← Back
Library
Morgan Library
229 MADISON AVENUE · BIN 1017186
💬 Discuss this project
1853Year Built
5Stories
P8Building Class
R7-2Zoning
76,900 sfGross Floor Area
1Units
LL97 Covered1 Open Violation ▸
Library · 15,380 sf lot · 5 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalFire Protection
Permit Issued — active, not yet Signed-off
Roof2p · 2 filings · 11 docs
Floor 31p · 1 filing · 15 docs
Floor 2
Floor 1Under Construction5p · 2 filings · 20 docs
Mezzanine1p · 1 filing · 15 docs
BasementUnder Construction5p · 4 filings · 20 docs
Sub-BasementUnder Construction4p · 2 filings · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CHIEF ENGINEER103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GOLDMAN COPELAND ASSOCIATES607/01/2026
BEYER BLINDER BELLE105/29/2026
SAFWAY ATLANTIC LLC609/15/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RPO1003/21/2026
A1 EXPEDITING SERVICE1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SAFWAY ATLANTIC, LLCGeneral Contractor1807/08/2026
JOHN O'HARA CO., INCGeneral Contractor509/02/2026
ANTHONY RANIERIElectrical103/21/2026
JAM SERVICE CO., INCFire Protection107/16/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DOMANI INSPECTION SERVICE843107/01/2026
METRIC CONSULTING AND INS1803512/17/2021
Building Lifecycle
All (100)Filed (13)Permit Issued (18)Signed Off (9)Violation (37)Inspection (2)Objection (10)Special Inspection (11)
09/01/2026
Permit issued — General Construction
M01396784-I1-GC
08/06/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/06/2026
Inspection — Certified Sprinkler - SP - Roughing
Certified
View inspection ↗
07/15/2026
Permit issued — Sprinklers
M01424067-I1-EW-SP
07/01/2026
Filed — Alteration
REMOVE AND REPLACE EXISTING DRY PIPE VALVE IN BASEMENT. REMOVE (2) AUXILLARY DRUM DRIP DRAINS ON 1ST FL LOADING DOCK. PROVIDE (1) AUXILLARY DRUM DRIP DRAIN IN 1ST FL LOADING DOCK OFF THE LAST SPRINKLER HEAD
M01424067-I1
06/29/2026
Special inspection requirement — Sprinkler Systems
JOHN MCMONAGLE
05/29/2026
Filed — Alteration
Installation of heavy-Gauge steel storage cabinets at level B3. No change in occupancy, use or egress.
M01396784-I1
06/16/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY TROLLEY BEAM SYSTEM AS PER DRAWINGS. TROLLEY BEAM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00593835-I1
06/16/2023
Signed off — Alteration
M00593536-I1
05/03/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/19/2022
Signed off — Alteration
M00129850-I1
12/19/2022
Signed off — Alteration
M00129853-I1
12/19/2022
Signed off — Alteration
M00483767-I1
12/19/2022
Signed off — Alteration
INSTALLATION OF SCAFFOLD STAIR TOWER AS PER DRAWINGS. SCAFFOLD STAIR TOWER SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00526693-I1
09/26/2022
Permit issued — Protection and Mechanical Methods
M00593835-I1-PM
09/26/2022
Permit issued — Supported Scaffold
M00593536-I1-SF
05/06/2022
Signed off — Alteration
Herewith filing to install new mounted air handler unit and add an alternate fan coil unit.-
M00440967-I1
04/27/2022
Special inspection requirement — Final
SAMI HAJJAR P.E
04/27/2022
Special inspection requirement — Mechanical Systems
SAMI HAJJAR P.E
04/20/2022
Objection resolved — Addressed
04/11/2022
Signed off — Alteration
Install a new cooling tower and associated appurtenances. No changes to use, egress or occupancy.
M00589538-I1
02/03/2022
Signed off — Alteration
Install new air handler units and associated appurtenances.
M00589582-I1
01/11/2022
Permit issued — Mechanical Systems
M00589538-I1-MS
12/18/2021
Special inspection requirement — Final
SAMI HAJJAR P.E
12/18/2021
Special inspection requirement — Mechanical Systems
SAMI HAJJAR P.E
12/17/2021
Filed — Alteration
Install new air handler units and associated appurtenances.
M00589582-P1
12/16/2021
Special inspection requirement — Mechanical Systems
SAMI HAJJAR P.E
12/16/2021
Special inspection requirement — Final
SAMI HAJJAR P.E
10/08/2021
Permit issued — Mechanical Systems
M00589582-I1-MS
10/08/2021
Permit issued — Mechanical Systems
M00589538-I1-MS
09/24/2021
Objection raised — Scope
09/23/2021
Filed — Alteration
Herewith filing to install new mounted air handler unit and add an alternate fan coil unit.-
M00440967-P1
09/15/2021
Filed — Alteration
INSTALLATION OF TEMPORARY TROLLEY BEAM SYSTEM AS PER DRAWINGS. TROLLEY BEAM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00593835-I1
09/15/2021
Filed — Alteration
M00593536-I1
09/15/2021
Filed — Alteration
Install a new cooling tower and associated appurtenances. No changes to use, egress or occupancy.
M00589538-I1
09/15/2021
Filed — Alteration
Install new air handler units and associated appurtenances.
M00589582-I1
09/15/2021
Permit issued — Protection and Mechanical Methods
M00593835-I1-PM
09/15/2021
Permit issued — Supported Scaffold
M00593536-I1-SF
09/08/2021
Special inspection requirement — Mechanical Systems
SAMI HAJJAR P.E
09/08/2021
Special inspection requirement — Final
SAMI HAJJAR P.E
09/07/2021
Special inspection requirement — Mechanical Systems
SAMI HAJJAR P.E
09/07/2021
Special inspection requirement — Final
SAMI HAJJAR P.E
05/26/2021
Filed — Alteration
INSTALLATION OF SCAFFOLD STAIR TOWER AS PER DRAWINGS. SCAFFOLD STAIR TOWER SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00526693-I1
05/26/2021
Permit issued — Supported Scaffold
M00526693-I1-SF
03/15/2021
Permit issued — Construction Fence
M00483767-I1-FN
03/11/2021
Filed — Alteration
M00483767-I1
02/24/2021
Permit issued — Mechanical Systems
M00440967-I1-MS
01/19/2021
Objection raised — Fire_Protection
01/19/2021
Objection resolved — Addressed
01/19/2021
Objection raised — Scope
01/19/2021
Objection resolved — Addressed
01/19/2021
Objection raised — Inspections
01/19/2021
Objection resolved — Addressed
01/19/2021
Objection raised — Energy
01/19/2021
Objection resolved — Addressed
01/07/2021
Filed — Alteration
Herewith filing to install new mounted air handler unit and add an alternate fan coil unit.-
M00440967-I1
12/17/2019
Permit issued — Construction Fence
M00129850-I1-FN
12/17/2019
Permit issued — Supported Scaffold
M00129853-I1-SF
09/20/2019
Permit issued — Construction Fence
M00129850-I1-FN
09/20/2019
Permit issued — Supported Scaffold
M00129853-I1-SF
Latest 60 of 100 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedJOHN O'HARA CO., INC09/01/2026
DOB NOWSprinklersPermit IssuedJAM SERVICE CO., INC07/15/2026
DOB NOWProtection and Mechanical MethodsSigned-offSAFWAY ATLANTIC, LLC09/26/2022
DOB NOWSupported ScaffoldSigned-offSAFWAY ATLANTIC, LLC09/26/2022
DOB NOWMechanical SystemsSigned-offJOHN O'HARA CO., INC01/11/2022
DOB NOWMechanical SystemsSigned-offJOHN O'HARA CO., INC10/08/2021
DOB NOWMechanical SystemsSigned-offJOHN O'HARA CO., INC10/08/2021
DOB NOWProtection and Mechanical MethodsSigned-offSAFWAY ATLANTIC, LLC09/15/2021
DOB NOWSupported ScaffoldSigned-offSAFWAY ATLANTIC, LLC09/15/2021
DOB NOWSupported ScaffoldSigned-offSAFWAY ATLANTIC, LLC05/26/2021
DOB NOWConstruction FenceSigned-offSAFWAY ATLANTIC, LLC03/15/2021
DOB NOWMechanical SystemsSigned-offJOHN O'HARA CO., INC02/24/2021
DOB NOWConstruction FenceSigned-offSAFWAY ATLANTIC, LLC12/17/2019
DOB NOWSupported ScaffoldSigned-offSAFWAY ATLANTIC, LLC12/17/2019
DOB NOWConstruction FenceSigned-offSAFWAY ATLANTIC, LLC09/20/2019
DOB NOWSupported ScaffoldSigned-offSAFWAY ATLANTIC, LLC09/20/2019
DOB NOWSupported ScaffoldSigned-offSAFWAY ATLANTIC, LLC02/14/2019
DOB NOWConstruction FenceSigned-offSAFWAY ATLANTIC, LLC02/13/2019
BISPLISSUEDPAR PLUMBING CO., INC02/22/2019
BISEQISSUEDSAFWAY ATLANTIC, LLC02/14/2019
BISEQISSUEDSAFWAY ATLANTIC, LLC02/14/2019
BISOTISSUEDJOHN O'HARA CO., INC02/04/2019
BISCCISSUEDJOHN O'HARA CO., INC07/15/2015
BISSPISSUEDSKINNER PLMNG & HTG CORP09/10/2012
BISSDISSUEDSKINNER PLMNG & HTG CORP04/18/2012
BISPLISSUEDAMERICAN PIPE&TANK LIN CO03/01/2012
BISPLISSUEDPACE PLUMBING CORP04/13/2010
BISPLISSUEDPACE PLUMBING CORP04/06/2009
BISOTISSUEDAPPLE RESTORATION & WATERPROOF02/18/2009
BISEQISSUEDAPPLE RESTORATION & WATERPROOF02/13/2009
BIS—ISSUEDF.J. SCIAME CONNSTRUCTION COM05/25/2007
BIS—ISSUEDF.J. SCIAME CONNSTRUCTION COM05/18/2006
BISFPISSUEDFIREMASTERS04/03/2006
BISPLISSUEDPACE PLUMBING CORP.09/27/2005
BIS—ISSUEDF.J. SCIAME CONNSTRUCTION COM05/13/2005
BISEQRE-ISSUEDREGIONAL SCAFFOLDING & HOISTING04/13/2005
BISEQISSUEDREGIONAL SCAFFOLDING & HOISTING01/18/2005
BISEQISSUEDFJ SCIAME CONSTRUCTION COMPANY12/14/2004
BISSPISSUEDW & M SPRINKLER - NYC LLC11/18/2004
BISPLISSUEDPACE PLUMBING CORP.08/27/2004
+ 22 more permits on file
1 project · most recent 07/01/2026
FiledStatusContractorScope
07/01/2026Permit IssuedJAM SERVICE CO., INC—
9 projects · most recent 10/21/2025
General Wiring
FiledStatusContractorScope
10/21/2025Permit IssuedH. & L. ELECTRIC INCGeneral Wiring
06/07/2022CompleteH. & L. ELECTRIC INCGeneral Wiring
09/14/2021CompleteH. & L. ELECTRIC INCGeneral Wiring
05/13/2021CompleteH. & L. ELECTRIC INCGeneral Wiring
11/09/2020CompleteH. & L. ELECTRIC INCGeneral Wiring
12/19/2019CompleteH. & L. ELECTRIC INCGeneral Wiring
05/15/2019CompleteH. & L. ELECTRIC INC—
02/20/2019CompleteH & L ELECTRIC INC.General Wiring
10/02/2018CompleteH & L ELECTRIC INC.—
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
08/06/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/06/2026Certified Sprinkler - SP - RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
06/29/2026Sprinkler SystemsJOHN MCMONAGLEspecial
04/27/2022FinalSAMI HAJJAR P.Eprogress
04/27/2022Mechanical SystemsSAMI HAJJAR P.Especial
12/18/2021FinalSAMI HAJJAR P.Eprogress
12/18/2021Mechanical SystemsSAMI HAJJAR P.Especial
12/16/2021Mechanical SystemsSAMI HAJJAR P.Especial
12/16/2021FinalSAMI HAJJAR P.Eprogress
09/08/2021Mechanical SystemsSAMI HAJJAR P.Especial
09/08/2021FinalSAMI HAJJAR P.Eprogress
09/07/2021Mechanical SystemsSAMI HAJJAR P.Especial
09/07/2021FinalSAMI HAJJAR P.Eprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Morgan Library & MuseumOtherBasement, Floors 1–3
Project M00589582 Alteration · LOC Issued · 09/15/2021
Project M00440967 Alteration · LOC Issued · 01/07/2021
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 161 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch9
09/04/2026M00483767-I1Request digital key ↗
09/03/2026M00526693-I1Request digital key ↗
09/03/2026M00589582-P1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
08/15/2026M00440967-I1Request digital key ↗
08/15/2026M00440967-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/05/2026M00129850-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/05/2026M00129853-I1Request digital key ↗
▸Applications & Permits28
▸BISPLAN / WORK APPROVAL APPLICATION11
08/04/2023102284314Open ↗
02/13/2019140832160Open ↗
02/13/2019140832179Open ↗
Showing 3 of 11 on file for this type
▸BISWORK PERMIT APPLICATION8
02/26/2019123534425Open ↗
02/13/2019140832160Open ↗
02/13/2019140832179Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWLPC Approval/Permit7
09/03/2026M00589582-I1Open ↗
08/17/2026M01396784-I1Open ↗
08/15/2026M00440967-I1Open ↗
Showing 3 of 7 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
06/20/2023140832179Open ↗
06/20/2023140832160Open ↗
▸Seals & Professional Certifications49
▸DOB NOWDPL-1: Design Professional Seal & Signature13
09/04/2026M00440967-I1Open ↗
09/04/2026M00440967-P1Open ↗
09/03/2026M00526693-I1Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION10
01/31/2020123534425Open ↗
01/31/2020123534425Open ↗
01/23/2019123534425Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/29/2026M00589582-P1Open ↗
09/01/2026M00440967-I1Open ↗
08/29/2026M00440967-P1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
02/13/2019140832160Open ↗
02/13/2019140832179Open ↗
01/23/2019123534425Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/29/2026M00589582-P1Open ↗
09/01/2026M00440967-I1Open ↗
08/29/2026M00440967-P1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
01/23/2019123534425Open ↗
07/24/2015122465064Open ↗
09/10/2009120151557Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
09/10/2009120151557Open ↗
02/12/2009110443226Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
02/13/2019140832160Open ↗
02/13/2019140832179Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
02/13/2019140832160Open ↗
02/13/2019140832179Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
01/23/2019123534425Open ↗
▸Safety & Tenant Protection1
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026M01309082-I1Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
09/03/2026M00589582-I1Open ↗
08/17/2026M01396784-I1Open ↗
08/16/2026M01424067-I1Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
09/10/2009120151557Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
02/12/2009110443226Open ↗
▸Energy Compliance6
▸DOB NOWEN2: As Built Energy Analysis.3
08/15/2026M00440967-I1Open ↗
08/13/2026M00589538-I1Open ↗
08/13/2026M00589582-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
01/23/2019123534425Open ↗
01/23/2019123534425Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
01/31/2020123534425Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
02/13/2019140832160Open ↗
02/13/2019140832179Open ↗
▸Approvals, Objections & Sign-offs30
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter13
09/03/2026M00526693-I1Open ↗
09/03/2026M00589582-I1Open ↗
09/03/2026M00593536-I1Open ↗
Showing 3 of 13 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
06/20/2023140832179Open ↗
06/20/2023140832160Open ↗
01/31/2020123534425Open ↗
Showing 3 of 6 on file for this type
▸BISLANDMARKS APPROVAL5
01/31/2020123534425Open ↗
02/13/2019140832160Open ↗
02/13/2019140832179Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
08/28/2013121709393Open ↗
09/10/2009120151557Open ↗
02/12/2009110443226Open ↗
▸BISFINAL2
06/16/2023140832160Open ↗
06/16/2023140832179Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
05/06/2010120151557Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT6
01/31/2020123534425Open ↗
01/23/2019123534425Open ↗
01/23/2019123534425Open ↗
Showing 3 of 6 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
02/18/2009110443226Open ↗
▸Filing & Intake Forms10
▸BISEFILING COVER SHEET6
01/23/2019123534425Open ↗
01/23/2019123534425Open ↗
07/24/2015122465064Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
02/13/2019140832160Open ↗
02/13/2019140832179Open ↗
▸BISADDITIONAL INFORMATION1
09/10/2009120151557Open ↗
▸BISBOROUGH INTAKE FORM1
01/31/2020123534425Open ↗
▸Other Documents5
▸BISFEE EXEMPTION DOCUMENTATION2
02/13/2019140832160Open ↗
02/13/2019140832179Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
01/10/2019123534425Open ↗
07/27/2015122465064Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
05/13/2010120151557Open ↗