← Back
BuildNYC
Two stories - detached, small or mid-size
228 GARRETSON AVENUE
STATEN ISLAND · BIN 5049394
💬 Discuss this project
1899Year Built
2Stories
A1Building Class
R3XZoning
2,309 sfGross Floor Area
1Units
0 Active ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 7,500 sf lot · 0.31 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 14p · 2 filings · 7 docs
Site & exterior8 FT HIGH CHAIN LINK CONSTRUCTION FENCE1p · 2 filings · 4 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Guy V. Mangogna Architect508/22/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Doreen A. Rizzi, Consultant603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Omundsen ConstructionScaffold107/08/2026
R&M Piping & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A Tech Engineering NYC, P6738308/22/2022
Building Lifecycle
11/28/2023
Signed off — Alteration
S00748106-I1
11/20/2023
Permit issued — General Construction
S00748106-I1-GC
11/13/2023
Signed off — Alteration
8 FT HIGH CHAIN LINK CONSTRUCTION FENCE W/FABRIC
S00764841-I1
11/13/2023
Signed off — Alteration
S00748141-I1
04/27/2023
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
43 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offPR11/20/2023
DOB NOWPlumbingSigned-offR&M Piping & Heating04/18/2023
DOB NOWConstruction FenceSigned-offOmundsen Construction11/28/2022
1 project · most recent 09/05/2023
General Wiring
FiledStatusContractorScope
09/05/2023CompleteLMS ElectricalGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
04/27/2023Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
04/26/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 29
DateRequirementInspectorRole
08/21/2022Subgrade Inspectionsanthony santorospecial
08/21/2022Concrete - Cast-In-Placeanthony santorospecial
08/16/2022Lowest Floor Elevationanthony santoroprogress
05/31/2022Finalanthony santoroprogress
05/16/2022Structural Stability – Alterations of existing buildingsanthony santorospecial
05/06/2022Maintenance informationanthony santoroenergy_progress
05/06/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installationanthony santorospecial
05/06/2022Subgrade Inspectionsanthony santorospecial
05/06/2022Concrete - Cast-In-Placeanthony santorospecial
05/06/2022Subsurface Investigations (Borings/Test Pits)anthony santorospecial
05/06/2022Shutoff dampersanthony santoroenergy_progress
05/06/2022Electric vehicle service equipment requirementsanthony santoroenergy_progress
05/06/2022HVAC-R and service water heating system controlsanthony santoroenergy_progress
05/06/2022Insulation placement and R valuesanthony santoroenergy_progress
05/06/2022Energy Code Compliance Inspectionsanthony santoroprogress
05/06/2022Fire-Resistance Rated Constructionanthony santoroprogress
05/06/2022Structural Wood Frameanthony santoroprogress
05/06/2022Fire-Resistant Penetrations and Jointsanthony santorospecial
05/06/2022Air barrier — testing anthony santoroenergy_progress
05/06/2022Fenestration air leakageanthony santoroenergy_progress
05/06/2022HVAC-R and service water heating equipmentanthony santoroenergy_progress
05/06/2022Permanent certificateanthony santoroenergy_progress
05/06/2022Fenestration and door U-factor and product ratingsanthony santoroenergy_progress
05/06/2022Air barrier - visual inspectionanthony santoroenergy_progress
05/06/2022Fenestration areasanthony santoroenergy_progress
Latest 25 of 29.
46 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account