← Back
One family attached or semi-detached
229 92 STREET
BROOKLYN · BIN 3154722
💬 Discuss this project
1925Year Built
2Stories
A5Building Class
R4-1Zoning
1,648 sfGross Floor Area
1Units
One family attached or semi-detached · 2,000 sf lot · 0.82 FAR built · Flood zone X
Locations of Work
Architecture
Floor 22p · 1 filing · 3 docs
Floor 1
Basement3p · 1 filing · 3 docs
1 job · most recent 12/20/2024
FiledStatusContractorScope
12/20/2024CompleteALL PRO ELEC. OF N.Y. INC1 meters
Building Lifecycle
All (8)Filed (2)Permit Issued (2)Signed Off (2)Inspection (2)
05/26/2023
Signed off — Alteration
RENOVATION AT EXISTING 2ND FLOOR BATHROOM, ADD NEW BATHROOM, AND NEW WASHER. NO CHANGE IN USE, OCCUPANCY OR USE.
B08001881-I1
05/26/2023
Signed off — Alteration
B08001056-I1
01/05/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/23/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/07/2022
Permit issued — Plumbing
B08001881-I1-PL
10/28/2022
Permit issued — General Construction
B08001056-I1-GC
10/05/2022
Filed — Alteration
RENOVATION AT EXISTING 2ND FLOOR BATHROOM, ADD NEW BATHROOM, AND NEW WASHER. NO CHANGE IN USE, OCCUPANCY OR USE.
B08001881-I1
09/14/2022
Filed — Alteration
B08001056-I1
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/02/2022$1.2M—Private party → Private party$705/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHEUNG SHOWMAN ARCHITECTS210/05/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
C&C ELITE RENOVATIONS LLCGeneral Contractor107/08/2026
EVERGREEN MECHANICAL CORPPlumbing107/08/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offOZERY PLBG & HTG INC11/07/2022
DOB NOWGeneral ConstructionSigned-offC&C ELITE RENOVATIONS LLC10/28/2022
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
01/05/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/23/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
10/04/2022Energy Code Compliance InspectionsEsther Cheungprogress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/28/2026B08001056-I1Request digital key ↗
08/28/2026B08001881-I1Request digital key ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/28/2026B08001056-I1Open ↗
08/28/2026B08001881-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
09/02/2026B08001881-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/28/2026B08001056-I1Open ↗
08/28/2026B08001881-I1Open ↗