← Back
Primarily 2 family with 1 store or office
228 WYCKOFF AVENUE
BROOKLYN · Bushwick (West) · BIN 3325710
💬 Discuss this project
1920Year Built
2Stories
S2Building Class
R6Zoning
2,600 sfGross Floor Area
3Units
2 Open Violations 1 unresolved · 1 paperwork only ▸
Primarily 2 family with 1 store or office · Owner of record: WYCKOFF DWELLING, LLC · 4,167 sf lot · 0.62 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire ProtectionGeneralOther
Filed — no permit issued52p · 1 filing · 17 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/28/2018$1.8M—Private party → WYCKOFF DWELLING, LLC$673/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
VASILIOS ARTEMIOU PE307/29/2026
LEANDRO NILS DICKSON ARCHITECT, LLC205/05/2026
Building Lifecycle
All (87)Filed (5)Violation (4)Objection (53)Special Inspection (25)
08/21/2026
Objection raised — Structural
08/21/2026
Objection raised — Structural
08/21/2026
Objection raised — Admin
08/21/2026
Objection raised — Inspections
08/21/2026
Objection raised — Admin
08/21/2026
Objection raised — Fire_Protection
08/21/2026
Objection raised — Cost
08/21/2026
Objection raised — Scope
08/18/2026
Objection raised — Inspections
08/18/2026
Objection raised — Other
08/18/2026
Objection raised — Other
08/18/2026
Objection raised — Other
08/18/2026
Objection raised — Other
08/18/2026
Objection raised — Other
08/18/2026
Objection raised — Cost
08/18/2026
Objection raised — Other
08/18/2026
Objection raised — Inspections
07/29/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
HORIZONTAL & VERTICAL EXTENSION OF AN EXISTING 2-STORY BUILDING, PROPOSING A 4-STORY - 7 D.U. RESIDENTIAL BUILDING
B01380580-S4
07/29/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
HORIZONTAL & VERTICAL EXTENSION OF AN EXISTING 2-STORY BUILDING, PROPOSING A 4-STORY - 7 D.U. RESIDENTIAL BUILDING
B01380580-S2
07/22/2026
Objection raised — Cost
07/22/2026
Objection raised — Other
07/22/2026
Objection raised — Fire_Protection
07/22/2026
Objection raised — Energy
07/13/2026
Objection resolved — Addressed
07/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/09/2026
Special inspection requirement — Post-installed Anchors
07/08/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
HORIZONTAL & VERTICAL EXTENSION OF AN EXISTING 2-STORY BUILDING, PROPOSING A 4-STORY - 7 D.U. RESIDENTIAL BUILDING
B01380580-S3
06/29/2026
Special inspection requirement — Post-installed Anchors
06/29/2026
Special inspection requirement — Energy Code Compliance Inspections
06/29/2026
Special inspection requirement — Fire-Resistance Rated Construction
06/29/2026
Special inspection requirement — HVAC-R and service water heating equipment
06/29/2026
Special inspection requirement — Duct leakage testing, insulation and design
06/29/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
06/29/2026
Special inspection requirement — Maintenance information
06/29/2026
Special inspection requirement — HVAC-R and service water heating system controls
06/29/2026
Special inspection requirement — Shutoff dampers
06/04/2026
Objection resolved — Addressed
06/04/2026
Objection resolved — Addressed
06/04/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
06/03/2026
Objection resolved — Addressed
06/03/2026
Objection resolved — Addressed
06/03/2026
Special inspection requirement — Fire-Resistance Rated Construction
06/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/03/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
06/03/2026
Special inspection requirement — Energy Code Compliance Inspections
06/02/2026
Objection resolved — Addressed
06/01/2026
Objection resolved — Addressed
06/01/2026
Objection resolved — Addressed
06/01/2026
Objection resolved — Addressed
06/01/2026
Objection resolved — Addressed
06/01/2026
Objection resolved — Addressed
06/01/2026
Objection resolved — Addressed
05/19/2026
Objection resolved — Addressed
05/14/2026
Objection raised — Zoning
05/14/2026
Objection raised — Zoning
05/14/2026
Objection raised — Structural
05/14/2026
Objection raised — Other
05/14/2026
Objection raised — Admin
05/14/2026
Objection raised — Scope
05/14/2026
Objection raised — Scope
Latest 60 of 87 events.
Nothing on file for this building.
1 project · most recent 07/29/2026
Heating and Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
07/29/2026——Heating and Air Conditioning Systems, Heating Systems
Heat / Cool
Daikin 3MXM24AVJU9 23,000 BTU · Heat Pump Outdoor ×4
5MXM48AVJU9 46,000 BTU · Heat Pump Outdoor ×3
Heating
Qmark LFK-151F 5,120 BTU · Electric Heater ×3
1 project · most recent 07/29/2026
Sprinkler System
FiledStatusContractorScope
07/29/2026——Sprinkler System
1 project · most recent 07/29/2026
Fence
FiledStatusContractorScope
07/29/2026——Fence
▾Special Inspection Requirements (DOB NOW) — 25
DateRequirementInspectorRole
07/09/2026Fire-Resistant Penetrations and Joints—special
07/09/2026Post-installed Anchors—special
06/29/2026Post-installed Anchors—special
06/29/2026Energy Code Compliance Inspections—progress
06/29/2026Fire-Resistance Rated Construction—progress
06/29/2026HVAC-R and service water heating equipment—energy_progress
06/29/2026Duct leakage testing, insulation and design—energy_progress
06/29/2026HVAC-R and service water piping design and insulation—energy_progress
06/29/2026Maintenance information—energy_progress
06/29/2026HVAC-R and service water heating system controls—energy_progress
06/29/2026Shutoff dampers—energy_progress
06/04/2026Structural Stability – Alterations of existing buildings—special
06/03/2026Fire-Resistance Rated Construction—progress
06/03/2026Fire-Resistant Penetrations and Joints—special
06/03/2026Exterior Insulation and Finish Systems (EIFS)—special
06/03/2026Energy Code Compliance Inspections—progress
05/14/2026Fenestration and door U-factor and product ratings—energy_progress
05/14/2026Air barrier - visual inspection—energy_progress
05/14/2026Insulation placement and R values—energy_progress
05/14/2026Fenestration areas—energy_progress
05/14/2026Fenestration air leakage—energy_progress
05/04/2026Final—progress
05/04/2026Sprinkler Systems—special
05/04/2026Mechanical Systems—special
03/31/2026Structural Stability – Alterations of existing buildings—special
▾Documents — 17 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/17/2026B01380580-S4Request digital key ↗
08/17/2026B01380580-S2Request digital key ↗
08/17/2026B01380580-S1Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram1
08/17/2026B01380580-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/17/2026B01380580-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/17/2026B01380580-I1Open ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/17/2026B01380580-S4Open ↗
08/17/2026B01380580-S3Open ↗
08/17/2026B01380580-S2Open ↗
Showing 3 of 5 on file for this type
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/17/2026B01380580-I1Open ↗
▸Other Documents3
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/17/2026B01380580-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/17/2026B01380580-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/17/2026B01380580-I1Open ↗