← Back
One story - permanent living quarter
229-08 147 AVENUE
💬 Discuss this project
1950Year Built
1.5Stories
A2Building Class
R3-1Zoning
1,000 sfGross Floor Area
1Units
One story - permanent living quarter · 4,840 sf lot · 0.21 FAR built · Flood zone AE
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
M-CON ENGINEERING, PC202/18/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUSTAINABLE STRATEGIESGeneral Contractor203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
M-CON ENGINEERING7341202/18/2025
Building Lifecycle
All (9)Filed (2)Permit Issued (1)Signed Off (1)Special Inspection (5)
04/07/2025
Signed off — Alteration
INSTALLATION OF SOLAR ELECTRIC GENERATION SYSTEM FOR UTILITY INTERCONNECTION
Q01150858-I1
02/18/2025
Filed — Alteration
INSTALLATION OF SOLAR ELECTRIC GENERATION SYSTEM FOR UTILITY INTERCONNECTION
Q01150858-P1
02/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michelle Contri
02/18/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Michelle Contri
02/18/2025
Special inspection requirement — Final
Michelle Contri
02/18/2025
Special inspection requirement — Energy Code Compliance Inspections
Michelle Contri
02/18/2025
Special inspection requirement — Air barrier - visual inspection
Michelle Contri
01/15/2025
Permit issued — Solar
Q01150858-I1-SL
01/13/2025
Filed — Alteration
INSTALLATION OF SOLAR ELECTRIC GENERATION SYSTEM FOR UTILITY INTERCONNECTION
Q01150858-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUSTAINABLE STRATEGIES01/15/2025
1 project · most recent 03/10/2025
FiledStatusContractorScope
03/10/2025CompleteSOURCE ELECTRIC INC1 meters
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
02/18/2025Fire-Resistant Penetrations and JointsMichelle Contrispecial
02/18/2025Structural Stability – Alterations of existing buildingsMichelle Contrispecial
02/18/2025FinalMichelle Contriprogress
02/18/2025Energy Code Compliance InspectionsMichelle Contriprogress
02/18/2025Air barrier - visual inspectionMichelle Contrienergy_progress
▾Documents — 10 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/21/2026Q01150858-I1Request digital key ↗
08/21/2026Q01150858-P1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/21/2026Q01150858-I1Open ↗
08/21/2026Q01150858-P1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026Q01150858-I1Open ↗
09/01/2026Q01150858-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/01/2026Q01150858-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/21/2026Q01150858-I1Open ↗
08/21/2026Q01150858-P1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01150858-I1Open ↗