← Back
Single or multiple dwelling with stores or offices
228 7 AVENUE
BROOKLYN · BIN 3021145
💬 Discuss this project
1920Year Built
4Stories
S9Building Class
R6AZoning
7,380 sfGross Floor Area
8Units
Rent Stabilized4 Open Violations ▸FDNY Report ↗
Single or multiple dwelling with stores or offices · Owner of record: 228 SEVENTH AVE LLC · 2,640 sf lot · 2.8 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Floor 151p · 1 filing · 20 docs
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
Basement1p · 1 filing · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BRBK 228707/08/2026
228 SEVENTH AVE LLC1707/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/18/2019$5.0M—— → —$684/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ARCHITECTURE DURUSOY PLLC207/15/2022
ALBERTO ROMAN410/04/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEVM EXPEDITORS803/21/2026
GREEN LIGHT EXPEDITING LLC303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ORBIT PLBG & HTG INCPlumbing607/08/2026
JB CONSTRUCTION & DESIGNGeneral Contractor307/08/2026
SITRUK, MAURICEElectrical103/21/2026
TOUEY, CHRISTOPHERElectrical103/21/2026
METAL CRAFTS BY N BARSILYElectrical103/21/2026
BT'S PLUMBING AND HEATINGPlumbing107/08/2026
GC LEADER CONSTRUCTION COGeneral Contractor107/08/2026
SILVER, HUGHElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MJ ENGINEERING & DESIGN5546207/15/2022
ARCHITECTURE DURUSOY PLLC3117107/07/2022
CITISCAPE CONSULTING LTD762410/04/2021
Building Lifecycle
All (90)Filed (6)Permit Issued (5)Signed Off (4)Violation (37)Inspection (3)Objection (8)Special Inspection (27)
04/30/2026
Violation issued (HPD, closed)
A
07/10/2025
Violation issued (HPD, closed)
C
07/10/2025
Violation issued (HPD, open)
B
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/25/2023
Signed off — Alteration
1ST: RELOCATE UTILITY SINK, INSTALL NEW DISHWASHER, HANDSINK,RINSER AT BAR. REPLACE LAV, WC ON EXISTING ROUGHS . INSTALL NEW WC, LAVATORY IN NEW RESTROOM.BASEMENT: INSTALL NEW GREASE INTERCEPTOR REPLACE HOT WATER HEATER.NO GAS FIRED COOKING EQUIPMENT
B00766874-I1
05/25/2023
Signed off — Alteration
Renovations to existing mixed use structure on first floor for restaurant use under 75 people
B00766867-I1
02/17/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/17/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/08/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/18/2022
Permit issued — Plumbing
B00766874-I1-PL
09/22/2022
Permit issued — General Construction
B00766867-I1-GC
09/13/2022
Objection resolved — Addressed
09/08/2022
Objection resolved — Addressed
09/06/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Magdy Youssef
09/06/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Cemre Durusoy
09/06/2022
Special inspection requirement — HVAC-R and service water heating equipment
Cemre Durusoy
08/26/2022
Objection resolved — Addressed
07/27/2022
Objection raised — Scope
07/27/2022
Objection raised — Inspections
07/22/2022
Objection resolved — Addressed
07/21/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
Cemre Durusoy
07/21/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Magdy Youssef
07/21/2022
Special inspection requirement — Air barrier - visual inspection
Cemre Durusoy
07/21/2022
Special inspection requirement — Fenestration air leakage
Cemre Durusoy
07/20/2022
Objection raised — Inspections
07/20/2022
Objection raised — Scope
07/15/2022
Filed — Alteration
1ST: RELOCATE UTILITY SINK, INSTALL NEW DISHWASHER, HANDSINK,RINSER AT BAR. REPLACE LAV, WC ON EXISTING ROUGHS . INSTALL NEW WC, LAVATORY IN NEW RESTROOM.BASEMENT: INSTALL NEW GREASE INTERCEPTOR REPLACE HOT WATER HEATER.NO GAS FIRED COOKING EQUIPMENT
B00766874-I1
07/07/2022
Filed — Alteration
Renovations to existing mixed use structure on first floor for restaurant use under 75 people
B00766867-I1
06/30/2022
Special inspection requirement — Fenestration areas
Cemre Durusoy
06/30/2022
Special inspection requirement — Interior lighting power
Cemre Durusoy
06/30/2022
Special inspection requirement — Lighting controls
Cemre Durusoy
06/29/2022
Special inspection requirement — Fire-Resistance Rated Construction
Cemre Durusoy
06/29/2022
Special inspection requirement — Final
Cemre Durusoy
06/29/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Cemre Durusoy
11/24/2021
Signed off — Alteration
FILING MECHANICAL SYSTEMS IN CONJUNCTION TO ALTERATION TYPE 2: 340758914, NEW MECHANICAL SYSTEMS NEW COOLING & HEATING, NEW HOT WATER HEATERS INSTALLATION IN APT# 2R,2L,3R,3L,4R,4L,
B00456188-S1
11/24/2021
Signed off — Alteration
FILING MECHANICAL SYSTEMS IN CONJUNCTION TO ALTERATION TYPE 2: 340758914, NEW MECHANICAL SYSTEMS NEW COOLING & HEATING, NEW HOT WATER HEATERS INSTALLATION IN APT# 2R,2L,3R,3L,4R,4L,
B00456188-I1
10/12/2021
Violation issued (HPD, closed)
A
10/12/2021
Violation issued (HPD, closed)
C
10/12/2021
Violation issued (HPD, closed)
C
10/12/2021
Violation issued (HPD, closed)
B
10/12/2021
Violation issued (HPD, closed)
A
10/12/2021
Violation issued (HPD, closed)
A
10/12/2021
Violation issued (HPD, closed)
B
10/07/2021
Special inspection requirement — Energy Code Compliance Inspections
Joe Lieberman
10/07/2021
Special inspection requirement — Duct leakage testing, insulation and design
Joe Lieberman
10/07/2021
Special inspection requirement — HVAC-R and service water heating equipment
Joe Lieberman
10/07/2021
Special inspection requirement — HVAC-R and service water heating system controls
Joe Lieberman
10/07/2021
Special inspection requirement — Mechanical Systems
Joe Lieberman
10/07/2021
Special inspection requirement — Heating Systems
Joe Lieberman
10/07/2021
Special inspection requirement — Final
Joe Lieberman
10/07/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Joe Lieberman
10/06/2021
Special inspection requirement — Energy Code Compliance Inspections
Joe Lieberman
10/06/2021
Special inspection requirement — Maintenance information
Joe Lieberman
10/06/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joe Lieberman
10/04/2021
Filed — Alteration
FILING MECHANICAL SYSTEMS IN CONJUNCTION TO ALTERATION TYPE 2: 340758914, NEW MECHANICAL SYSTEMS NEW COOLING & HEATING, NEW HOT WATER HEATERS INSTALLATION IN APT# 2R,2L,3R,3L,4R,4L,
B00456188-P2
10/04/2021
Filed — Alteration
FILING MECHANICAL SYSTEMS IN CONJUNCTION TO ALTERATION TYPE 2: 340758914, NEW MECHANICAL SYSTEMS NEW COOLING & HEATING, NEW HOT WATER HEATERS INSTALLATION IN APT# 2R,2L,3R,3L,4R,4L,
B00456188-P1
10/01/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joe Lieberman
10/01/2021
Special inspection requirement — Maintenance information
Joe Lieberman
10/01/2021
Special inspection requirement — Energy Code Compliance Inspections
Joe Lieberman
Latest 60 of 90 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offORBIT PLBG & HTG INC11/18/2022
DOB NOWGeneral ConstructionSigned-offGC LEADER CONSTRUCTION CO09/22/2022
DOB NOWMechanical SystemsSigned-offJB CONSTRUCTION DESIGN05/05/2021
DOB NOWMechanical SystemsSigned-offJB CONSTRUCTION DESIGN04/05/2021
DOB NOWPlumbingSigned-offBT'S PLUMBING AND HEATING02/25/2021
BISOTISSUEDJB CONSTRUCTION & DESIGN12/17/2020
BISOTISSUEDTRINITY INTERIORS06/16/2005
3 projects · most recent 10/18/2022
General Wiring
FiledStatusContractorScope
10/18/2022Permit IssuedFOSTER ELEC'L SVC., INC.General Wiring
06/24/2022Permit IssuedJOSEPH WEINSTEIN ELECTRICGeneral Wiring
01/27/2021Permit IssuedE G ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
02/17/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/17/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/08/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 27
DateRequirementInspectorRole
09/06/2022Fire-Resistant Penetrations and JointsMagdy Youssefspecial
09/06/2022HVAC-R and service water piping design and insulationCemre Durusoyenergy_progress
09/06/2022HVAC-R and service water heating equipmentCemre Durusoyenergy_progress
07/21/2022Fenestration and door U-factor and product ratingsCemre Durusoyenergy_progress
07/21/2022Structural Stability – Alterations of existing buildingsMagdy Youssefspecial
07/21/2022Air barrier - visual inspectionCemre Durusoyenergy_progress
07/21/2022Fenestration air leakageCemre Durusoyenergy_progress
06/30/2022Fenestration areasCemre Durusoyenergy_progress
06/30/2022Interior lighting powerCemre Durusoyenergy_progress
06/30/2022Lighting controlsCemre Durusoyenergy_progress
06/29/2022Fire-Resistance Rated ConstructionCemre Durusoyprogress
06/29/2022FinalCemre Durusoyprogress
06/29/2022Fire-Resistant Penetrations and JointsCemre Durusoyspecial
10/07/2021Energy Code Compliance InspectionsJoe Liebermanprogress
10/07/2021Duct leakage testing, insulation and designJoe Liebermanenergy_progress
10/07/2021HVAC-R and service water heating equipmentJoe Liebermanenergy_progress
10/07/2021HVAC-R and service water heating system controlsJoe Liebermanenergy_progress
10/07/2021Mechanical SystemsJoe Liebermanspecial
10/07/2021Heating SystemsJoe Liebermanspecial
10/07/2021FinalJoe Liebermanprogress
10/07/2021HVAC-R and service water piping design and insulationJoe Liebermanenergy_progress
10/06/2021Energy Code Compliance InspectionsJoe Liebermanprogress
10/06/2021Maintenance informationJoe Liebermanenergy_progress
10/06/2021Fire-Resistant Penetrations and JointsJoe Liebermanspecial
10/01/2021Fire-Resistant Penetrations and JointsJoe Liebermanspecial
Latest 25 of 27.
▾Documents — 84 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch - Plumbing2
09/01/2026B00456188-S1Request digital key ↗
08/15/2026B00456188-P1Request digital key ↗
▸DOB NOWPlans/Sketch2
08/15/2026B00766867-I1Request digital key ↗
08/15/2026B00766874-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/01/2026B00456188-I1Request digital key ↗
08/15/2026B00456188-P2Request digital key ↗
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION3
03/08/2022340758914Open ↗
02/23/2022340758914Open ↗
08/24/2020340758914Open ↗
▸BISWORK PERMIT APPLICATION1
12/17/2020340758914Open ↗
▸Seals & Professional Certifications36
▸DOB NOWProgress Inspector Seal & Signature20
09/21/2026B00456188-S1Open ↗
09/21/2026B00456188-S1Open ↗
09/01/2026B00456188-P1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/21/2026B00456188-S1Open ↗
09/01/2026B00456188-P1Open ↗
08/29/2026B00766867-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/01/2026B00456188-I1Open ↗
09/01/2026B00456188-S1Open ↗
09/01/2026B00456188-P1Open ↗
Showing 3 of 6 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
08/24/2020340758914Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
08/24/2020340758914Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/24/2020340758914Open ↗
▸Safety & Tenant Protection1
▸BISTENANT PROTECTION PLAN AND NOTES1
08/24/2020340758914Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
09/01/2026B00456188-I1Open ↗
09/01/2026B00456188-S1Open ↗
09/01/2026B00456188-P2Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
08/24/2020340758914Open ↗
▸Energy Compliance16
▸DOB NOWEN2: As Built Energy Analysis.4
08/13/2026B00456188-I1Open ↗
08/13/2026B00456188-S1Open ↗
08/15/2026B00766867-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
08/24/2020340758914Open ↗
▸BISFENESTRATION AIR LEAKAGE1
03/21/2022340758914Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
03/21/2022340758914Open ↗
▸BISINTERIOR LIGHTING POWER1
03/21/2022340758914Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
03/21/2022340758914Open ↗
▸BISFENESTRATION AREAS1
03/21/2022340758914Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
12/17/2020340758914Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
03/21/2022340758914Open ↗
▸BISLIGHTING IN DWELLING UNITS1
03/21/2022340758914Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
03/21/2022340758914Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
03/21/2022340758914Open ↗
▸BISLIGHTING CONTROLS1
03/21/2022340758914Open ↗
▸Inspections & Test Reports3
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
03/21/2022340758914Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
03/21/2022340758914Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
12/17/2020340758914Open ↗
▸Approvals, Objections & Sign-offs3
▸BISCONSTRUCTION (OT) SIGNOFF1
03/21/2022340758914Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
03/24/2022340758914Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
03/24/2022340758914Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT1
08/24/2020340758914Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
03/21/2022340758914Open ↗
▸Filing & Intake Forms5
▸BISADDITIONAL INFORMATION4
03/08/2022340758914Open ↗
12/15/2020340758914Open ↗
10/21/2020340758914Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
08/24/2020340758914Open ↗
▸Other Documents1
▸BISMAINTENANCE INFORMATION1
03/21/2022340758914Open ↗