← Back
BuildNYC
Zoned commercial or Manhattan residential
2280 ARTHUR KILL ROAD
STATEN ISLAND · BIN 5801162
💬 Discuss this project
0Year Built
—Stories
V1Building Class
M2-1Zoning
0 sfGross Floor Area
0Units
4 Active Violations 3 unresolved · 1 paperwork only ▸FDNY Report ↗
Zoned commercial or Manhattan residential · Owner of record: Aoy · 9,154 sf lot · 0 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Site & exteriorEndurant Energy18p · 5 filings · 20 docs
Filed — no permit issuedEndurant Energy1p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GI Energy507/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JLS Designs405/08/2025
Square Arch108/20/2024
Servinsky Engineering108/19/2024
Jac Engineering111/09/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LS Expeditor403/21/2026
Sologistics203/21/2026
Sparc Fire Protection Engineering103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GI EndurantGeneral Contractor707/08/2026
GI EndurantScaffold707/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Gta Engineering Services2940405/08/2025
Sq. Arch4802108/20/2024
Building Lifecycle
All (60)Filed (7)Permit Issued (8)Signed Off (1)Violation (4)Inspection (1)Objection (15)Special Inspection (24)
08/11/2026
Violation issued (ECB, open)
Construction
08/11/2026
Violation issued (ECB, open)
Construction
04/20/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/22/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/09/2025
Special inspection requirement — Concrete - Cast-In-Place
ROBERT DYKSTRA
06/09/2025
Special inspection requirement — Fire-Resistance Rated Construction
JOSEPH SULTANA, JR
06/09/2025
Special inspection requirement — Air barrier - visual inspection
JOSEPH SULTANA, JR
06/09/2025
Special inspection requirement — Insulation placement and R values
JOSEPH SULTANA, JR
06/09/2025
Special inspection requirement — Subgrade Inspections
ROBERT DYKSTRA
06/09/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
JOSEPH SULTANA, JR
06/09/2025
Special inspection requirement — Fenestration areas
JOSEPH SULTANA, JR
06/09/2025
Special inspection requirement — Fenestration air leakage
JOSEPH SULTANA, JR
05/08/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
INSTALLATION OF BESS ONLY, ESS TAX
S08031748-P1
05/01/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
JOSEPH SULTANA, JR
05/01/2025
Special inspection requirement — Concrete - Cast-In-Place
ROBERT DYKSTRA
05/01/2025
Special inspection requirement — Subgrade Inspections
ROBERT DYKSTRA
05/01/2025
Special inspection requirement — Fire-Resistance Rated Construction
JOSEPH SULTANA, JR
05/01/2025
Special inspection requirement — Air barrier - visual inspection
JOSEPH SULTANA, JR
05/01/2025
Special inspection requirement — Fenestration air leakage
JOSEPH SULTANA, JR
05/01/2025
Special inspection requirement — Fenestration areas
JOSEPH SULTANA, JR
05/01/2025
Special inspection requirement — Insulation placement and R values
JOSEPH SULTANA, JR
03/26/2025
Permit issued — General Construction
S08031748-I1-GC
03/17/2025
Signed off — Alteration
INSTALLATION OF TEMP PLYWOOD COSTRUCTION FENCE
S08011087-I1
12/11/2024
Violation issued (ECB, open)
Construction
08/30/2024
Permit issued — Foundation
S01089574-I1-GC-CX
08/26/2024
Permit issued — Solar
S01089577-I1-SL
08/20/2024
Filed — Alteration
SOLAR CANOPY INSTALLATION. CANOPY STRUCTURE APPLICATION SUBMITTED UNDER JOB# S01089574-I1.
S01089577-I1
08/19/2024
Filed — Alteration
S01089574-I1
07/31/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Kaijin Liang
07/31/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Kaijin Liang
07/31/2024
Special inspection requirement — Energy Code Compliance Inspections
Kaijin Liang
07/31/2024
Special inspection requirement — Final
Kaijin Liang
07/31/2024
Special inspection requirement — Air barrier - visual inspection
Kaijin Liang
07/11/2024
Permit issued — General Construction
S08031933-I1-GC
02/29/2024
Permit issued — Construction Fence
S08011087-I1-FN
06/26/2023
Permit issued — General Construction
S08031933-I1-GC
02/14/2023
Special inspection requirement — Subgrade Inspections
ROBERT DYKSTRA
02/13/2023
Special inspection requirement — Concrete - Cast-In-Place
ROBERT DYKSTRA
02/11/2023
Permit issued — Construction Fence
S08011087-I1-FN
01/31/2023
Objection raised — Zoning
01/31/2023
Objection resolved — Addressed
01/31/2023
Objection raised — Zoning
01/31/2023
Objection resolved — Addressed
01/31/2023
Objection raised — Admin
01/31/2023
Objection resolved — Addressed
01/31/2023
Objection raised — Zoning
01/31/2023
Objection resolved — Addressed
12/12/2022
Objection raised — Scope
12/12/2022
Objection resolved — Addressed
11/28/2022
Objection raised — Scope
11/22/2022
Filed — ALT-CO - New Building with Existing Elements to Remain
INSTALLATION OF BESS ONLY, ESS TAX
S08031748-I1
11/09/2022
Filed — Alteration
S08035146-I1
11/09/2022
Filed — Alteration
S08031933-I1
11/01/2022
Special inspection requirement — Final
JOSEPH SULTANA, JR
10/25/2022
Permit issued — Construction Fence
S08011087-I1-FN
09/30/2022
Objection raised — Inspections
09/30/2022
Objection resolved — Addressed
09/30/2022
Objection raised — Structural
09/30/2022
Objection resolved — Addressed
09/28/2022
Filed — Alteration
INSTALLATION OF TEMP PLYWOOD COSTRUCTION FENCE
S08011087-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedGI Endurant03/26/2025
DOB NOWFoundationPermit IssuedGI Endurant08/30/2024
DOB NOWSolarPermit IssuedGI Endurant08/26/2024
DOB NOWGeneral ConstructionPermit IssuedGI Endurant07/11/2024
DOB NOWConstruction FenceSigned-offGI Endurant02/29/2024
DOB NOWGeneral ConstructionPermit IssuedGI Endurant06/26/2023
DOB NOWConstruction FenceSigned-offGI Endurant02/11/2023
DOB NOWConstruction FenceSigned-offGI Endurant10/25/2022
2 projects · most recent 07/29/2024
General Wiring
FiledStatusContractorScope
07/29/2024CompleteKriscorp Electrical Contng—
07/13/2023CompleteSpartan Electrical of NYGeneral Wiring
1 project · most recent 08/20/2024
FiledStatusContractorScope
08/20/2024Permit IssuedGI Endurant22 panels, 10.78 kw
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
04/20/2026Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
06/09/2025Concrete - Cast-In-PlaceROBERT DYKSTRAspecial
06/09/2025Fire-Resistance Rated ConstructionJOSEPH SULTANA, JRprogress
06/09/2025Air barrier - visual inspectionJOSEPH SULTANA, JRenergy_progress
06/09/2025Insulation placement and R valuesJOSEPH SULTANA, JRenergy_progress
06/09/2025Subgrade InspectionsROBERT DYKSTRAspecial
06/09/2025Fenestration and door U-factor and product ratingsJOSEPH SULTANA, JRenergy_progress
06/09/2025Fenestration areasJOSEPH SULTANA, JRenergy_progress
06/09/2025Fenestration air leakageJOSEPH SULTANA, JRenergy_progress
05/01/2025Fenestration and door U-factor and product ratingsJOSEPH SULTANA, JRenergy_progress
05/01/2025Concrete - Cast-In-PlaceROBERT DYKSTRAspecial
05/01/2025Subgrade InspectionsROBERT DYKSTRAspecial
05/01/2025Fire-Resistance Rated ConstructionJOSEPH SULTANA, JRprogress
05/01/2025Air barrier - visual inspectionJOSEPH SULTANA, JRenergy_progress
05/01/2025Fenestration air leakageJOSEPH SULTANA, JRenergy_progress
05/01/2025Fenestration areasJOSEPH SULTANA, JRenergy_progress
05/01/2025Insulation placement and R valuesJOSEPH SULTANA, JRenergy_progress
07/31/2024Fire-Resistant Penetrations and JointsKaijin Liangspecial
07/31/2024Structural Stability – Alterations of existing buildingsKaijin Liangspecial
07/31/2024Energy Code Compliance InspectionsKaijin Liangprogress
07/31/2024FinalKaijin Liangprogress
07/31/2024Air barrier - visual inspectionKaijin Liangenergy_progress
02/14/2023Subgrade InspectionsROBERT DYKSTRAspecial
02/13/2023Concrete - Cast-In-PlaceROBERT DYKSTRAspecial
11/01/2022FinalJOSEPH SULTANA, JRprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Endurant EnergyIndustrial / Warehouse—
Project S08031748 ALT-CO - New Building with Existing Elements to Remain · Permit Entire · 11/22/2022
Project S08035146 Alteration · Objections · 11/09/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 59 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/23/2026S08031933-I1Request digital key ↗
08/23/2026S08035146-I1Request digital key ↗
08/21/2026S01089574-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION1
04/09/2024520468431Open ↗
▸BISBPP-16 - Application for waiver of curb alignment and/or sidewalk and curb1
02/15/2024540260885Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
02/15/2024540260885Open ↗
▸Zoning, Tax Lot & Property Records6
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED2
10/11/2024520468431Open ↗
02/15/2024540260885Open ↗
▸DOB NOWRestrictive Declaration/Easement 12
08/13/2026S08031748-P1Open ↗
08/13/2026S08031748-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026S08031748-P1Open ↗
08/13/2026S08031748-I1Open ↗
▸Seals & Professional Certifications27
▸DOB NOWProgress Inspector Seal & Signature11
09/05/2026S08031748-I1Open ↗
09/05/2026S08031748-I1Open ↗
09/05/2026S08031748-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/05/2026S08031748-I1Open ↗
09/05/2026S08031748-I1Open ↗
08/31/2026S08031933-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/21/2026S01089574-I1Open ↗
08/19/2026S08031748-P1Open ↗
08/19/2026S08031748-I1Open ↗
Showing 3 of 7 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
02/15/2024540260885Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
02/15/2024540260885Open ↗
▸Inspections & Test Reports1
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
02/15/2024540260885Open ↗
▸Approvals, Objections & Sign-offs3
▸DOB NOWOTCR Conditional Acceptance Letter2
08/13/2026S08031748-P1Open ↗
08/13/2026S08031748-I1Open ↗
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
02/15/2024540260885Open ↗
▸Filing & Intake Forms2
▸BISADDITIONAL INFORMATION1
04/30/2024520468431Open ↗
▸BISEFILING COVER SHEET1
04/09/2024520468431Open ↗
▸Other Documents10
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
05/10/2024520468431Open ↗
05/10/2024520468431Open ↗
02/15/2024540260885Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026S08031748-I1Open ↗
08/13/2026S08031748-P1Open ↗
▸DOB NOWProperty Ownership Certification2
08/19/2026S08031748-P1Open ↗
08/15/2026S08031748-I1Open ↗
▸BISBPP: TOPOGRAPHIC SURVEY1
02/15/2024540260885Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
02/15/2024540260885Open ↗
▸BISPLOT DIAGRAM1
05/10/2024520468431Open ↗