← Back
Condo, retail space
229 NEVINS STREET
💬 Discuss this project
1931Year Built
4Stories
RKBuilding Class
M1-4/R7XZoning
46,545 sfGross Floor Area
4Units
LL97 Covered12 Open Violations ▸
Condo, retail space · Owner of record: 233 NEVINS STREET LLC · 14,000 sf lot · 3.32 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction40p · 7 filings · 20 docs
Floor 430p · 6 filings · 20 docs
Floor 324p · 5 filings · 20 docs
Floor 228p · 6 filings · 20 docs
Floor 1Under Construction78p · 16 filings · 20 docs
Cellar27p · 8 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
COMALLA CONSTRUCTION4107/08/2026
ROCK GROUP NY1407/08/2026
PARSONS CONSTRUCTION407/08/2026
233 NEVINS STREET2803/22/2026
CURRENT OWNER OF103/22/2026
233 NEVINS603/21/2026
239 NEVINS STREET203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
D R BROWN603/21/2026
JM ZONING, LLC.2003/21/2026
ANZALONE ARCHITECTURE1403/21/2026
CLARKE CONSTRUCTION CONSULTANTS2003/21/2026
GREEN STUDIO803/21/2026
JOEL PHAGOO P.E. PLLC103/21/2026
HUSTVEDT CUTLER ARCHITECTS403/21/2026
JP EXPEDITE603/21/2026
JOEL PHAGOO P E103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ROCK GROUP NY CORPGeneral Contractor707/08/2026
M&D FIRE SPRINKLER INCFire Protection707/08/2026
MMI PLUMBING & HEATING INC.Plumbing507/08/2026
PARK EAST CONSTRUCTIONGeneral Contractor403/22/2026
WESBUILT CONSTRUCTION MANGeneral Contractor403/21/2026
COMALLA CONSTRUCTION LLCGeneral Contractor407/08/2026
VALLESIGNS AWNINGSScaffold307/08/2026
SPECTRUM ON BROADWAY-ELECElectrical303/22/2026
N Y SIGN ARTScaffold307/08/2026
PIPE SOLUTIONS ADVIS INCPlumbing206/28/2026
DMA CONTRACTING INCGeneral Contractor203/21/2026
ALLTYPE FIRE PROTECTPlumbing203/22/2026
ALLTYPE FIRE PROTECT LLCFire Protection107/08/2026
AJC PLUMBING & HTG CORPPlumbing107/08/2026
LLOYD G DRUMMOND PLBG&GENPlumbing107/08/2026
AJC SPRINKLER CORPFire Protection107/08/2026
GMC ELECTRICAL INCElectrical103/22/2026
KNOCKOUT CONSTRUCTION INC.General Contractor107/08/2026
DORIA SCAFFOLDING LLCGeneral Contractor107/08/2026
DONE RIGHT HOOD & FIRE SAGeneral Contractor107/08/2026
PARSONS CONSTRUCTION INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SKYLINE RIGGING7880106/02/2026
ANZ CONSULTING ENGINEERIN3946701/20/2026
MT GROUP7982103/17/2025
EP INSPECTIONS AND COMMIS7079702/08/2022
DELTA TESTING LABS687311/12/2021
Building Lifecycle
All (269)Filed (58)Permit Issued (35)Signed Off (17)Violation (35)Inspection (14)Objection (80)Special Inspection (30)
06/02/2026
Filed — Alteration
INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLDS PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2022 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EGRESS AND/OR OCCUPANCY WITH THIS APPLICATION.
B01410517-I1
06/02/2026
Permit issued — Suspended Scaffold
B01410517-I1-SC
06/02/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
ZELJKO STEVANOVIC
06/02/2026
Special inspection requirement — Post-installed Anchors
ZELJKO STEVANOVIC
04/06/2026
Signed off — Alteration
B00463510-I1
03/31/2026
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
03/12/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/12/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALBERT ZIRINO
01/20/2026
Filed — Alteration
PLUMBING WORK FILED IN CONJUNCTION WITH INTERIOR TENANT RENOVATION OF FIRST FLOOR FOR COMMISSARY KITCHEN. RELATED UNDER SLAB PIPING PREVIOUSLY FILED UNDER DOB # 321927322. GENERAL CONSTRUCTION FILED UNDER SEPARATE APPLICATION.
B00271504-P3
01/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALBERT ZIRINO
01/02/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/10/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/19/2025
Permit issued — Plumbing
B00271504-I1-PL
11/18/2025
Signed off — Alteration
MODIFICATION TO EXISTING SPRINKLER SYSTEM FILED IN CONJUNCTION WITH INTERIOR TENANT RENOVATION OF FIRST FLOOR FOR COMMISSARY KITCHEN, ALT-II # 340736617.
B00323425-I1
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/12/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/30/2025
Signed off — Alteration
Install HVAC equipment sand ductwork in conjunction with buildout of Eating and Drinking Establishment.
B00751190-I1
05/21/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/16/2025
Special inspection requirement — Sprinkler Systems
ALBERT ZIRINO
03/25/2025
Special inspection requirement — HVAC-R and service water heating equipment
CHRISTOPHER BEHLE
03/25/2025
Special inspection requirement — Duct leakage testing, insulation and design
CHRISTOPHER BEHLE
03/25/2025
Special inspection requirement — Mechanical Systems
CHRISTOPHER BEHLE
03/25/2025
Special inspection requirement — Final
MICHAEL KALINOWSKI
03/25/2025
Special inspection requirement — Post-installed Anchors
CHRISTOPHER BEHLE
03/25/2025
Special inspection requirement — Shutoff dampers
CHRISTOPHER BEHLE
03/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTOPHER BEHLE
03/25/2025
Special inspection requirement — HVAC-R and service water heating system controls
CHRISTOPHER BEHLE
03/25/2025
Special inspection requirement — Maintenance information
CHRISTOPHER BEHLE
03/17/2025
Filed — Alteration
Install HVAC equipment sand ductwork in conjunction with buildout of Eating and Drinking Establishment.
B00751190-P2
03/14/2025
Special inspection requirement — Shutoff dampers
CHRISTOPHER BEHLE
03/14/2025
Special inspection requirement — HVAC-R and service water heating system controls
CHRISTOPHER BEHLE
03/14/2025
Special inspection requirement — Maintenance information
CHRISTOPHER BEHLE
03/14/2025
Special inspection requirement — Final
MICHAEL KALINOWSKI
03/14/2025
Special inspection requirement — Post-installed Anchors
CHRISTOPHER BEHLE
03/14/2025
Special inspection requirement — Mechanical Systems
CHRISTOPHER BEHLE
03/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTOPHER BEHLE
03/14/2025
Special inspection requirement — Duct leakage testing, insulation and design
CHRISTOPHER BEHLE
03/14/2025
Special inspection requirement — HVAC-R and service water heating equipment
CHRISTOPHER BEHLE
03/13/2025
Special inspection requirement — Public Assembly Emergency Lighting
RICHARD GREENWALD
03/06/2025
Filed — No Work
B00349965-P1
03/06/2025
Filed — No Work
B00349681-P1
03/06/2025
Filed — No Work
B00349973-P2
02/25/2025
Filed — Alteration
Install HVAC equipment sand ductwork in conjunction with buildout of Eating and Drinking Establishment.
B00751190-P1
02/21/2025
Signed off — Alteration
Plumbing work in conjunction with build-out of Eating and Drinking Establishment
B00763755-I1
02/21/2025
Signed off — Alteration
Build out eating and drinking establishment at part of first floor and cellar
B00699431-I1
02/20/2025
Special inspection requirement — HVAC-R and service water heating equipment
CHRISTOPHER BEHLE
02/20/2025
Special inspection requirement — Shutoff dampers
CHRISTOPHER BEHLE
02/20/2025
Special inspection requirement — Final
MICHAEL KALINOWSKI
02/20/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTOPHER BEHLE
02/20/2025
Special inspection requirement — Mechanical Systems
CHRISTOPHER BEHLE
02/20/2025
Special inspection requirement — Maintenance information
CHRISTOPHER BEHLE
02/12/2025
Filed — Alteration
MODIFICATION TO EXISTING SPRINKLER SYSTEM FILED IN CONJUNCTION WITH INTERIOR TENANT RENOVATION OF FIRST FLOOR FOR COMMISSARY KITCHEN, ALT-II # 340736617.
B00323425-P2
02/10/2025
Signed off — Alteration
Sprinkler work in conjunction with build-out of Eating and Drinking Establishment
B08001613-I1
01/22/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/21/2025
Permit issued — Sprinklers
B00323425-I1-EW-SP
11/07/2024
Signed off — Alteration
REPLACE ILLUMINATED ACCESSORY BUSINESS D/F BLADE WALL SIGN-B, REMOVE A PREVIOUS SIGN# B00609711-I1, NO CHANGE TO USE, EGRESS OR OCCUPATION
B01090441-S1
11/07/2024
Signed off — Alteration
REPLACE ILLUMINATED ACCESSORY BUSINESS D/F BLADE WALL SIGN-B, REMOVE A PREVIOUS SIGN# B00609711-I1, NO CHANGE TO USE, EGRESS OR OCCUPATION
B01090441-I1
11/07/2024
Signed off — Alteration
REPLACE ILLUMINATED ACCESSORY BUSINESS D/F BLADE WALL SIGN-B, REMOVE A PREVIOUS SIGN# B00609711-I1, NO CHANGE TO USE, EGRESS OR OCCUPATION
B01090441-S2
10/01/2024
Violation issued (ECB, closed)
Construction
Latest 60 of 269 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedDORIA SCAFFOLDING LLC06/02/2026
DOB NOWPlumbingPermit IssuedPIPE SOLUTIONS ADVIS INC11/19/2025
DOB NOWSprinklersSigned-offALLTYPE FIRE PROTECT LLC01/21/2025
DOB NOWSignSigned-offVALLESIGNS & AWNINGS INC08/15/2024
DOB NOWSignSigned-offVALLESIGNS & AWNINGS INC08/15/2024
DOB NOWSignSigned-offVALLESIGNS & AWNINGS INC08/15/2024
DOB NOWPlumbingPermit IssuedLLOYD G DRUMMOND PLBG&GEN06/16/2023
DOB NOWMechanical SystemsPermit IssuedKNOCKOUT CONSTRUCTION INC.06/09/2023
DOB NOWSprinklersSigned-offAJC SPRINKLER CORP12/02/2022
DOB NOWGeneral ConstructionSigned-offDMA CONTRACTING INC10/17/2022
DOB NOWMechanical SystemsSigned-offDONE RIGHT HOOD & FIRE SA08/17/2022
DOB NOWPlumbingSigned-offAJC PLUMBING & HTG CORP08/16/2022
DOB NOWPlumbingSigned-offMICHAEL ITSKOVICH01/27/2022
DOB NOWStructuralSigned-offWESBUILT CONSTRUCTION MAN11/23/2021
DOB NOWSignSigned-offSKANSKA BUILDING INC11/12/2021
DOB NOWSignSigned-offSKANSKA BUILDING INC11/12/2021
DOB NOWSignSigned-offSKANSKA BUILDING INC11/12/2021
DOB NOWSprinklersSigned-offM&D FIRE SPRINKLER INC09/21/2021
DOB NOWSprinklersSigned-offM&D FIRE SPRINKLER INC08/06/2021
DOB NOWPlumbingSigned-offMICHAEL ITSKOVICH07/22/2021
DOB NOWCurb CutSigned-offCOMALLA CONSTRUCTION LLC06/29/2021
DOB NOWMechanical SystemsSigned-offWESBUILT CONSTRUCTION MAN06/16/2021
DOB NOWPlumbingSigned-offM&D FIRE SPRINKLER INC06/15/2021
DOB NOWStandpipeSigned-offM&D FIRE SPRINKLER INC06/14/2021
DOB NOWSprinklersSigned-offM&D FIRE SPRINKLER INC06/14/2021
DOB NOWSidewalk ShedSigned-offROCK GROUP NY CORP09/29/2020
DOB NOWStandpipeSigned-offMICHAEL ITSKOVICH06/11/2020
DOB NOWStandpipeSigned-offM&D FIRE SPRINKLER INC06/11/2020
DOB NOWSprinklersSigned-offM&D FIRE SPRINKLER INC06/11/2020
DOB NOWMechanical SystemsPermit IssuedCOMALLA CONSTRUCTION LLC06/10/2020
DOB NOWPlumbingSigned-offMICHAEL ITSKOVICH05/21/2020
DOB NOWPlumbingSigned-offMICHAEL ITSKOVICH01/03/2020
DOB NOWSidewalk ShedSigned-offROCK GROUP NY CORP10/11/2019
DOB NOWSidewalk ShedSigned-offROCK GROUP NY CORP03/29/2019
DOB NOWSupported ScaffoldPermit IssuedPARSONS CONSTRUCTION INC03/27/2019
BISOTISSUEDKNOCKOUT CONSTRUCTION INC.06/22/2023
BIS—ISSUEDPARK EAST CONSTRUCTION12/27/2021
BISOTISSUEDWESBUILT CONSTRUCTION MAN03/18/2021
BISOTISSUEDWESBUILT CONSTRUCTION MAN01/14/2021
BIS—ISSUEDCOMALLA CONSTRUCTION LLC01/08/2021
+ 19 more permits on file
1 project · most recent 02/08/2022
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
02/08/2022Permit IssuedCOMALLA CONSTRUCTION LLCAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Daikin MPS035F 35 tons · Rooftop Unit ×3
MPS020G 20 tons ×1
MPS030F 30 tons ×1
Heating
— F3FUH07C03 25,600 BTU · Unit Heater ×45
ACBH0581CT 17,000 BTU · Unit Heater ×16
Ventilation
— BSQ-160-160-30 4,950 CFM · Exhaust Fan ×1
Greenheck G-123-VG 1,050 CFM · Exhaust Fan ×1
1 project · most recent 06/14/2022
FiledStatusContractorScope
06/14/2022———
2 projects · most recent 01/20/2026
Gas Water/Sanitary
FiledStatusContractorScope
01/20/2026Permit IssuedPIPE SOLUTIONS ADVIS INCGas, Water/Sanitary
06/14/2022——Gas, Water/Sanitary
10 projects · most recent 12/05/2025
General Wiring Lighting
FiledStatusContractorScope
12/05/2025Permit IssuedMETROPOLIS ELECTRIC CORP1 meters, 1 new_meters
11/15/2024CompleteSPECTRUM ON BROADWAY-ELEC—
05/18/2023Permit IssuedWELSBACH ELECTRIC CORP.—
05/18/2023Permit IssuedWELSBACH ELECTRIC CORP.—
04/08/2022CompleteDIFALZO ELECTRIC NY, INCGeneral Wiring
01/22/2021CompleteNEWBRIDGE ELECTL CONTNG—
01/11/2021CompleteGMC ELECTRICAL INCGeneral Wiring, Lighting
11/16/2020CompleteGMC ELECTRICAL INC—
09/24/2019CompleteMETROPOLIS ELECTRIC CORPGeneral Wiring
03/12/2019CompleteTOP SHELF ELECTRIC CORP—
1 project · most recent 06/02/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
06/02/2026Permit IssuedDORIA SCAFFOLDING LLCSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
03/31/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
03/12/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/12/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
01/02/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/10/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/12/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/21/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/20/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/07/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/10/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/16/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/23/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/13/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/23/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 133
DateRequirementInspectorRole
06/02/2026Structural Stability – Alterations of existing buildingsZELJKO STEVANOVICspecial
06/02/2026Post-installed AnchorsZELJKO STEVANOVICspecial
01/29/2026Fire-Resistant Penetrations and JointsALBERT ZIRINOspecial
01/05/2026Fire-Resistant Penetrations and JointsALBERT ZIRINOspecial
05/16/2025Sprinkler SystemsALBERT ZIRINOspecial
03/25/2025Maintenance informationCHRISTOPHER BEHLEenergy_progress
03/25/2025FinalMICHAEL KALINOWSKIprogress
03/25/2025Fire-Resistant Penetrations and JointsCHRISTOPHER BEHLEspecial
03/25/2025Post-installed AnchorsCHRISTOPHER BEHLEspecial
03/25/2025Mechanical SystemsCHRISTOPHER BEHLEspecial
03/25/2025Shutoff dampersCHRISTOPHER BEHLEenergy_progress
03/25/2025HVAC-R and service water heating equipmentCHRISTOPHER BEHLEenergy_progress
03/25/2025Duct leakage testing, insulation and designCHRISTOPHER BEHLEenergy_progress
03/25/2025HVAC-R and service water heating system controlsCHRISTOPHER BEHLEenergy_progress
03/14/2025Mechanical SystemsCHRISTOPHER BEHLEspecial
03/14/2025Post-installed AnchorsCHRISTOPHER BEHLEspecial
03/14/2025Duct leakage testing, insulation and designCHRISTOPHER BEHLEenergy_progress
03/14/2025Shutoff dampersCHRISTOPHER BEHLEenergy_progress
03/14/2025HVAC-R and service water heating equipmentCHRISTOPHER BEHLEenergy_progress
03/14/2025HVAC-R and service water heating system controlsCHRISTOPHER BEHLEenergy_progress
03/14/2025Maintenance informationCHRISTOPHER BEHLEenergy_progress
03/14/2025FinalMICHAEL KALINOWSKIprogress
03/14/2025Fire-Resistant Penetrations and JointsCHRISTOPHER BEHLEspecial
03/13/2025Public Assembly Emergency LightingRICHARD GREENWALDprogress
02/20/2025Fire-Resistant Penetrations and JointsCHRISTOPHER BEHLEspecial
Latest 25 of 133.
▾Documents — 546 on file (BIS + DOB NOW)
▸Plans & Drawings65
▸DOB NOWPlans/Sketch19
08/31/2026B00609686-I1Request digital key ↗
08/31/2026B00609711-I1Request digital key ↗
08/31/2026B00609696-I1Request digital key ↗
Showing 3 of 19 on file for this type
▸DOB NOWPlans/Sketch - Plumbing13
09/02/2026B00225370-P2Request digital key ↗
09/02/2026B00225370-I1Request digital key ↗
09/02/2026B00255756-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly9
09/02/2026B00349681-P1Request digital key ↗
09/02/2026B00349965-P1Request digital key ↗
09/02/2026B00349973-P1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems7
09/02/2026B00224591-I1Request digital key ↗
09/01/2026B00460473-I1Request digital key ↗
08/31/2026B00218816-P2Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler5
09/02/2026B00225370-I1Request digital key ↗
08/22/2026B00323425-I1Request digital key ↗
08/15/2026B00225370-P2Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed4
09/02/2026B00140817-I1Request digital key ↗
08/15/2026B00140817-P3Request digital key ↗
08/15/2026B00140817-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Standpipe3
09/02/2026B00225370-I1Request digital key ↗
08/15/2026B00225370-P2Request digital key ↗
08/15/2026B00225370-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural2
09/01/2026B00450741-I1Request digital key ↗
08/15/2026B00450741-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Boiler Equipment1
09/02/2026B00356555-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
09/01/2026B00463510-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/02/2026B00146679-I1Request digital key ↗
▸Applications & Permits75
▸BISPLAN / WORK APPROVAL APPLICATION45
12/05/2025321927322Open ↗
11/26/2025340736617Open ↗
02/21/2025321773121Open ↗
Showing 3 of 45 on file for this type
▸BISWORK PERMIT APPLICATION18
06/28/2023340736617Open ↗
01/03/2022321773121Open ↗
12/16/2021321773121Open ↗
Showing 3 of 18 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION9
05/20/2022322162896Open ↗
03/05/2021340804160Open ↗
03/05/2021340804160Open ↗
Showing 3 of 9 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
03/08/2021340804160Open ↗
02/08/2021340804160Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
07/29/2021321773121Open ↗
▸Zoning, Tax Lot & Property Records9
▸BISZONING APPEAL2
04/11/2019321773121Open ↗
04/11/2019321773121Open ↗
▸BISZONING DIAGRAM2
12/04/2020321773121Open ↗
06/10/2019321773121Open ↗
▸BISFLOOD ZONE DESIGN CERTIFICATION1
07/14/2020340736617Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
09/01/2020321773121Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISZONING EXHIBIT II: CERTIFICATION1
09/01/2020321773121Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
05/19/2022322162896Open ↗
▸Seals & Professional Certifications191
▸DOB NOWProgress Inspector Seal & Signature59
09/02/2026B00224591-I1Open ↗
09/02/2026B00224591-I1Open ↗
09/02/2026B08018686-P1Open ↗
Showing 3 of 59 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature59
09/02/2026B00146679-I1Open ↗
09/02/2026B00140817-P1Open ↗
09/02/2026B00140817-P3Open ↗
Showing 3 of 59 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature44
09/17/2026B00271504-P2Open ↗
09/02/2026B00224591-I1Open ↗
09/02/2026B00323425-P2Open ↗
Showing 3 of 44 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION15
12/13/2019321798854Open ↗
12/04/2019321798854Open ↗
12/04/2019321798854Open ↗
Showing 3 of 15 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
02/07/2021340804160Open ↗
07/14/2020340736617Open ↗
Showing 2 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE3
02/07/2021340804160Open ↗
06/30/2020340736617Open ↗
01/03/2020340709095Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
03/15/2019321927322Open ↗
Showing 1 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
03/15/2019321927322Open ↗
Showing 1 of 2 on file for this type
▸Trade Schedules & Equipment6
▸BISSCHEDULE B - PLUMBING2
02/24/2020340598507Open ↗
Showing 1 of 2 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
03/16/2020340598507Open ↗
03/15/2019321927322Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA1
05/23/2022321773121Open ↗
▸Safety & Tenant Protection9
▸BISSTREET TREE CHECKLIST3
05/18/2021321773121Open ↗
03/05/2021340804160Open ↗
Showing 2 of 3 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
12/17/2018321773121Open ↗
Showing 1 of 2 on file for this type
▸BISTenant Protection Plan and Notes1
03/18/2019321927322Open ↗
▸BISSTREET TREES SITE PLAN1
05/18/2021321773121Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
12/17/2018321773121Open ↗
▸BISBPP: STREET TREES SITE PLAN1
03/05/2021340804160Open ↗
▸Environmental & Asbestos38
▸DOB NOWDEP ACP-5: Asbestos Assessment Report25
09/02/2026B00146679-I1Open ↗
09/01/2026B00460473-I1Open ↗
08/28/2026B08001613-I1Open ↗
Showing 3 of 25 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)8
06/30/2020340736617Open ↗
04/11/2019321773121Open ↗
03/18/2019321927322Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
01/14/2021340709095Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION1
07/19/2022321773121Open ↗
▸Energy Compliance26
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY8
02/22/2022321773121Open ↗
08/27/2021321773121Open ↗
08/17/2021321773121Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
03/18/2019321927322Open ↗
12/17/2018321773121Open ↗
Showing 2 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
11/23/2021321798854Open ↗
10/19/2021340709095Open ↗
05/28/2021340598507Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWEN2: As Built Energy Analysis4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
07/14/2020340736617Open ↗
Showing 1 of 3 on file for this type
▸BISTR8: ENERGY CODE PROGRESS INSPS TECHNICAL REPORT1
01/07/2021340709095Open ↗
▸Inspections & Test Reports30
▸BISTECHNICAL REPORT: RESPONSIBILITY23
02/23/2022321798854Open ↗
02/22/2022321773121Open ↗
11/23/2021321773121Open ↗
Showing 3 of 23 on file for this type
▸BISSOIL REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPOST-INSTALLED ANCHORS1
02/22/2022321773121Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPILING (TR-5) 27-7211
12/04/2019321798854Open ↗
▸Approvals, Objections & Sign-offs27
▸BISSCHEDULE A - OCCUPANCY / USE12
10/11/2022321773121Open ↗
09/27/2022321773121Open ↗
09/13/2022321773121Open ↗
Showing 3 of 12 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
07/14/2020340736617Open ↗
07/14/2020340736617Open ↗
07/09/2020340736617Open ↗
Showing 3 of 6 on file for this type
▸BISSUPERSEDING LETTER5
01/03/2022321773121Open ↗
12/16/2021321773121Open ↗
01/12/2021321773121Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
10/21/2021340709095Open ↗
05/28/2021340598507Open ↗
Showing 2 of 3 on file for this type
▸BISFINAL1
01/07/2021340709095Open ↗
▸Cost, Insurance & Ownership17
▸BISCOST AFFIDAVIT12
02/23/2022321798854Open ↗
05/28/2021340598507Open ↗
11/10/2020321798854Open ↗
Showing 3 of 12 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE3
01/03/2022321773121Open ↗
03/30/2021321773121Open ↗
01/12/2021321773121Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
10/19/2021340709095Open ↗
▸BISCOST AFFIDAVIT ESTIMATE: (PW3)1
02/09/2021340709095Open ↗
▸Filing & Intake Forms34
▸BISADDITIONAL INFORMATION25
02/27/2025321773121Open ↗
11/30/2022321773121Open ↗
05/20/2022322162896Open ↗
Showing 3 of 25 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET5
02/07/2021340804160Open ↗
07/14/2020340736617Open ↗
01/03/2020340709095Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING COVER SHEET4
04/01/2022322162896Open ↗
06/17/2019321967109Open ↗
03/15/2019321927322Open ↗
Showing 3 of 4 on file for this type
▸Other Documents19
▸DOB NOWLowest Floor Elevation Plan3
09/02/2026B00225370-I1Open ↗
09/02/2026B00255756-I1Open ↗
08/31/2026B00218816-I1Open ↗
▸DOB NOWFEMA Elevation Certificate (086-0-33)/Flood Proofing Certificate (086-0-34)3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISFEMA ELEVATION CERT (086-0-33)/ FLOODPROOFING CERT (086-0-34)2
03/11/2022321773121Open ↗
03/18/2019321927322Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
04/01/2022322162896Open ↗
01/07/2021340709095Open ↗
▸BISSUBSTANTIAL IMPROVEMENT CALCULATIONS2
07/14/2020340736617Open ↗
Showing 1 of 2 on file for this type
▸BISPLOT DIAGRAM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWAdditional Documents (Photos)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISBSA VARIANCE1
08/05/2020321773121Open ↗
▸DOB NOWCalculations1
08/16/2026B01410517-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/16/2026B01410517-I1Open ↗