← Back
Large suburban residence
229-20 53 AVENUE
QUEENS · Bayside · BIN 4161219
💬 Discuss this project
1960Year Built
1Stories
A3Building Class
R2Zoning
1,390 sfGross Floor Area
1Units
Large suburban residence · 5,733 sf lot · 0.24 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Roof1p · 1 filing · 20 docs
Floor 11p · 1 filing · 20 docs
Cellar1p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/16/2021$998K—— → —$718/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC104/11/2024
JX FLAME SOLUTION INC412/10/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
IDA DESIGN803/21/2026
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PROSPERITY CONSTRUCTION*General Contractor303/21/2026
SUNRUN INSTALLATION SVCGeneral Contractor203/21/2026
MES CONSTRUCTION CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272104/11/2024
JX FLAME SOLUTION INC7286212/10/2021
Building Lifecycle
All (45)Filed (5)Permit Issued (3)Signed Off (3)Inspection (6)Special Inspection (28)
12/09/2024
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01015826-I1
04/23/2024
Permit issued — Solar
Q01015826-I1-SL
04/11/2024
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01015826-I1
03/06/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
03/06/2024
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
03/06/2024
Special inspection requirement — Final
Walid Abdulla
03/06/2024
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
03/06/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
01/12/2022
Signed off — Alteration
HEREWITH FILING ALTERATION TO RENOVATE EXIST. ONE(1) FAMILY DETACHED HOUSE INCLUDING GENERAL CONSTRUCTION, MS AND PLUMBING WORK TYPES. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Q00527942-S1
01/12/2022
Signed off — Alteration
HEREWITH FILING ALTERATION TO RENOVATE EXIST. ONE(1) FAMILY DETACHED HOUSE INCLUDING GENERAL CONSTRUCTION, MS AND PLUMBING WORK TYPES. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Q00527942-I1
12/15/2021
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
12/13/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
JIE ZHU
12/13/2021
Special inspection requirement — Mechanical Systems
JIE ZHU
12/13/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
JIE ZHU
12/13/2021
Special inspection requirement — Final
JIE ZHU
12/13/2021
Special inspection requirement — Energy Code Compliance Inspections
JIE ZHU
12/13/2021
Special inspection requirement — Fenestration and door U-factor and product ratings
JIE ZHU
12/13/2021
Special inspection requirement — HVAC-R and service water heating equipment
JIE ZHU
12/13/2021
Special inspection requirement — Interior lighting power
JIE ZHU
12/13/2021
Special inspection requirement — HVAC-R and service water heating system controls
JIE ZHU
12/13/2021
Special inspection requirement — Ventilation and air distribution system
JIE ZHU
12/13/2021
Special inspection requirement — Permanent certificate
JIE ZHU
12/10/2021
Filed — Alteration
HEREWITH FILING ALTERATION TO RENOVATE EXIST. ONE(1) FAMILY DETACHED HOUSE INCLUDING GENERAL CONSTRUCTION, MS AND PLUMBING WORK TYPES. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Q00527942-P2
12/06/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
JIE ZHU
12/06/2021
Special inspection requirement — Final
JIE ZHU
12/06/2021
Special inspection requirement — HVAC-R and service water heating system controls
JIE ZHU
12/06/2021
Special inspection requirement — Interior lighting power
JIE ZHU
12/06/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
JIE ZHU
12/06/2021
Special inspection requirement — Permanent certificate
JIE ZHU
12/06/2021
Special inspection requirement — Ventilation and air distribution system
JIE ZHU
12/06/2021
Special inspection requirement — Fenestration and door U-factor and product ratings
JIE ZHU
12/06/2021
Special inspection requirement — HVAC-R and service water heating equipment
JIE ZHU
12/06/2021
Special inspection requirement — Energy Code Compliance Inspections
JIE ZHU
12/06/2021
Special inspection requirement — Mechanical Systems
JIE ZHU
10/24/2021
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/21/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/02/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/02/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/02/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/24/2021
Filed — Alteration
HEREWITH FILING ALTERATION TO RENOVATE EXIST. ONE(1) FAMILY DETACHED HOUSE INCLUDING GENERAL CONSTRUCTION, MS AND PLUMBING WORK TYPES. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Q00527942-P1
06/23/2021
Special inspection requirement — Energy Code Compliance Inspections
JIE ZHU
06/14/2021
Permit issued — Plumbing
Q00527942-S1-PL
06/11/2021
Permit issued — Mechanical Systems
Q00527942-I1-GC-CX
06/08/2021
Filed — Alteration
HEREWITH FILING ALTERATION TO RENOVATE EXIST. ONE(1) FAMILY DETACHED HOUSE INCLUDING GENERAL CONSTRUCTION, MS AND PLUMBING WORK TYPES. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Q00527942-S1
06/07/2021
Filed — Alteration
HEREWITH FILING ALTERATION TO RENOVATE EXIST. ONE(1) FAMILY DETACHED HOUSE INCLUDING GENERAL CONSTRUCTION, MS AND PLUMBING WORK TYPES. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Q00527942-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC04/23/2024
DOB NOWPlumbingSigned-offMES CONSTRUCTION CORP06/14/2021
DOB NOWMechanical SystemsSigned-offPROSPERITY CONSTRUCTION*06/11/2021
2 projects · most recent 04/11/2024
General Wiring
FiledStatusContractorScope
04/11/2024CompleteSUNRUN SOLAR ELECTL CORP—
06/26/2021CompleteGOODALL ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
12/15/2021Pass-Final General Construction Non-Directive 14PassView ↗
10/24/2021Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/21/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/02/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/02/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/02/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
03/06/2024Fire-Resistant Penetrations and JointsWalid Abdullaspecial
03/06/2024Air barrier - visual inspectionWalid Abdullaenergy_progress
03/06/2024FinalWalid Abdullaprogress
03/06/2024Energy Code Compliance InspectionsWalid Abdullaprogress
03/06/2024Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
12/13/2021HVAC-R and service water piping design and insulationJIE ZHUenergy_progress
12/13/2021Mechanical SystemsJIE ZHUspecial
12/13/2021Fire-Resistant Penetrations and JointsJIE ZHUspecial
12/13/2021FinalJIE ZHUprogress
12/13/2021Energy Code Compliance InspectionsJIE ZHUprogress
12/13/2021Fenestration and door U-factor and product ratingsJIE ZHUenergy_progress
12/13/2021HVAC-R and service water heating equipmentJIE ZHUenergy_progress
12/13/2021Interior lighting powerJIE ZHUenergy_progress
12/13/2021HVAC-R and service water heating system controlsJIE ZHUenergy_progress
12/13/2021Ventilation and air distribution systemJIE ZHUenergy_progress
12/13/2021Permanent certificateJIE ZHUenergy_progress
12/06/2021Fire-Resistant Penetrations and JointsJIE ZHUspecial
12/06/2021FinalJIE ZHUprogress
12/06/2021HVAC-R and service water heating system controlsJIE ZHUenergy_progress
12/06/2021Interior lighting powerJIE ZHUenergy_progress
12/06/2021HVAC-R and service water piping design and insulationJIE ZHUenergy_progress
12/06/2021Permanent certificateJIE ZHUenergy_progress
12/06/2021Ventilation and air distribution systemJIE ZHUenergy_progress
12/06/2021Fenestration and door U-factor and product ratingsJIE ZHUenergy_progress
12/06/2021HVAC-R and service water heating equipmentJIE ZHUenergy_progress
Latest 25 of 28.
▾Documents — 45 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/27/2026Q00527942-P2Request digital key ↗
08/27/2026Q00527942-P1Request digital key ↗
08/27/2026Q00527942-S1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications33
▸DOB NOWProgress Inspector Seal & Signature22
09/01/2026Q00527942-P2Open ↗
09/01/2026Q00527942-P2Open ↗
09/01/2026Q00527942-P2Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026Q00527942-P2Open ↗
09/01/2026Q00527942-P2Open ↗
08/31/2026Q01015826-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/27/2026Q00527942-S1Open ↗
08/27/2026Q00527942-I1Open ↗
08/22/2026Q01015826-I1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/27/2026Q00527942-I1Open ↗
08/27/2026Q00527942-S1Open ↗
08/22/2026Q01015826-I1Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00527942-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01015826-I1Open ↗