| Owner | Filings | Most Recent |
|---|---|---|
| 2022 A N J CONSTRUCTION | 4 | 03/22/2026 |
| Date | Price | Unit | Seller → Buyer | $/sf |
|---|---|---|---|---|
| 03/01/2024 | $1.5M | — | — → — | $640/sf building |
| Firm | Filings | Most Recent |
|---|---|---|
| RAS PE CONSULTING ENGINEERS | 2 | 05/06/2025 |
| GERALD CALIENDO ARCHITECTS | 5 | 02/26/2025 |
| Representative | Filings | Most Recent |
|---|---|---|
| GERALD J. CALIENDO R.A., P.C. | 7 | 03/21/2026 |
| GERALD J CALIENDO R A P C | 7 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| 2022 A N J CONSTRUCTION * | General Contractor | 6 | 07/08/2026 |
| VILLAGE P & H NY INC | Plumbing | 1 | 06/28/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| FLUSHING ENGINEERING SERV | 4373 | 6 | 05/06/2025 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | General Construction | Permit Issued | 2022 A N J CONSTRUCTION * | 05/01/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | 2022 A N J CONSTRUCTION | 11/24/2025 |
| DOB NOW | Earth Work | Permit Issued | 2022 A N J CONSTRUCTION | 10/16/2025 |
| DOB NOW | Structural | Permit Issued | 2022 A N J CONSTRUCTION | 09/24/2025 |
| DOB NOW | Plumbing | Permit Issued | VILLAGE P & H NY INC | 05/15/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | 2022 A N J CONSTRUCTION | 11/27/2024 |
| DOB NOW | Construction Fence | Permit Issued | 2022 A N J CONSTRUCTION | 10/28/2024 |
| BIS | OT | ISSUED | KORMAN DESIGN & BUILD | 01/12/2000 |
| BIS | OT | ISSUED | KORMAN DESIGN & BUILD | 04/14/1999 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 05/06/2025 | Permit Issued | 2022 A N J CONSTRUCTION | Heating Systems, Ventilation Systems | Cooling Mitsubishi Electric M4H36W06060615-B 400,000 BTU ×6 Heating Mitsubishi Electric M4H36W06060615-B 400,000 BTU ×6 Ventilation Mitsubishi Electric M4H36W06060615-B 38,000 BTU ×6 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 11/03/2025 | Permit Issued | KJK ELECTRIC INC | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/06/2025 | Permit Issued | 2022 A N J CONSTRUCTION | Steel, Concrete, Wood |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/15/2024 | Permit Issued | 2022 A N J CONSTRUCTION * | Fence |
| Date | Type | Result | Report |
|---|---|---|---|
| 08/07/2026 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 08/07/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/20/2026 | Certified Storm Drainage-ST-Piping-Roughing | Certified | View ↗ |
| 03/20/2026 | Certified Storm Drainage-ST-Piping-Underground | Certified | View ↗ |
| 03/20/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/20/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 09/08/2025 | Fail-Final Curb Cut Non-Directive 14 | Fail | View ↗ |
| 05/30/2025 | Fail-Final Curb Cut Non-Directive 14 | Fail | View ↗ |
| 08/30/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 08/02/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 05/06/2025 | Structural Steel - Details | KY FU | special |
| 05/06/2025 | Wood – Prefabricated I-Joists | KY FU | special |
| 04/22/2025 | Energy Code Compliance Inspections | KY FU | progress |
| 04/22/2025 | Subgrade Inspections | KY FU | special |
| 04/22/2025 | Excavations - Sheeting, Shoring, and Bracing | KY FU | special |
| 04/22/2025 | Mechanical Systems | KY FU | special |
| 04/22/2025 | Structural Stability – Alterations of existing buildings | KY FU | special |
| 04/22/2025 | Masonry | KY FU | special |
| 04/22/2025 | Concrete - Cast-In-Place | KY FU | special |
| 04/22/2025 | Subsurface Investigations (Borings/Test Pits) | FAHAD FATEH | special |
| 04/22/2025 | Fire-Resistant Penetrations and Joints | KY FU | special |
| 04/22/2025 | Exterior Insulation and Finish Systems (EIFS) | KY FU | special |
| 04/22/2025 | Final | KY FU | progress |
| 04/22/2025 | Fire-Resistance Rated Construction | KY FU | progress |
| 04/22/2025 | Permanent certificate | KY FU | energy_progress |
| 04/22/2025 | Interior lighting power | KY FU | energy_progress |
| 04/22/2025 | Air barrier - visual inspection | KY FU | energy_progress |
| 04/22/2025 | HVAC-R and service water heating system controls | KY FU | energy_progress |
| 04/22/2025 | Air barrier — testing | KY FU | energy_progress |
| 04/22/2025 | Electric vehicle service equipment requirements | KY FU | energy_progress |
| 04/22/2025 | Fenestration and door U-factor and product ratings | KY FU | energy_progress |
| 04/22/2025 | HVAC-R and service water heating equipment | KY FU | energy_progress |
| 04/22/2025 | Fenestration air leakage | KY FU | energy_progress |
| 04/22/2025 | Insulation placement and R values | KY FU | energy_progress |
| 04/22/2025 | Duct leakage testing, insulation and design | KY FU | energy_progress |