229 EAST 28TH STREET
MANHATTAN · BIN 1019895
💬 Discuss this project
1962Year Built
7Stories
D4Building Class
R8BZoning
44,912 sfGross Floor Area
84Units
LL97 CoveredRent Stabilized44 Active Violations ▸FISP: SWARMP
Elevator cooperative · Owner of record: 229 East 28 St Owners · 9,875 sf lot · 4.55 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofWireless Propco LLC7p · 3 filings · 20 docs
Floor 74p · 1 filing · 15 docs
Floor 6Unit 6J, Unit 6K7p · 2 filings · 20 docs
Floor 5Unit 5A8p · 2 filings · 18 docs
Floor 44p · 1 filing · 15 docs
Floor 3Unit 3M14p · 3 filings · 20 docs
Floor 24p · 1 filing · 15 docs
Floor 1Interior alteration work, bathroom12p · 3 filings · 20 docs
CellarMinor apartment renovation including kitchen3p · 1 filing · 4 docs
Site & exteriorHeavy duty sidewalk shed installation9p · 2 filings · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
229 E 28 St Owners1503/21/2026
Wireless Propco807/08/2026
229 East 28th Street Owners603/22/2026
229 Owners203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
American IndustriesGeneral Contractor507/08/2026
Upper Restorationspecialty_contractor407/08/2026
Central Construction ManagementScaffold403/21/2026
MLN Real EstateGeneral Contractor303/21/2026
PasrGeneral Contractor303/21/2026
Everyday MechanicalPlumbing207/08/2026
RC3 Electricspecialty_contractor204/09/2026
Crossfield Plumbing & HeatingPlumbing107/08/2026
Otec Plumbing & Heating ServicesPlumbing107/08/2026
Timothy Coleman LicensedElectrical103/21/2026
Multi TelecomGeneral Contractor107/08/2026
Plinio DesignGeneral Contractor107/08/2026
Pofi ConstructionGeneral Contractor104/08/2026
Andamio ScaffoldingScaffold107/08/2026
Triera ContractingScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Rock Arch Engineering7831212/12/2024
Howard L Zimmerman Architects1712102/29/2024
KMB Design Group513206/26/2023
Gee2000 Architect691211/08/2022
Jose A Santos PE3292103/21/2022
Architectural Engineering6111110/26/2021
Building Lifecycle
All (162)Filed (20)Permit Issued (22)Signed Off (11)Facade (FISP) (15)Violation (60)Inspection (6)Objection (18)Special Inspection (10)
06/17/2026
Signed off — Alteration
Modification of existing Verizon site. Install 3 new antenna, replace 6 antenna, replace 6 RRH units, relocate 2 GPS units, remove 1 equipment cabinet, install 3 equipment cabinets on new steel platform. Install 2 microwave dishes
M00708231-I1
01/08/2026
Signed off — Alteration
Minor plumbing as per plan. No change to use egress or occuoancy udner this application.
M01231135-S1
12/02/2025
Cycle 10 facade report submitted
12/02/2025
Cycle 10 facade report signed — SAFE
11/25/2025
Filed — Alteration
Minor plumbing as per plan. No change to use egress or occuoancy udner this application.
M01231135-P1
11/10/2025
Cycle 10 facade inspection completed
11/05/2025
Signed off — Alteration
Minor plumbing as per plan. No change to use egress or occuoancy udner this application.
M01231135-I1
11/04/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/22/2025
Permit issued — Antenna
M00708231-I1-AN
10/06/2025
Signed off — Alteration
M01010305-I1
09/26/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01202322-I1
09/11/2025
Signed off — Alteration
M01010305-S1
09/09/2025
Permit issued — Plumbing
M01231135-S1-PL
08/07/2025
Permit issued — General Construction
M01231135-I1-GC
07/15/2025
Objection resolved — Addressed
07/07/2025
Objection resolved — Addressed
06/09/2025
Objection raised — Admin
06/09/2025
Objection raised — Admin
05/30/2025
Filed — Alteration
Minor plumbing as per plan. No change to use egress or occuoancy udner this application.
M01231135-S1
05/30/2025
Filed — Alteration
Minor plumbing as per plan. No change to use egress or occuoancy udner this application.
M01231135-I1
05/29/2025
Special inspection requirement — Final
ALLEN AZARKIAN
04/03/2025
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01202322-I1
04/03/2025
Permit issued — Sidewalk Shed
M01202322-I1-SH
12/19/2024
Special inspection requirement — Post-installed Anchors
Muhammad Muhaysin
12/12/2024
Filed — Alteration
M01010305-P1
12/12/2024
Special inspection requirement — Post-installed Anchors
Muhammad Muhaysin
11/14/2024
Filed — Alteration
M01010305-S1
11/14/2024
Permit issued — Suspended Scaffold
M01010305-S1-SC
10/07/2024
Permit issued — Antenna
M00708231-I1-AN
10/01/2024
Permit issued — General Construction
M01010305-I1-GC
09/09/2024
Violation issued (HPD, open)
B
09/09/2024
Violation issued (HPD, open)
B
09/09/2024
Violation issued (HPD, open)
B
09/09/2024
Violation issued (HPD, open)
C
09/09/2024
Violation issued (HPD, open)
B
09/09/2024
Violation issued (HPD, open)
B
09/09/2024
Violation issued (HPD, open)
B
06/24/2024
Filed — Alteration
M01070069-I1
06/24/2024
Permit issued — Sidewalk Shed
M01070069-I1-SH
06/11/2024
Permit issued — Suspended Scaffold
M01054321-I1-SC
06/07/2024
Filed — Alteration
Suspended scaffold installation and use and bucket hoist as per plans filed herewith.
M01054321-I1
02/29/2024
Filed — Alteration
M01010305-I1
02/27/2024
Special inspection requirement — Tenant Protection Plan Compliance
Howard Zimmerman
02/27/2024
Special inspection requirement — Masonry
Howard Zimmerman
02/23/2024
Special inspection requirement — Final
Howard Zimmerman
12/18/2023
Signed off — Alteration
M00608897-I1
12/15/2023
Signed off — Alteration
Modifications to existing plumbing system
M00608887-I1
10/18/2023
Signed off — Alteration
Minor renovation of apartment #LA, including kitchen. No change in use, egress or occupancy.
M00869948-I1
06/30/2023
Permit issued — General Construction
M00869948-I1-GC
06/26/2023
Filed — Alteration
Modification of existing Verizon site. Install 3 new antenna, replace 6 antenna, replace 6 RRH units, relocate 2 GPS units, remove 1 equipment cabinet, install 3 equipment cabinets on new steel platform. Install 2 microwave dishes
M00708231-P1
06/14/2023
Permit issued — General Construction
M00869948-I1-GC
05/26/2023
Signed off — Alteration
Interior renovation & apartment combination of #6j & #6k to 6JK on 6th floor of an existing 6-story brick building. Partition work as per plan. No change in use, occupancy, or exit.
M08033349-S1
05/17/2023
Filed — Alteration
Minor renovation of apartment #LA, including kitchen. No change in use, egress or occupancy.
M00869948-I1
05/16/2023
Special inspection requirement — Final
David Anderson
05/10/2023
Signed off — Alteration
Interior renovation & apartment combination of #6j & #6k to 6JK on 6th floor of an existing 6-story brick building. Partition work as per plan. No change in use, occupancy, or exit.
M08033349-I1
05/03/2023
Violation issued (HPD, open)
B
05/03/2023
Violation issued (HPD, open)
C
05/03/2023
Violation issued (HPD, open)
C
03/16/2023
Violation issued (HPD, open)
C
03/16/2023
Violation issued (HPD, closed)
B
Latest 60 of 162 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWAntennaSigned-offRC3 Electric10/22/2025
DOB NOWPlumbingSigned-offCrossfield Plumbing & Heating09/09/2025
DOB NOWGeneral ConstructionSigned-offMLN Real Estate08/07/2025
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding04/03/2025
DOB NOWSuspended ScaffoldSigned-offPofi Construction11/14/2024
DOB NOWAntennaSigned-offRC3 Electric10/07/2024
DOB NOWGeneral ConstructionSigned-offPofi Construction10/01/2024
DOB NOWSidewalk ShedPermit IssuedTriera Contracting06/24/2024
DOB NOWSuspended ScaffoldPermit IssuedSKY Tech Restoration06/11/2024
DOB NOWGeneral ConstructionSigned-offUpper Restoration06/30/2023
DOB NOWGeneral ConstructionSigned-offUpper Restoration06/14/2023
DOB NOWGeneral ConstructionSigned-offJP GC and Construction02/10/2023
DOB NOWPlumbingSigned-offOtec Plumbing & Heating Services01/20/2023
DOB NOWGeneral ConstructionSigned-offJP GC and Construction01/13/2023
DOB NOWPlumbingSigned-offEveryday Mechanical12/28/2022
DOB NOWGeneral ConstructionSigned-offPasr12/15/2022
DOB NOWAntennaSigned-offA&A Infrastructure08/12/2022
DOB NOWGeneral ConstructionPermit IssuedPlinio Design03/30/2022
DOB NOWGeneral ConstructionSigned-offJP GC and Construction12/28/2021
DOB NOWPlumbingSigned-offEveryday Mechanical12/28/2021
DOB NOWConstruction FencePermit IssuedCentral Construction Management08/12/2019
DOB NOWConstruction FencePermit IssuedCentral Construction Management01/31/2019
BISMHISSUEDPlinio Design11/04/2020
BISMHISSUEDPlinio Design07/31/2020
BISOTISSUEDDJM NYC02/05/2020
BISPLISSUEDParkset Plumbing Co05/29/2019
BISOTISSUEDSyros Construction03/18/2019
BISMHISSUEDSyros Construction03/18/2019
BISOTISSUEDDJM NYC11/29/2018
BISOTISSUEDDJM NYC06/22/2018
BISOTISSUEDSquan Construction Services09/16/2016
BISOTISSUEDSquan Construction Services08/24/2016
BISOTISSUEDTelcom Engineering GP10/23/2015
BISOTISSUEDAlcatel-Lucent USA04/16/2010
BISOTISSUEDBellet Construction Co07/21/2009
BISEQISSUEDSkyline Scaffolding Group07/14/2009
BISOTISSUEDI Crown Construction Co06/19/2009
BISOTISSUEDSba Communications Group09/04/2008
BISFBISSUEDBayside Fuel Oil12/09/1999
9 projects · most recent 04/28/2026
General Wiring
FiledStatusContractorScope
04/28/2026Permit IssuedUL ElectricalGeneral Wiring
10/15/2025CompleteEmpire Lic Electrical ContractorsGeneral Wiring
04/07/2025CompleteBorowide Elect'l Contractors—
06/24/2024Permit IssuedRichard Neu—
10/24/2023CompleteApproved ElectricGeneral Wiring
04/17/2023CompleteEvs ElectricGeneral Wiring
03/22/2022CompleteAscuatech Electrical—
02/24/2022CompleteLens Electric—
08/21/2019CompleteBernardi Electric—
1 project · most recent 06/07/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
06/07/2024Permit Issued—Suspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
11/04/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/28/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/30/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/25/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/31/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/22/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
05/29/2025FinalALLEN AZARKIANprogress
12/19/2024Post-installed AnchorsMuhammad Muhaysinspecial
12/12/2024Post-installed AnchorsMuhammad Muhaysinspecial
02/27/2024Tenant Protection Plan ComplianceHoward Zimmermanspecial
02/27/2024MasonryHoward Zimmermanspecial
02/23/2024FinalHoward Zimmermanprogress
05/16/2023FinalDavid Andersonprogress
11/07/2022Tenant Protection Plan CompliancePETER GEEspecial
11/02/2022FinalBhavesh Shahprogress
11/02/2022Fire-Resistant Penetrations and JointsPETER GEEspecial
▾Documents — 221 on file (BIS + DOB NOW)
▸Plans & Drawings20
▸DOB NOWPlans/Sketch19
09/03/2026M00608887-P1Request digital key ↗
09/03/2026M00608897-I1Request digital key ↗
09/02/2026M00663960-I1Request digital key ↗
Showing 3 of 19 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence1
09/05/2026M00124282-I1Request digital key ↗
▸Applications & Permits28
▸BISPLAN / WORK APPROVAL APPLICATION14
12/26/2018123537011Open ↗
12/26/2018123537011Open ↗
12/26/2018123537011Open ↗
Showing 3 of 14 on file for this type
▸BISWORK PERMIT APPLICATION14
07/31/2020123578413Open ↗
05/29/2019123537011Open ↗
03/18/2019123537011Open ↗
Showing 3 of 14 on file for this type
▸Seals & Professional Certifications57
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION23
11/04/2019123537011Open ↗
11/04/2019123537011Open ↗
07/31/2019123578413Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature19
09/05/2026M00124282-I1Open ↗
09/03/2026M00608897-I1Open ↗
09/02/2026M00663960-I1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/01/2026M08033349-S1Open ↗
08/31/2026M01010305-I1Open ↗
08/27/2026M01010305-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026M01231135-I1Open ↗
08/31/2026M01010305-I1Open ↗
08/26/2026M00869948-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
07/14/2009120103734Open ↗
07/09/2009120100880Open ↗
06/10/2009120064205Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
07/14/2009120103734Open ↗
07/09/2009120100880Open ↗
06/10/2009120064205Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
12/26/2018123537011Open ↗
11/16/2018123537011Open ↗
▸Safety & Tenant Protection7
▸BISTenant Protection Plan and Notes6
07/31/2019123578413Open ↗
11/16/2018123537011Open ↗
08/16/2018123578413Open ↗
Showing 3 of 6 on file for this type
▸BISST-1 Street Tree Checklist1
06/10/2009120064205Open ↗
▸Environmental & Asbestos27
▸DOB NOWDEP ACP-5: Asbestos Assessment Report14
09/03/2026M00608897-I1Open ↗
09/02/2026M00663960-I1Open ↗
08/30/2026M00708231-P1Open ↗
Showing 3 of 14 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)6
11/16/2018123537011Open ↗
08/16/2018123578413Open ↗
03/30/2018123358543Open ↗
Showing 3 of 6 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'5
04/07/2010120310467Open ↗
04/07/2010120310467Open ↗
08/20/2008110318665Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
07/14/2009120103734Open ↗
07/09/2009120100880Open ↗
▸Energy Compliance20
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS13
11/04/2019123537011Open ↗
11/04/2019123537011Open ↗
07/31/2019123578413Open ↗
Showing 3 of 13 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS5
07/21/2021123358543Open ↗
11/04/2019123537011Open ↗
12/04/2017122850879Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
07/21/2021123358543Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00608897-I1Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
07/21/2021123358543Open ↗
▸Approvals, Objections & Sign-offs16
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST10
07/21/2021123358543Open ↗
11/04/2019123537011Open ↗
12/04/2017122850879Open ↗
Showing 3 of 10 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
04/07/2010120310467Open ↗
07/14/2009120103734Open ↗
07/09/2009120100880Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
01/09/2016122531625Open ↗
12/02/2009120100880Open ↗
▸Cost, Insurance & Ownership21
▸BISCOST AFFIDAVIT20
07/21/2021123358543Open ↗
11/04/2019123537011Open ↗
01/11/2019123537011Open ↗
Showing 3 of 20 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
06/22/2009120064205Open ↗
▸Filing & Intake Forms16
▸BISEFILING COVER SHEET9
12/26/2018123537011Open ↗
11/16/2018123537011Open ↗
08/16/2018123578413Open ↗
Showing 3 of 9 on file for this type
▸BISADDITIONAL INFORMATION3
07/31/2019123578413Open ↗
06/17/2019123537011Open ↗
05/22/2018123358543Open ↗
▸BISBOROUGH INTAKE FORM3
11/04/2019123537011Open ↗
12/04/2017122850879Open ↗
11/22/2017122850888Open ↗
▸BISeFiling Job Application Cover Sheet1
07/09/2009120100880Open ↗
▸Other Documents6
▸DOB NOWManufacturer's Specifications3
08/13/2026M01054321-I1Open ↗
08/13/2026M01010305-S1Open ↗
08/13/2026M01010305-P1Open ↗
▸DOB NOWCalculations3
08/13/2026M01010305-S1Open ↗
08/13/2026M01054321-I1Open ↗
08/13/2026M01010305-P1Open ↗