1Request digital key ↗
08/28/2026B00795380-I1Request digital key ↗
08/28/2026B08012636-I1Request digital key ↗
Showing 3 of 24 on file for this type
▸Applications & Permits10
▸BISBPP-5 - Authorization to the Department of Transportation2
02/20/2025340915601Open ↗
02/05/2025340915601Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION2
02/18/2025322118356Open ↗
02/05/2025340915601Open ↗
▸BISWORK PERMIT APPLICATION2
12/29/2022322158339Open ↗
12/29/2022322158339Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
02/13/2025322118356Open ↗
02/13/2025322118356Open ↗
▸DOB NOWHPD - Permit Notice2
08/13/2026B00766674-P3Open ↗
08/13/2026B00766674-I1Open ↗
▸Zoning, Tax Lot & Property Records22
▸DOB NOWRestrictive Declaration/Easement 110
08/13/2026B00766674-P8Open ↗
08/13/2026B00766674-P3Open ↗
08/13/2026B00766674-S9Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026B00766674-P8Open ↗
08/13/2026B00766674-P3Open ↗
08/13/2026B00766674-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026B00766674-P8Open ↗
08/13/2026B00766674-P3Open ↗
08/13/2026B00766674-I1Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
02/13/2025322118356Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
02/13/2025322118356Open ↗
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
02/13/2025322118356Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
02/13/2025322118356Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
02/13/2025322118356Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00766674-I1Open ↗
▸Seals & Professional Certifications106
▸DOB NOWProgress Inspector Seal & Signature51
09/29/2026B00766674-S8Open ↗
09/29/2026B00766674-S8Open ↗
09/01/2026B00766674-S5Open ↗
Showing 3 of 51 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature29
09/29/2026B00766674-S8Open ↗
09/29/2026B00766674-S8Open ↗
09/01/2026B00766674-Z1Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature24
08/28/2026B00795380-I1Open ↗
08/28/2026B00795380-P1Open ↗
08/28/2026B08012636-I1Open ↗
Showing 3 of 24 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
02/05/2025340915601Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
02/05/2025340915601Open ↗
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026B00766674-P8Open ↗
08/13/2026B00766674-P3Open ↗
08/13/2026B00766674-I1Open ↗
▸Safety & Tenant Protection10
▸DOB NOWStreet Tree Checklist3
08/27/2026B00766674-P8Open ↗
08/15/2026B00766674-P3Open ↗
08/14/2026B00766674-I1Open ↗
▸BISANTI-HARASSMENT CHECKLIST2
12/29/2022322158339Open ↗
12/29/2022322158339Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
12/29/2022322158339Open ↗
▸BISBPP: STREET TREES SITE PLAN1
02/20/2025340915601Open ↗
▸BISSTREET TREE CHECKLIST1
02/20/2025340915601Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B00766674-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00766674-I1Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
12/29/2022322158339Open ↗
▸BISRODENT CONTROL1
12/29/2022322158339Open ↗
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT3
08/13/2026B00766674-P8Open ↗
08/13/2026B00766674-P3Open ↗
08/13/2026B00766674-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00766674-I1Open ↗
▸Approvals, Objections & Sign-offs7
▸BISLETTERS - SUPPORTING DOCUMENTATION4
02/20/2025340915601Open ↗
02/13/2025322118356Open ↗
02/13/2025322118356Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter2
08/28/2026B00806225-I1Open ↗
08/13/2026B08012636-I1Open ↗
▸BISLANDMARKS APPROVAL1
12/29/2022322158339Open ↗
▸Cost, Insurance & Ownership2
▸BISPROJECT-SPECIFIC GL INSURANCE2
12/29/2022322158339Open ↗
12/29/2022322158339Open ↗
▸Filing & Intake Forms4
▸BISEFILING COVER SHEET2
02/18/2025322118356Open ↗
07/09/2022322158339Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
02/05/2025340915601Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
02/05/2025340915601Open ↗
▸Other Documents19
▸DOB NOWSite Survey: Initial3
08/13/2026B00766674-P8Open ↗
08/13/2026B00766674-P3Open ↗
08/13/2026B00766674-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026B00766674-P3Open ↗
08/13/2026B00766674-P8Open ↗
08/13/2026B00766674-I1Open ↗
▸DOB NOWProperty Ownership Certification3
08/27/2026B00766674-P8Open ↗
08/15/2026B00766674-P3Open ↗
08/14/2026B00766674-I1Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION2
03/12/2025340915601Open ↗
02/05/2025340915601Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
02/18/2025322118356Open ↗
12/29/2022322158339Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
02/20/2025340915601Open ↗
▸BISBPP: TOPOGRAPHIC SURVEY1
02/20/2025340915601Open ↗
▸BISPLOT DIAGRAM1
02/13/2025322118356Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00766674-Z1Open ↗
▸DOB NOWHPD - Completion Notice1
08/13/2026B00766674-I1Open ↗
▸DOB NOWGeotechnical Peer Review Report (BC 1818)1
08/13/2026B00766674-S9Open ↗