← Back
One story - permanent living quarter
228-15 145 AVENUE
💬 Discuss this project
1960Year Built
1Stories
A2Building Class
R3-1Zoning
984 sfGross Floor Area
1Units
One story - permanent living quarter · 4,000 sf lot · 0.25 FAR built · Flood zone X500
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TABRIZ GROUP ENTERPRISES107/24/2026
Building Lifecycle
All (22)Filed (1)Special Inspection (21)
07/24/2026
Filed — Alteration CO
PROPOSED VERTICAL AND HORIZONTAL ENLARGEMENT OF EXISTING ONE-STORY AND CELLAR BUILDING, AND CONVERSION TO TWO-DWELLING UNITS.
Q01425076-I1
07/24/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
07/22/2026
Special inspection requirement — Permanent certificate
07/22/2026
Special inspection requirement — Fenestration air leakage
07/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/22/2026
Special inspection requirement — Masonry
07/22/2026
Special inspection requirement — Energy Code Compliance Inspections
07/22/2026
Special inspection requirement — Fire-Resistance Rated Construction
07/22/2026
Special inspection requirement — Structural Wood Frame
07/22/2026
Special inspection requirement — Concrete - Cast-In-Place
07/22/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
07/22/2026
Special inspection requirement — Fenestration areas
07/22/2026
Special inspection requirement — Interior lighting power
07/22/2026
Special inspection requirement — Air barrier - visual inspection
07/22/2026
Special inspection requirement — Maintenance information
07/22/2026
Special inspection requirement — Insulation placement and R values
07/22/2026
Special inspection requirement — Metering
07/22/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
07/22/2026
Special inspection requirement — Electric vehicle service equipment requirements
07/01/2026
Special inspection requirement — Footing and Foundation
07/01/2026
Special inspection requirement — Final
07/01/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Nothing on file for this building.
1 project · most recent 07/24/2026
Wood
FiledStatusContractorScope
07/24/2026——Wood
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
07/24/2026Subsurface Investigations (Borings/Test Pits)—special
07/22/2026Permanent certificate—energy_progress
07/22/2026Fenestration air leakage—energy_progress
07/22/2026Fire-Resistant Penetrations and Joints—special
07/22/2026Masonry—special
07/22/2026Energy Code Compliance Inspections—progress
07/22/2026Fire-Resistance Rated Construction—progress
07/22/2026Structural Wood Frame—progress
07/22/2026Concrete - Cast-In-Place—special
07/22/2026Excavations - Sheeting, Shoring, and Bracing—special
07/22/2026Fenestration areas—energy_progress
07/22/2026Interior lighting power—energy_progress
07/22/2026Air barrier - visual inspection—energy_progress
07/22/2026Maintenance information—energy_progress
07/22/2026Insulation placement and R values—energy_progress
07/22/2026Metering—energy_progress
07/22/2026Fenestration and door U-factor and product ratings—energy_progress
07/22/2026Electric vehicle service equipment requirements—energy_progress
07/01/2026Footing and Foundation—progress
07/01/2026Final—progress
07/01/2026Structural Stability – Alterations of existing buildings—special
▾Documents — 5 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/16/2026Q01425076-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/16/2026Q01425076-I1Open ↗
▸Seals & Professional Certifications1
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/16/2026Q01425076-I1Open ↗
▸Inspections & Test Reports1
▸DOB NOWSOIL REPORT1
08/16/2026Q01425076-I1Open ↗
▸Other Documents1
▸DOB NOWSite Survey: Initial1
08/16/2026Q01425076-I1Open ↗