← Back
Predominantly retail with other uses
2286 ARTHUR KILL ROAD
STATEN ISLAND · BIN 5079802
💬 Discuss this project
1899Year Built
3Stories
K4Building Class
M2-1Zoning
8,700 sfGross Floor Area
3Units
1 Open Violation ▸FDNY Report ↗
Predominantly retail with other uses · 20,640 sf lot · 0.42 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Floor 1Under Construction15p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SIOZIOS REALTY803/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
STEVEN R. SAVINO ARCHITECT PC707/15/2026
M.INT'L ENGINEERING PLLC102/28/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HIGHQUALITY CONSTRUCTION VNW203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
COMPLEX DEVELOPMENT INCGeneral Contractor303/21/2026
LIFETIME SK CONSTRUCTIONGeneral Contractor303/21/2026
ETHOS PLUMBING CORPPlumbing108/04/2026
FLINT MECHANICAL CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
STEVEN R. SAVINO ARCHIT1216310/30/2025
Building Lifecycle
All (33)Filed (8)Permit Issued (4)Signed Off (1)Violation (3)Inspection (3)Special Inspection (14)
08/03/2026
Permit issued — Plumbing
S01430362-I1-PL
07/15/2026
Filed — Alteration
REMOVAL OF OLD KITCHEN EQUIPMENT AND INSTALLATION OF NEW KITCHEN EQUIPMENT AND RELOCATE TRIPLE SINK IN BAR AREA
S01430362-I1
01/20/2026
Signed off — Alteration
CAP AND REMOVE TRIPLE SINK AND INSTALL NEW HAND SINK AND TRIPLE SINK WITH ASSOCIATED PIPING ON THE FIRST FLOOR AND INSTALLATION OF GAS FIXTURES AND ASSOCIATED PIPING FOR THE NEW COOKING EQUIPMENT ON THE FIRST FLOOR.
S01187205-I1
11/05/2025
Special inspection requirement — Mechanical Systems
Steven Savino
11/05/2025
Special inspection requirement — Final
Steven Savino
10/30/2025
Filed — Alteration
INSTALLATION OF A NEW KITCHEN EXHAUST HOOK
S01201903-P1
09/03/2025
Filed — Alteration
CAP AND REMOVE TRIPLE SINK AND INSTALL NEW HAND SINK AND TRIPLE SINK WITH ASSOCIATED PIPING ON THE FIRST FLOOR AND INSTALLATION OF GAS FIXTURES AND ASSOCIATED PIPING FOR THE NEW COOKING EQUIPMENT ON THE FIRST FLOOR.
S01187205-P2
08/20/2025
Special inspection requirement — Mechanical Systems
Steven Savino
08/20/2025
Special inspection requirement — Final
Steven Savino
08/01/2025
Filed — Alteration
CAP AND REMOVE TRIPLE SINK AND INSTALL NEW HAND SINK AND TRIPLE SINK WITH ASSOCIATED PIPING ON THE FIRST FLOOR AND INSTALLATION OF GAS FIXTURES AND ASSOCIATED PIPING FOR THE NEW COOKING EQUIPMENT ON THE FIRST FLOOR.
S01187205-P1
07/25/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/02/2025
Permit issued — Mechanical Systems
S01201903-I1-MS
05/19/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/19/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/19/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/13/2025
Permit issued — Plumbing
S01187205-I1-PL
05/08/2025
Permit issued — General Construction
S01187202-I1-GC
05/02/2025
Filed — Alteration
INSTALLATION OF A NEW KITCHEN EXHAUST HOOK
S01201903-I1
04/18/2025
Filed — Alteration
CAP AND REMOVE TRIPLE SINK AND INSTALL NEW HAND SINK AND TRIPLE SINK WITH ASSOCIATED PIPING ON THE FIRST FLOOR AND INSTALLATION OF GAS FIXTURES AND ASSOCIATED PIPING FOR THE NEW COOKING EQUIPMENT ON THE FIRST FLOOR.
S01187205-I1
04/09/2025
Filed — Alteration
RENOVATION OF THE FRONT PORTION OF THE RESTAURANT/BAR AREA AND RECONFIGURATION OF THE FRONT KITCHEN AREA.
S01187202-I1
04/09/2025
Special inspection requirement — Energy Code Compliance Inspections
Steven Savino
04/03/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Steven Savino
04/03/2025
Special inspection requirement — Fenestration air leakage
Steven Savino
04/03/2025
Special inspection requirement — Lighting controls
Steven Savino
04/03/2025
Special inspection requirement — Interior lighting power
Steven Savino
04/03/2025
Special inspection requirement — Fenestration areas
Steven Savino
03/27/2025
Special inspection requirement — Fire-Resistance Rated Construction
Steven Savino
03/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Steven Savino
02/26/2025
Special inspection requirement — Final
Steven Savino
02/28/2019
Filed — No Work
S00135835-I1
02/27/2019
Special inspection requirement — Public Assembly Emergency Lighting
NANIK MASSAND
01/29/2019
Violation issued (FDNY_ORDER, closed)
08/21/2005
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedETHOS PLUMBING CORP08/03/2026
DOB NOWMechanical SystemsPermit IssuedCOMPLEX DEVELOPMENT INC07/02/2025
DOB NOWPlumbingSigned-offFLINT MECHANICAL CORP05/13/2025
DOB NOWGeneral ConstructionPermit IssuedLIFETIME SK CONSTRUCTION05/08/2025
BISOTISSUEDHIGH QUALITY CONSTRUCTION05/24/2018
BISPLISSUEDSO PLUMBING & HEATING INC05/24/2018
BISFPISSUEDIDEAL FIRE SYSTEMS INC01/16/2004
BISPLISSUEDRICHMOND PLUMBING & HEATING10/31/2003
BIS—ISSUEDPEBBLE ROCK LTD05/16/2002
BISEQISSUEDPEBBLE ROCK LTD05/16/2002
BISPLISSUEDCARMINE'S MECHANICAL INC03/15/2001
BISMHISSUEDPETER STEVEN QUANCI & ASSOC03/06/2001
BISFPISSUEDIDEAL FIRE CONTROL, INC.12/13/2000
BISPLISSUEDCARMINE'S MECHANICAL INC09/21/2000
BIS—ISSUEDPIPE & HTG GENERAL CONTRACTOR05/31/2000
1 project · most recent 10/30/2025
Others
FiledStatusContractorScopeMake / Model / Capacity
10/30/2025Permit IssuedCOMPLEX DEVELOPMENT INCOthers
Other
— NA 3,500 CFM · Kitchen Exhaust ×2
1 project · most recent 07/15/2026
Gas Water/Sanitary
FiledStatusContractorScope
07/15/2026Permit IssuedETHOS PLUMBING CORPGas, Water/Sanitary
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
05/19/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/19/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/19/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
11/05/2025Mechanical SystemsSteven Savinospecial
11/05/2025FinalSteven Savinoprogress
08/20/2025Mechanical SystemsSteven Savinospecial
08/20/2025FinalSteven Savinoprogress
04/09/2025Energy Code Compliance InspectionsSteven Savinoprogress
04/03/2025Fenestration and door U-factor and product ratingsSteven Savinoenergy_progress
04/03/2025Fenestration air leakageSteven Savinoenergy_progress
04/03/2025Lighting controlsSteven Savinoenergy_progress
04/03/2025Interior lighting powerSteven Savinoenergy_progress
04/03/2025Fenestration areasSteven Savinoenergy_progress
03/27/2025Fire-Resistance Rated ConstructionSteven Savinoprogress
03/27/2025Fire-Resistant Penetrations and JointsSteven Savinospecial
02/26/2025FinalSteven Savinoprogress
02/27/2019Public Assembly Emergency LightingNANIK MASSANDprogress
▾Documents — 37 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch7
08/19/2026S01187202-I1Request digital key ↗
08/19/2026S01201903-P1Request digital key ↗
08/19/2026S01201903-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly1
08/26/2026S00135835-I1Request digital key ↗
▸Applications & Permits3
▸BISWORK PERMIT APPLICATION2
05/29/2018520337939Open ↗
05/29/2018520337939Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
05/29/2018520337939Open ↗
▸Seals & Professional Certifications20
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/19/2026S01201903-I1Open ↗
08/16/2026S01430362-I1Open ↗
08/13/2026S01201903-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
08/31/2026S01201903-I1Open ↗
08/27/2026S01201903-P1Open ↗
08/25/2026S01187202-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/31/2026S01201903-I1Open ↗
08/27/2026S01201903-P1Open ↗
08/25/2026S01187202-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
05/29/2018520337939Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
05/29/2018520337939Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
05/29/2018520337939Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
05/29/2018520337939Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
05/29/2018520337939Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
05/29/2018520337939Open ↗
▸Approvals, Objections & Sign-offs1
▸BISADMINISTRATIVE OBJECTIONS1
05/29/2018520337939Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
05/29/2018520337939Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
05/29/2018520337939Open ↗