← Back
Walk-up apt, over six families with stores
229 EAST KINGSBRIDGE RD
BRONX · BIN 2016824
💬 Discuss this project
1921Year Built
5Stories
C7Building Class
R8Zoning
62,000 sfGross Floor Area
62Units
LL97 CoveredRent Stabilized3 Open Violations ▸
Walk-up apt, over six families with stores · Owner of record: GECAJ PORPERTIES CO., . · 12,500 sf lot · 4.96 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Floor 120p · 1 filing · 20 docs
Cellar15p · 2 filings · 20 docs
1 job · most recent 07/16/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/16/2025Permit IssuedKAST INTERIORS CONSULTINGHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric SLZ-KF09NA-NG 9,000 BTU · Vrf Indoor ×6
M4H42C09090912-B 42,000 BTU · Condensing Unit ×2
SLZ-KF12NA-NG 12,000 BTU · Vrf Indoor ×2
2 jobs · most recent 07/16/2025
Gas Water/Sanitary
FiledStatusContractorScope
07/16/2025Permit IssuedDOVAL PLBG & HTG CORPGas, Water/Sanitary
10/23/2023Permit IssuedAMC PLBG, HTG & CLNG, INCGas
2 jobs · most recent 09/29/2025
FiledStatusContractorScope
09/29/2025Permit IssuedRICHARD NEU—
04/02/2018Permit Issued4000 ELECTRIC CORP—
1 job · most recent 09/25/2025
Sidewalk Shed
FiledStatusContractorScope
09/25/2025Permit IssuedALPHA SCAFFOLDING INCSidewalk Shed
Building Lifecycle
All (99)Filed (16)Permit Issued (12)Signed Off (2)Violation (28)Inspection (11)Special Inspection (30)
04/16/2026
Violation issued (HPD, closed)
B
04/16/2026
Violation issued (HPD, closed)
B
04/16/2026
Violation issued (HPD, closed)
B
04/16/2026
Violation issued (HPD, closed)
C
04/16/2026
Violation issued (HPD, closed)
B
04/16/2026
Violation issued (HPD, closed)
B
09/26/2025
Permit issued — Sidewalk Shed
X01292892-I1-SH
09/25/2025
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
X01292892-I1
09/15/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/16/2025
Filed — Alteration
MECHANICAL APPLICATION TO INSTALL NEW METAL HOOD, EXHAUST DUCT TO ROOF, NEWS ELECTRIC HVAC SPLIT SYSTEM IN EXISTING STORE, NOT CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS.
X00880273-P2
07/16/2025
Filed — Alteration
MECHANICAL APPLICATION TO INSTALL NEW METAL HOOD, EXHAUST DUCT TO ROOF, NEWS ELECTRIC HVAC SPLIT SYSTEM IN EXISTING STORE, NOT CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS.
X00880273-P4
07/16/2025
Filed — Alteration
MECHANICAL APPLICATION TO INSTALL NEW METAL HOOD, EXHAUST DUCT TO ROOF, NEWS ELECTRIC HVAC SPLIT SYSTEM IN EXISTING STORE, NOT CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS.
X00880273-P3
07/16/2025
Special inspection requirement — HVAC-R and service water heating equipment
FRANKLYN ESTRELLA
07/16/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
FRANKLYN ESTRELLA
07/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
07/16/2025
Special inspection requirement — Tenant Protection Plan Compliance
Younes Abouyaala
07/16/2025
Special inspection requirement — Energy Code Compliance Inspections
FRANKLYN ESTRELLA
07/16/2025
Special inspection requirement — Fenestration air leakage
FRANKLYN ESTRELLA
07/16/2025
Special inspection requirement — Air barrier - visual inspection
FRANKLYN ESTRELLA
07/16/2025
Special inspection requirement — Interior lighting power
FRANKLYN ESTRELLA
07/16/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
FRANKLYN ESTRELLA
07/16/2025
Special inspection requirement — Lighting controls
FRANKLYN ESTRELLA
07/16/2025
Special inspection requirement — Energy Code Compliance Inspections
FRANKLYN ESTRELLA
07/16/2025
Special inspection requirement — Tenant Protection Plan Compliance
Younes Abouyaala
07/16/2025
Special inspection requirement — HVAC-R and service water heating system controls
FRANKLYN ESTRELLA
07/15/2025
Special inspection requirement — Tenant Protection Plan Compliance
06/10/2025
Special inspection requirement — Tenant Protection Plan Compliance
Younes Abouyaala
06/10/2025
Special inspection requirement — Energy Code Compliance Inspections
FRANKLYN ESTRELLA
06/10/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
FRANKLYN ESTRELLA
06/10/2025
Special inspection requirement — HVAC-R and service water heating equipment
FRANKLYN ESTRELLA
06/10/2025
Special inspection requirement — HVAC-R and service water heating system controls
FRANKLYN ESTRELLA
06/10/2025
Special inspection requirement — Mechanical Systems
Younes Abouyaala
06/10/2025
Special inspection requirement — Energy Code Compliance Inspections
FRANKLYN ESTRELLA
06/10/2025
Special inspection requirement — Final
NAVEEN KUMAR
06/10/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
FRANKLYN ESTRELLA
06/10/2025
Special inspection requirement — HVAC-R and service water heating system controls
FRANKLYN ESTRELLA
06/10/2025
Special inspection requirement — HVAC-R and service water heating equipment
FRANKLYN ESTRELLA
06/10/2025
Special inspection requirement — Duct leakage testing, insulation and design
FRANKLYN ESTRELLA
06/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
06/10/2025
Special inspection requirement — Tenant Protection Plan Compliance
Younes Abouyaala
06/10/2025
Special inspection requirement — Energy Code Compliance Inspections
FRANKLYN ESTRELLA
06/10/2025
Special inspection requirement — Lighting controls
FRANKLYN ESTRELLA
10/31/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/24/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/11/2024
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
08/16/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/13/2024
Permit issued — Plumbing
X00880273-S3-PL
06/07/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/04/2024
Permit issued — Plumbing
X00880273-S3-PL
05/29/2024
Filed — Alteration
MECHANICAL APPLICATION TO INSTALL NEW METAL HOOD, EXHAUST DUCT TO ROOF, NEWS ELECTRIC HVAC SPLIT SYSTEM IN EXISTING STORE, NOT CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS.
X00880273-P1
04/04/2024
Permit issued — Plumbing
X00880273-S3-PL
03/04/2024
Permit issued — Construction Fence
X00880273-S1-FN
03/04/2024
Permit issued — General Construction
X00880273-I1-GC
03/04/2024
Permit issued — Mechanical Systems
X00880273-S2-MS
12/20/2023
Signed off — Alteration
INSTALL CHIMNEY LINER IN EXISTING MASONRY CHIMNEY
X00732557-I1
12/08/2023
Signed off — Alteration
INSTALL CHIMNEY LINER IN EXISTING MASONRY CHIMNEY
X00732557-S2
11/13/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
10/31/2023
Permit issued — General Construction
X00732557-S2-GC
10/23/2023
Filed — Alteration
INSTALL CHIMNEY LINER IN EXISTING MASONRY CHIMNEY
X00732557-S2
10/23/2023
Filed — Alteration
INSTALL CHIMNEY LINER IN EXISTING MASONRY CHIMNEY
X00732557-P3
Latest 60 of 99 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BAJRAKTARI REALTY1107/08/2026
S.R.K CONTRUCTION INC703/22/2026
ALPHA SCAFFOLDING INC503/22/2026
GECAJ PORPERTIES CO., .103/22/2026
GECAJ PROPERTIES903/22/2026
BAJAKTARI REALTY MAGMT203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ALWAYS FAST SERVICES CORP109/25/2025
PETER NYIAM807/16/2025
NEW YORK ENGINEERING ASSOC., P.C.610/23/2023
GREEN DESIGN104/02/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEW YORK ENGINEERING ASSOCIATES P1203/21/2026
FRANKLYN ESTRELLA ARCHITECT PLLC1603/21/2026
ATLANTIC BUILDING SUPPLY INC.203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KAST INTERIORS CONSULTINGGeneral Contractor707/08/2026
DOVAL PLBG & HTG CORPPlumbing607/08/2026
ALPHA SCAFFOLDING INCGeneral Contractor303/21/2026
GUARANTEED HOME IMPROVEMEGeneral Contractor303/21/2026
S.R.K CONTRUCTION INCGeneral Contractor303/21/2026
RICHARD NEUElectrical103/21/2026
AMC PLBG, HTG & CLNG, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519707/16/2025
NEW YORK ENGINEERING ASSO851610/23/2023
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedALPHA SCAFFOLDING INC09/26/2025
DOB NOWPlumbingPermit IssuedDOVAL PLBG & HTG CORP08/13/2024
DOB NOWPlumbingPermit IssuedDOVAL PLBG & HTG CORP06/04/2024
DOB NOWPlumbingPermit IssuedDOVAL PLBG & HTG CORP04/04/2024
DOB NOWConstruction FencePermit IssuedKAST INTERIORS CONSULTING03/04/2024
DOB NOWGeneral ConstructionPermit IssuedKAST INTERIORS CONSULTING03/04/2024
DOB NOWMechanical SystemsPermit IssuedKAST INTERIORS CONSULTING03/04/2024
DOB NOWGeneral ConstructionSigned-offGUARANTEED HOME IMPROVEME10/31/2023
DOB NOWBoiler EquipmentSigned-offPETE GONZALEZ HEATING CO08/23/2023
DOB NOWPlumbingPermit IssuedAMC PLBG, HTG & CLNG, INC12/14/2022
DOB NOWBoiler EquipmentSigned-offPETE GONZALEZ HEATING CO07/18/2022
DOB NOWSidewalk ShedPermit IssuedS.R.K CONTRUCTION INC04/02/2018
BISOTISSUEDSYMMETRICAL CONSTRUC CORP06/21/2019
BISOTISSUEDBEST CONSTRUCTION & RESTORATION04/30/2018
BISOTISSUEDSJ EMPIRE CORP04/27/2018
BISOTISSUEDE&J ALL SEASONS CONSTRUCT05/16/2017
BISPLISSUEDCOURTESY PLUMBING INC02/09/2012
BISPLISSUEDROOTER PLUS, INC09/12/2011
BISOTISSUEDMULTILINE CONTRACTING CO05/17/2011
BISEQISSUEDP.J.B. CONTRACTING CORP04/29/2011
BISOTISSUEDPEARL CONTRACTING INC08/17/2009
BISFSISSUEDALMAR FUEL OIL CORP04/27/2001
BIS—ISSUEDGECAJ PROPERTIES CO.08/27/1991
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
09/15/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/31/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/24/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/11/2024No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
08/16/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/07/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/13/2023Pass-Final Boiler Equipment InspectionPassView ↗
09/29/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/20/2023Pass-Final CND-Occupancy InspectionPassView ↗
09/08/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
08/22/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 57
DateRequirementInspectorRole
07/16/2025HVAC-R and service water heating equipmentFRANKLYN ESTRELLAenergy_progress
07/16/2025HVAC-R and service water piping design and insulationFRANKLYN ESTRELLAenergy_progress
07/16/2025Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
07/16/2025Tenant Protection Plan ComplianceYounes Abouyaalaspecial
07/16/2025Energy Code Compliance InspectionsFRANKLYN ESTRELLAprogress
07/16/2025Fenestration air leakageFRANKLYN ESTRELLAenergy_progress
07/16/2025Air barrier - visual inspectionFRANKLYN ESTRELLAenergy_progress
07/16/2025Interior lighting powerFRANKLYN ESTRELLAenergy_progress
07/16/2025Fenestration and door U-factor and product ratingsFRANKLYN ESTRELLAenergy_progress
07/16/2025Lighting controlsFRANKLYN ESTRELLAenergy_progress
07/16/2025Energy Code Compliance InspectionsFRANKLYN ESTRELLAprogress
07/16/2025Tenant Protection Plan ComplianceYounes Abouyaalaspecial
07/16/2025HVAC-R and service water heating system controlsFRANKLYN ESTRELLAenergy_progress
07/15/2025Tenant Protection Plan Compliance—special
06/10/2025Tenant Protection Plan ComplianceYounes Abouyaalaspecial
06/10/2025Energy Code Compliance InspectionsFRANKLYN ESTRELLAprogress
06/10/2025HVAC-R and service water piping design and insulationFRANKLYN ESTRELLAenergy_progress
06/10/2025HVAC-R and service water heating equipmentFRANKLYN ESTRELLAenergy_progress
06/10/2025HVAC-R and service water heating system controlsFRANKLYN ESTRELLAenergy_progress
06/10/2025Mechanical SystemsYounes Abouyaalaspecial
06/10/2025Energy Code Compliance InspectionsFRANKLYN ESTRELLAprogress
06/10/2025FinalNAVEEN KUMARprogress
06/10/2025HVAC-R and service water piping design and insulationFRANKLYN ESTRELLAenergy_progress
06/10/2025HVAC-R and service water heating system controlsFRANKLYN ESTRELLAenergy_progress
06/10/2025HVAC-R and service water heating equipmentFRANKLYN ESTRELLAenergy_progress
Latest 25 of 57.
▾Documents — 192 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch16
08/26/2026X00031331-I1Request digital key ↗
08/22/2026X00732557-S1Request digital key ↗
08/22/2026X00732557-P2Request digital key ↗
Showing 3 of 16 on file for this type
▸Applications & Permits21
▸BISPLAN / WORK APPROVAL APPLICATION11
06/21/2019220580431Open ↗
04/26/2018240220444Open ↗
04/23/2018220580431Open ↗
Showing 3 of 11 on file for this type
▸BISWORK PERMIT APPLICATION9
06/21/2019220580431Open ↗
04/27/2018220580431Open ↗
04/26/2018240220444Open ↗
Showing 3 of 9 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
02/24/2012220117594Open ↗
▸Seals & Professional Certifications87
▸DOB NOWProgress Inspector Seal & Signature31
09/23/2026X00732557-I1Open ↗
09/23/2026X00732557-I1Open ↗
09/23/2026X00732557-I1Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature16
08/22/2026X00732557-P2Open ↗
08/22/2026X00732557-P3Open ↗
08/22/2026X00732557-S2Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
09/23/2026X00732557-I1Open ↗
09/18/2026X00880273-P1Open ↗
09/18/2026X00880273-P1Open ↗
Showing 3 of 15 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION12
05/10/2017220580431Open ↗
05/10/2017220580431Open ↗
01/16/2013220169092Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
05/10/2017220580431Open ↗
02/10/2012220169092Open ↗
05/11/2011220117594Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
02/10/2012220169092Open ↗
05/11/2011220117594Open ↗
04/27/2011220114659Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
04/26/2018240220444Open ↗
05/10/2017220580431Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
04/26/2018240220444Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
04/26/2018240220444Open ↗
▸Trade Schedules & Equipment4
▸BISSELF-CERT PLUMBING NOTICE2
12/28/2012220169092Open ↗
07/16/2012220169092Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
05/10/2017220580431Open ↗
▸BISSCHEDULE B - PLUMBING1
08/29/2011220133914Open ↗
▸Safety & Tenant Protection3
▸BISTENANT PROTECTION PLAN AND NOTES2
04/26/2018240220444Open ↗
05/10/2017220580431Open ↗
▸BISSTREET TREE CHECKLIST1
08/29/2011220133914Open ↗
▸Environmental & Asbestos20
▸DOB NOWDEP ACP-5: Asbestos Assessment Report13
08/22/2026X00732557-P2Open ↗
08/22/2026X00732557-P1Open ↗
08/22/2026X00732557-P3Open ↗
Showing 3 of 13 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
02/10/2012220169092Open ↗
08/29/2011220133914Open ↗
05/11/2011220117594Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
04/27/2011220114659Open ↗
08/17/2009220023481Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
04/26/2018240220444Open ↗
05/10/2017220580431Open ↗
▸Energy Compliance10
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
05/10/2017220580431Open ↗
05/10/2017220580431Open ↗
01/16/2013220169092Open ↗
▸BISTECHNICAL REPORT: ENERGY2
02/10/2012220169092Open ↗
02/10/2012220169092Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
04/26/2018240220444Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
04/26/2018240220444Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
01/16/2013220169092Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026X00732557-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026X00732557-I1Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
04/26/2018240220444Open ↗
▸Approvals, Objections & Sign-offs11
▸BISADMINISTRATIVE OBJECTIONS5
02/10/2012220169092Open ↗
08/29/2011220133914Open ↗
05/11/2011220117594Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
01/16/2013220169092Open ↗
02/24/2012220117594Open ↗
04/28/2010220023481Open ↗
▸BISSUPERSEDING LETTER2
06/21/2019220580431Open ↗
04/27/2018220580431Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
01/16/2013220169092Open ↗
▸Cost, Insurance & Ownership11
▸BISCOST AFFIDAVIT11
04/26/2018240220444Open ↗
04/23/2018220580431Open ↗
05/10/2017220580431Open ↗
Showing 3 of 11 on file for this type
▸Filing & Intake Forms8
▸BISEFILING COVER SHEET6
05/10/2017220580431Open ↗
02/10/2012220169092Open ↗
08/29/2011220133914Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
04/26/2018240220444Open ↗
▸BISADDITIONAL INFORMATION1
11/09/2012220169092Open ↗