← Back
Two family frame
228 CROWN AVENUE
STATEN ISLAND · Annadale-Huguenot-Prince's Bay-Woodrow · BIN 5080289
💬 Discuss this project
1986Year Built
2Stories
B2Building Class
R3XZoning
3,828 sfGross Floor Area
2Units
6 Open Violations 3 unresolved · 3 paperwork only ▸FDNY Report ↗
Two family frame · 8,000 sf lot · 0.48 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Roof1p · 1 filing · 5 docs
Floor 26p · 2 filings · 10 docs
Floor 16p · 2 filings · 10 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MET DESIGN112/15/2025
STEVEN R. SAVINO ARCHITECT PC209/21/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEW APPROACH CONSULTING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RIDGE ELECTRIC CORP.Electrical103/22/2026
SEASONED HOME IMPROVEMEN*General Contractor107/08/2026
DPH PLUMBING & HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
STEVEN R. SAVINO ARCHIT1216109/21/2021
Building Lifecycle
All (42)Filed (3)Permit Issued (2)Violation (10)Inspection (3)Objection (7)Special Inspection (17)
07/13/2026
Special inspection requirement — Exterior lighting power
07/13/2026
Special inspection requirement — Interior lighting power
04/22/2026
Objection raised — Scope
03/09/2026
Violation issued (ECB, open)
Construction
01/07/2026
Violation issued (ECB, open)
Construction
12/15/2025
Filed — Alteration CO
S01289866-I1
10/27/2025
Special inspection requirement — Air barrier - visual inspection
10/13/2025
Special inspection requirement — Fire-Resistance Rated Construction
10/13/2025
Special inspection requirement — Energy Code Compliance Inspections
10/13/2025
Special inspection requirement — Insulation placement and R values
10/13/2025
Special inspection requirement — Lighting in dwelling units
10/13/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
10/13/2025
Special inspection requirement — Fenestration areas
10/13/2025
Special inspection requirement — Fenestration air leakage
10/13/2025
Special inspection requirement — Concrete - Cast-In-Place
10/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
10/13/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
07/22/2025
Violation issued (ECB, open)
Zoning
07/22/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/22/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/22/2025
Violation issued (ECB, open)
Construction
04/07/2022
Inspection — Fail-Final Construction Permit Withdrawal
Fail
View inspection ↗
02/15/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/15/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/16/2022
Permit issued — General Construction
S00580170-I1-GC
01/05/2022
Permit issued — Plumbing
S00580174-I1-PL
12/03/2021
Objection raised — Admin
12/03/2021
Objection resolved — Addressed
12/03/2021
Objection raised — Other
12/03/2021
Objection resolved — Addressed
11/10/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/20/2021
Objection raised — Scope
10/20/2021
Objection resolved — Addressed
09/21/2021
Filed — Alteration
S00580170-I1
09/21/2021
Filed — Alteration
S00580174-I1
08/27/2021
Special inspection requirement — Energy Code Compliance Inspections
Steven Savino
08/27/2021
Special inspection requirement — HVAC-R and service water heating system controls
Steven Savino
08/27/2021
Special inspection requirement — HVAC-R and service water heating equipment
Steven Savino
08/27/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Steven Savino
08/16/2021
Violation issued (ECB, closed)
Construction
11/08/1993
Violation issued (ECB, closed)
Construction
05/03/1990
Violation issued (DOB, closed)
VP*-VIOLATION UNSERVED ECB- DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedSEASONED HOME IMPROVEMEN*01/16/2022
DOB NOWPlumbingPermit IssuedDPH PLUMBING & HTG CORP01/05/2022
BISOTISSUEDSUNRUN INSTALLATION SVC10/06/2023
BIS—ISSUEDCAPITAL CONTRACTING PLMG&HTG04/06/2004
1 project · most recent 09/21/2021
Gas Water/Sanitary
FiledStatusContractorScope
09/21/2021Permit IssuedDPH PLUMBING & HTG CORPGas, Water/Sanitary
2 projects · most recent 10/09/2023
General Wiring
FiledStatusContractorScope
10/09/2023CompleteSUNRUN SOLAR ELECTL CORP—
10/10/2021Permit IssuedRIDGE ELECTRIC CORP.General Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
04/07/2022Fail-Final Construction Permit WithdrawalFailView ↗
02/15/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/15/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
07/13/2026Exterior lighting power—energy_progress
07/13/2026Interior lighting power—energy_progress
10/27/2025Air barrier - visual inspection—energy_progress
10/13/2025Fire-Resistance Rated Construction—progress
10/13/2025Energy Code Compliance Inspections—progress
10/13/2025Insulation placement and R values—energy_progress
10/13/2025Lighting in dwelling units—energy_progress
10/13/2025Fenestration and door U-factor and product ratings—energy_progress
10/13/2025Fenestration areas—energy_progress
10/13/2025Fenestration air leakage—energy_progress
10/13/2025Concrete - Cast-In-Place—special
10/13/2025Fire-Resistant Penetrations and Joints—special
10/13/2025Structural Stability – Alterations of existing buildings—special
08/27/2021Energy Code Compliance InspectionsSteven Savinoprogress
08/27/2021HVAC-R and service water heating system controlsSteven Savinoenergy_progress
08/27/2021HVAC-R and service water heating equipmentSteven Savinoenergy_progress
08/27/2021HVAC-R and service water piping design and insulationSteven Savinoenergy_progress
▾Documents — 39 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/25/2026S00580174-I1Request digital key ↗
08/17/2026S01289866-I1Request digital key ↗
08/15/2026S00580170-I1Request digital key ↗
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
10/05/2023540259049Open ↗
▸BISWORK PERMIT APPLICATION1
10/06/2023540259049Open ↗
▸Seals & Professional Certifications8
▸DOB NOWProgress Inspector Seal & Signature4
08/29/2026S00580174-I1Open ↗
08/29/2026S00580174-I1Open ↗
08/29/2026S00580174-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/25/2026S00580170-I1Open ↗
08/17/2026S01289866-I1Open ↗
08/13/2026S00580174-I1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
10/05/2023540259049Open ↗
▸Safety & Tenant Protection2
▸BISTPP1: TENANT PROTECTION PLAN1
10/05/2023540259049Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026S01289866-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/15/2026S00580170-I1Open ↗
08/13/2026S00580174-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
10/05/2023540259049Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
04/11/2024540259049Open ↗
10/06/2023540259049Open ↗
10/05/2023540259049Open ↗
▸BISSOLAR TAX ABATEMENT APPLICATION1
04/12/2024540259049Open ↗
▸BISNYCECC ANALYSIS1
10/05/2023540259049Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
10/05/2023540259049Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
04/11/2024540259049Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
10/05/2023540259049Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY4
04/11/2024540259049Open ↗
10/09/2023540259049Open ↗
10/06/2023540259049Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs4
▸BISLETTERS - SUPPORTING DOCUMENTATION3
04/12/2024540259049Open ↗
04/12/2024540259049Open ↗
10/05/2023540259049Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
04/12/2024540259049Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
04/11/2024540259049Open ↗
10/05/2023540259049Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
10/05/2023540259049Open ↗
▸Other Documents2
▸DOB NOWProperty Ownership Certification1
08/17/2026S01289866-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026S01289866-I1Open ↗